| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.2 LAccepted-AOC SANTHOSH BHAVAN PADAMUGAL KOCHI PIN 682030 | KOCHI | ERNAKULAM | KERALA | 682030 | ₹11.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹11.9 L+₹68,256.27 (6.09%)Rejected-AOC | ₹11.9 L+₹68,256.27 (6.09%) | L2 | Rejected-AOC L2 |
| 3 | L3₹12.0 L+₹76,756.83 (6.85%)Rejected-AOC THANIMOLAL HOUSE MEENANGADI WAYANAD | MEENANGADI | WAYANAD | KERALA | ₹12.0 L+₹76,756.83 (6.85%) | L3 | Rejected-AOC L3 |
| 4 | L4₹12.1 L+₹90,939.79 (8.11%)Rejected-AOC | ₹12.1 L+₹90,939.79 (8.11%) | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | RITECH SURVEYING AND ENGINEERING LLP L4 | Akhil Paul L3 | AA AND S CONSTRUCTIONS L1 | VINAYA KRISHNAN L2 |
|---|---|---|---|---|---|---|---|
| 1.00Investigation | |||||||
| 1.00 | 56.13:Providing access to the site clearing site and making good for surveying in order to provide clear line of site devoid of any hindrance due to vegetation etc. and clearing areas for station points (This item is applicable only for sites without access such as in case of new road formation, bridge and building sites at in accessible locations). | 7.18 | Hectare | 4,173 ₹29,945.45 | 4,500 ₹32,292 | 4,000 ₹28,704 Lowest | 4,147 ₹29,758.87 |
| 1.00 | 56.12.b:Total station surveying and preparation of site plan - Plain built up area with hindrance to line of sight due to buildings/structures. | 21.53 | Hectare | 12,000 ₹2,58,336 | 10,000 ₹2,15,280 Lowest | 15,000 ₹3,22,920 | 11,000 ₹2,36,808 |
| 1.00 | OD125520/2025-2026:Preparing alignment for the proposed road and drawing out a suitable alignment meeting all requirements of Indian Road Congress(IRC) and giving the plinth area of each building with the type of the building like residential or commercial . Also satisfying the Engineering aesthetic and economic requirement designing of horizontal curves (wherever feasible) including spiral transitions and vertical curves after finalizing the alignment and also preparing the LS and CS at an interval of 10m C/C, Plan and Profile, Proposed formation level ,detailed drawings of all the proposed structures like retaining wall ,culverts etc.and all provisions of traffic safety measures .quantity
calculations ,detailed estimate ,designs and preparing DPR (5 copies)with all details annexures etc. complete as per the direction of dptl. officer at site.etc. complete | 11.96 | km | 13,354 ₹1,59,713.84 | 15,000 ₹1,79,400 | 8,000 ₹95,680 Lowest | 12,000 ₹1,43,520 |
| 1.00 | OD125803/2025-2026:Conducting soil test, at suitable intervals, including taking samples, testing CBR Value,
submitting the reports etc complete | 26 | each | 6,500 ₹1,69,000 | 6,000 ₹1,56,000 Lowest | 8,000 ₹2,08,000 | 10,000 ₹2,60,000 |
| 1.00 | OD125856/2025-2026:Conducting Benklemen beam deflection test at 50m intervals as per the
specification and furnishing the test report as directed by the engineer. | 11.96 | km | 10,900 ₹1,30,364 | 1,000 ₹11,960 Lowest | 11,000 ₹1,31,560 | 12,000 ₹1,43,520 |
| 1.01 | OD125915/2025-2026:Conducting classified traffic count at one station. Taking traffic count in both directions at selected locations for7days 24 hours continuously by recording the classified volume count in the prescribed format attached, including provision for engaging and compiling the data and submitting the same in hard andsoft copy etc complete as per the instructions of officials. | 8 | no | 45,000 ₹3,60,000 | 45,000 ₹3,60,000 | 30,000 ₹2,40,000 | 19,000 ₹1,52,000 Lowest |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.78 | cum | 10,000 ₹7,830 | 5,504 ₹4,309.63 | 11,000 ₹8,613 | 4,000 ₹3,132 Lowest |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 13.32 | sqm | 1,000 ₹13,320 | 230 ₹3,063.6 Lowest | 350 ₹4,662 | 10,000 ₹1,33,200 |
| 1.01 | 5.22.5:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelHard drawn steel wire fabric | 46.98 | kilogram | 125 ₹5,872.5 | 70 ₹3,288.6 Lowest | 100 ₹4,698 | 280 ₹13,154.4 |
Tender Value
₹14.2 L
EMD Value
₹35,599
Closing Date
11 Feb 2026, 4:00 pmClosed
EXECUTIVE ENGINEER
KRFB PMU DIVISION KANNUR
Investigation work
2026_KRFB_833097_1
PWD/KR/TR/15322/2025_3_1_1/1
Open Tender
Civil Works - Roads
Item Rate
90 days
Kannur Hill highway
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹35,599
Yes
4 Aug 2026
3 Feb 2026
13 Feb 2026
3 Feb 2026
11 Feb 2026
3 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Investigation | |||||
| 1.001 | 56.13:Providing access to the site clearing site and making good for surveying in order to provide clear line of site devoid of any hindrance due to vegetation etc. and clearing areas for station points (This item is applicable only for sites without access such as in case of new road formation, bridge and building sites at in accessible locations). | - | Hectare | - | - |
| 1.002 | 56.12.b:Total station surveying and preparation of site plan - Plain built up area with hindrance to line of sight due to buildings/structures. | 1 | Hectare | - | - |
| 1.003 | OD125520/2025-2026:Preparing alignment for the proposed road and drawing out a suitable alignment meeting all requirements of Indian Road Congress(IRC) and giving the plinth area of each building with the type of the building like residential or commercial . Also satisfying the Engineering aesthetic and economic requirement designing of horizontal curves (wherever feasible) including spiral transitions and vertical curves after finalizing the alignment and also preparing the LS and CS at an interval of 10m C/C, Plan and Profile, Proposed formation level ,detailed drawings of all the proposed structures like retaining wall ,culverts etc.and all provisions of traffic safety measures .quantity
calculations ,detailed estimate ,designs and preparing DPR (5 copies)with all details annexures etc. complete as per the direction of dptl. officer at site.etc. complete | - | km | - | - |
| 1.004 | OD125803/2025-2026:Conducting soil test, at suitable intervals, including taking samples, testing CBR Value,
submitting the reports etc complete | - | each | - | - |
| 1.005 | OD125856/2025-2026:Conducting Benklemen beam deflection test at 50m intervals as per the
specification and furnishing the test report as directed by the engineer. | - | km | - | - |
| 1.006 | OD125915/2025-2026:Conducting classified traffic count at one station. Taking traffic count in both directions at selected locations for7days 24 hours continuously by recording the classified volume count in the prescribed format attached, including provision for engaging and compiling the data and submitting the same in hard andsoft copy etc complete as per the instructions of officials. | - | no | - | - |
| 1.007 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.008 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | - | sqm | - | - |
| 1.009 | 5.22.5:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelHard drawn steel wire fabric | 1 | kilogram | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1400822.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
epayedited.pdf
Other Document • 0.06 MB
BOQ_1400822.xls
BOQ • 0.30 MB
SBD.pdf
Tender Documents • 1.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .