Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹37.2 LAccepted-Finance BOOTY SADAR RANCHI 835219 | RANCHI | RANCHI | JHARKHAND | 835219 | ₹37.2 L | L 1 | Accepted-Finance Lowest Bid. |
| 2 | L 2₹38.4 LRejected-Finance AT UPPER BOOTY NEAR KRISHNA NURSING HOME P S SADAR RANCHI JHARKHAND 835217 | RANCHI | JHARKHAND | 835217 | ₹38.4 L | L 2 | Rejected-Finance Not lowest bid. |
Tender Value
₹38.0 L
EMD Value
₹76,500
Closing Date
4 May 2026, 2:00 pmClosed
GM, Transmission Zone-II, Dumka
GM, Transmission Zone-II, Dumka, Maharo, Dumka
Routine patrolling, Preventive Breakdown Maintenance of 220kV Dumka-Rupnarayanpur DC Transmission line,220 KV DC Dumka-Govindpur Transmission Line and 132 KV D/C Dumka-Jarmundi Transmission Line, for the period from 16.05.2026 to 31.03.2027
2026_JSEB_112809_1
eNIT No 23/PR/JUSNL/2026-27
Open Tender
Repair and Maintenance Services
320 days
Dumka Division
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹76,500
Yes
14 May 2026
13 Apr 2026
5 May 2026
13 Apr 2026
4 May 2026
13 Apr 2026
Routine Monthly Patrolling of 220 kV & 132 kV Transmission Lines including tree prunning, repositioning of OPGW, checking, tightening & positioning of fasteners etc and back filling of Earth errosion of tower legs along the corridor and vehicle with fuel & driver required for the work under Transmission Division, Dumka.
Trip top Patrolling of 220 KV Transmission lines including tree prunning along the corridor with complete checking and sorting out the minor causes of tripping and vehicle with fuel & driver required for the work.
Break-Down and Scheduled Maintenance of Transmission lines.
Tightening of jumper in transmission tower (74 +52+38 Angle Towers)
Mobilisation of Labourers (one gang should consist of 20 person)
Demobilisation of Labourers (one gang should consist of 20 person)
Transportation of other GSS equipments, transmission line materials inclusive of ERS including loading, unloading of the equipment/materials by Small / Medium size truck from transmission central store, Deoghar or other GSS to different sites/locations of line
Sub Total (A)
Sub Total (B)
CGST @ 9 % on Sub-Total (B)
SGST @ 9 % on Sub-Total (B)
Sub Total (C)
Labour Cess @ 01 %
Grand Total Rs.
(Say Rs.)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
23dmkrpngdplinetenderdocuments.pdf
Tender Documents • 1.43 MB
DmkRupnarayapurGovindpurlinepricepartII.xls
Additional Documents • 0.06 MB
Download all tender documents and submit your bid