Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹51.5 LAccepted-AOC A 52 CHANAKYA PLACE NEW DELHI BRANCH OFFICE B 175 NANDGRAM GHAZIABAD PIN CODE 110045 | NEW DELHI | NEW DELHI | DELHI | 110045 | L1 | Accepted-AOC L1 RATE IS BELOW | |
| 2 | l2₹52.6 L+₹1.1 L (2.10%)Rejected-Finance | l2 | Rejected-Finance L1 RATE is below |
Tender Value
₹60.9 L
EMD Value
₹1.2 L
Closing Date
5 Jan 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE, MGCCC, BULANDSHAHR
OFFFICE OF SE, MGCCC, BULANDSHAHR
Construction of V.R.B. CUM FALL AT KM. 23.600 OF HASANPUR KY LOT NO 3
2021_UPIDC_657931_2
02/SE/2021-22
Open Tender
Civil Works - Canal
Item Rate
90 days
HASANPUR
2 documents required · 2 mandatory
₹2,714
₹1.2 L
22 Apr 2022
31 Dec 2021
5 Jan 2022
31 Dec 2021
5 Jan 2022
31 Dec 2021
31 Dec 2021 - 5 Jan 2022
90 days
Amount
Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth as per site requirement and with removal and proper disposal of surplus earth including all cost of material, labour, T&P etc. as per directed by engineer-in-charge for proper completion of work.
Ordinary Form for Cement Concrete Block including cost of all material, labour, T&P, etc. as per directed by engineer in charge complete for proper completion of work.
Supply and laying of stone grit size 10 to 20 mm in 50mm gap between concrete block and inverted filter including cost of all material labour T&P etc. as per directed by engineer in charge complete for proper completion of work.
Supply and laying of Shingle size 4.75 to 10 mm in inverted filter including cost of all material labour T&P etc. as per directed by engineer in charge complete for proper completion of work.
Supply and laying of Coarse Sand in inverted filter including cost of all material labour T&P etc. as per directed by engineer in charge complete for proper completion of work.
Cement Concrete in (1:2:4) M15 mix with Cement, Coarse Sand (F.M. not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc. as per directed by engineer in charge complete for proper completion of work
Providing and fixing Centering & shuttering for P.C.C. work of Cut off, Box etc. including cost of all material, labour, T&P, all lifts and leads, etc complete for proper completion of work as per directed by engineer in charge .
Cement Concrete in (1:1.5:3) M20 mix with Cement, Coarse Sand (F.M. not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc. as per directed by engineer in charge complete for proper completion of work
Centering & shuttering fo R.C.C. work in defferent parts of structures all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P. etc.
Providing & Fixing 20mm thick Expansion Joint with angle iron both side & M.S. plate carring & filling of filler material of bitumin soil dust & Coarse Sand (F.M. Not less than 2.00), etc complete for proper completion of work.
Cutting, Bending, Binding & Placing in position of steel reinforcement with all wastage, carriage and including all labour material and T&P etc complete for proper completion materials, labour and T&P etc.
Cement Concrete in (1:1:2) M25 mix with Cement, Coarse Sand (F.M. not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc. as per directed by engineer in charge complete for proper completion of work
Supply and laying of Local Compacted Sand including cost of all material labour T&P etc. as per directed by engineer in charge complete for proper completion of work.
Providing and fixing of 75 mm Dia P.V.C. Pipe including cost of all material, labour, T&P etc for proper completion of work
Provide & Laying Boulder 40.00 to 70.00 kg.wt in Launching Apron with all lead and lift including cost all labour, T&P material etc complete for proper completion of work as per direction of Engineer - in charge.
M-100 Brick on edge paving i/c Joints filleds with sand including cost of all material, labour, T&P etc for proper completion of work complete as directed by Engineer-in- charge.
Providing and Fixing of BM Plate for proper completion of work as per directed by engineer in charge.
Providing and Fixing of Year Plate for proper completion of work as per directed by engineer in charge.
M/S VASUDEV CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .