Tender ID
Tender Value
₹94.3 L
EMD Value
₹99,000
Closing Date
6 Apr 2026, 6:00 pmClosed
Executive Engineer, R and B Division, Ahmedabad.
Supply of black trap machine crushed stone aggregates of Stone Dust of approved quality from quarry to Government hot mix plant site at Bavla, Dist.: Ahmedabad. (2nd attempt)
290247
SK-07 OF 2025-26
Open
Civil Works - Roads
Works
Ahmedabad
3 documents required · 3 mandatory
₹2,400
Executive Engineer, R and B Division, Ahmedabad.
₹99,000
25 Mar 2026
25 Mar 2026
25 Mar 2026
6 Apr 2026
25 Mar 2026
4. Valid Bank solvency certificate of 20 % of the Estimated cost.
5. PAN Number issued by Income Tax department.
6. GST registration number.
7. Electric bill paid for quarry of any one month during the last year.
8. Crushing unit duly certified by S.E. Mechanical Circle
9. Annual Turnover of any one year of the last five financial year (i.e. 2020-21 to 2024-25) should be
not less than Rs.100.00 Lacs. (The turnover certificate should be certified by Chartered
Accountant only).
10.Work completion certificate having Experience for similar type of 2 (Two) work as a prime
Supplier in Govt. / Semi Govt. / Municipal Corporation / Private Firm completed during last five
financial years (i.e. 2020-21 to 2024-25) issued by concerned authority in along with self-attested
copy of TDS certificates. (Similar work means only Supply of machine crushed stone aggregate
for work executed during last five years i.e.2020-21 to till last date of uploading of the Bid)
When employer of similar work is Government / Semi Government / Municipal Corporation
then work experience shall be in the form of “Form 3-A”.
When employer of similar work is not a government, following need also to be furnished. (a)
Self attested copy of Work Order or vendor registration, (b) Self attested copy of Completion
certificate or Invoice
11. Undertaking / Self Declaration / Binding on firm’s letter pad for financial capability and not
defaulter in any other financial institute and as well as past history status i.e. for “NO POLICE
CASE OR COURT CASE” against Organization.
12. Minimum 30 (Thirty) Tipper Trucks / Dumper. Machinery ownership document (like R.C. Book /
(I) Site visit (if any ) Not Applicable.
(II) Pre-bid Conference (If any)
Not Applicable.
(iii) Submission of EMD. Tender Demand Draft for Tender fee & FDR for EMD shall be submitted in
fee and other Documents electronic format only through online (by scanning) while uploading
the bid. This submission shall mean that EMD & Tender Fee is
during office hours
received. Accordingly offer of those shall be opened whose EMD &
Tender Fee received electronically. However, for the purpose of
realization of demand draft. Bidder shall send the Demand Draft in
original through R.P.A.D. so as to reach to Executive Engineer at the
time of tender opening or send the same through R.P.A.D so as to
reach to Executive Engineer, R & B Division, C–2, Bahumali Bhavan,
Drive–in Road, Vastrapur, Ahmedabad – 380 052 within 7 Days from
the opening date of tender. Penaltative action for not submitting
Demand Draft in original to E.E. by bidder shall be initiated.
Any documents in supporting of bid shall be submitted in electronic
format only through online (by scanning etc.) and hard copy will not
be accepted separately.
(iv) Online Opening of Tender 07/04/2026; 12:00 Hrs.
Bidders can download the tender document free of cost from the website.
Bidders have to submit Technical bid as well as Price bid in Electronic format only on above
mentioned website till the Date & time shown above.
Offers in physical form will not be accepted in any case.
All bids should be digitally signed, for details regarding digital signature certificate and related
training involved the below mentioned address should be contacted:
(n)Code solutions
A division of GNFC
301, GNFC Info tower, Bodakdev,
Ahmedabad- 380 054 ( India )
E-mail: [email protected]
Other Terms & Conditions as per detailed tender documents
Deputy Executive Engineer Executive Engineer
R & B Sub Division No. 2 R & B Division
Ahmedabad Ahmedabad
COMPANY / FIRM RELATED INFORMATION:
1 Name of the organization
2 Address of the organization
3 Name & Particulars of the Authorized
Representative for the details furnished
4 Type of the Organization including particulars
of Proprietor / Partners / Directors
(Sole Proprietorship, Partnership, Private Ltd.,
Co-operative Body etc.)
5 Quarry Details
1) Name of Village, Taluka, District
2) Lease Valid Up to Date
6 Crushing Unit Certificate Details
1) SE Mech. (R & B) Circle, Ahmedabad letter
2) Crushing Unit Valid Up to Date
7 Information about Registered office, Head
office and Branch office.
8 Details of Bank Solvency available
Amount of Solvency
9 Annual turnover of the firm for the last 5 Annual Turnover (Rs. In Lakhs)
financial years
Deputy Executive Engineer Executive Engineer
R & B Sub Division No. 2 R & B Division
Ahmedabad Ahmedabad
STATEMENT SHOWING THE DETAILS OF SIMILAR TYPE OF WORK EXPERIENCE COMPLETION CERTIFICATE
Sr. no. Name of work / Name of organization Work order no. and Time limit to execute Amount of Work completion
Details of supply of on where work date / work / Completed work certificate / Work Order /
materials executed / Vendor Registration Time period details / Invoice uploaded
Materials supplied Supply Yes/No
Mandatory Datasheet: The above necessary information shall be supported with documents in electronic format only through online (By
scanning) While uploading the bid.
Deputy Executive Engineer Executive Engineer
R & B Sub Division No. 2 R & B Division
Ahmedabad Ahmedabad
GUJARAT STATE ROAD AND BUILDING DEPARTMENT
ROAD AND BUILDING DIVISION, AHMEDABAD
SUPPLY OF MATERIALS
1. If the tender is accepted, no separate agreement shall be necessary and the tender
itself shall be treated as the contract
2. Exempted from stamp duty, vide GR No. 368-A1732, dated 9-10-1989
Name of Work: Supply of black trap machine crushed stone aggregates of Stone
Dust of approved quality from quarry to Government hot mix
plant site at Bavla, Dist.: Ahmedabad. (2nd attempt)
1. Estimated Amount Rs.
2. Earnest Money Rs.
An FDR favour of the Executive Engineer, R&B Division, Ahmedabad on the
Nationalized Bank must accompany with the sealed cover.
3. Bid Document Downloading End Date: 06-04-2026 up to 18:00 Hrs.
4. Last Date & Time for Receipt (Submission) of Bids 06-04-2026 up to 18:00 Hrs.
5. Bid Opening Date (If Possible): 07-04-2026 at 12:00 Hrs.
GENERAL RULES & DIRECTION FOR THE GUIDANCE OF
1. The tender document shall have to be filed in on line tender.
2. The tenders received Online at n-procure will only be considered
3. The tender for the work shall remain open for a period of (120*) days form the
stipulated date of receiving of the tenders for this work and that the tenderer is
not allowed to withdraw of modify the offer on his own after handing over the
tender to postal authorities for dispatch. If any tenderer withdraws of makes
any modification/s or additions in the terms and condition of this tender, which
are not acceptable to the Government (R&B Department) them, the Govt. shall
without prejudice to any other right or remedy at liberty to forfeit in full the
said earnest Money absolutely.
4. The tender will be liable to be rejected outright if:
(i) The tender proposes any alternation in the work specified or in the time
allowed for carrying out the work or any condition or correction made in any
code or mode of schedule of materials of specifications.
(ii) Any of the pages or pages or the tender is/are removed or replaced.
5. (I) In the event of nay discrepancy in the several documents forming the
contract or in any one document the following order of precedence should
(a) Dimension and quantities:
(ii) Schedule materials of the tender form
(iii) Specifications
On drawings, figured dimensions unless obviously incorrect will be followed
preference to scaled dimensions.
(b) Description:
(i) Schedule of Materials of the tender form
(iii) Specifications
7. Packing and notification of dispatch:
The tenders particular attention is invited to the conditions of contract under
which he has tendered in regards to packing and notifications of delivery and dispatch.
It is essential that packing notes and priced invoices shall be furnished to the
consignee in respect of every consignment. The railway Receipts should be forwarded
to the consignee immediately after the dispatch of stores. Otherwise charges, if any
paid by the consignee, will be deducted from supplier's bill.
8. The total costly of the delivery ex-go down F.O.R/Free at destination at Govt.
Plant Ramnagar at Bavla comes to Rs.94,32,534.56 if applicable, in the case of
dealers and freight and/or insurance charges, if any, should be claimed as separate
items in the bill.
Note: Packing and forwarding charges from go down to Railway station can
only be claimed when the rates is ex-go down. In the case of F.O.R. and free at
destination quotation, the above charges are to be borne by the supplier.
Inspection will be done by the Executive Engineer R&B Division
Ahmedabad or by any office authorised by him on his behalf or by the consignee at
(a) The entire materials order will have to be offered for inspection in open
condition. If required and the same will have to be repacked in such a manner so as to
be suitable for transport without any extra cost.
10. Advance samples:
If required/s the advance sample must be dispatch to the indenting
office/consignee so as to reach him by the date specified. The actual date of dispatch
must be reported promptly to the divisional office and to the consignee. The sample
must be of an acceptable quality & fully representative of the bulk supply. This is an
essential condition of the contract and the Government shall, under no circumstances,
be liable for acceptance of any stores manufactured/supplied by the tenderer before
the sample have been approved.
11. Mode of Transport:
Goods/materials should be consigned to Government Drum Mix Plant at
Ramanagar, Ta: Bavla (please see Schedule attached ) and dispatched by
passenger/goods in trains or by S.T. Buses under the Parcel / Transport scheme of the
Gujarat State Road Transport Corporation - station freight to pay/paid.
N.B. The suppliers are to be booked at full wagon rates wherever available by
the most economical route. In the cases of contract specifying "Free delivery at
destination" at the supplier's expense.
12. Challan for earnest money must accompany the tender. Tenderer may way
earnest money in the form of CROSSED demand draft of FIXED deposit
receipts or DEPOSIT-AT-CALL receipt with a validity period of not less than
six months of a Nationalised or Scheduled or Co-operative Bank having 5year
standing drawn in favour of Executive Engineer/Divisional officer concerned.
Earnest Money by cheque(s) Shall not be accepted. (The instruction laid down
under G.R.P.W.D. No. TNC2175. IB-946-251-Cdt. 12-4-1977 should
invariable be followed).
13. The Executive Engineer or his duly authorised Assistance shall open tenders in
the presence of Tenderer who have submitted tenders of their representative,
who may be present at the time of opening of tenders and he will enter the
amounts of the several tenders in a comparative statement in a suitable form.
Receipts for the earnest money forwarded with the tender, shall be given to the
Tenderer on the day. tenders are opened. In the event of a tender being
accepted the tenderer shall for the purpose of identification, sign copies of the
specification and other documents as may be necessary. In the event of a tender
being rejected. The Executive Engineer shall authorise the Treasury Officer
concerned to refund the earnest.
money to the Tenderer, if the earnest money is deposited into Treasury
on his giving a receipt for the refund of the money.
14. The office competent to dispose of the tender shall have the right of rejection
all or any of the tenders.
15. Every Tender shall, unless exempted in writing by the superintending Engineer,
produce along with his tender, 3 solvency certificate equivalent to not less then
20 percent of the amount put to tender in bid document. Solvency certificate
equivalent to not less then 20 percent of the amount put to tender in bid
document. Solvency certificate shall be obtained from the Collector of the
District within which he resides or a banker's certificate of his financial
stability, shall be produced. If the fails to produce such a certificate, his tender
shall not be considered.
16. Designation and full postal address of consignee:
This intimation shall be given by the Direct demanding Officer in the
requisition order(s).
DECLARTION CERTIFICATE
I/We hereby declare that my/our near relative are not working in this Division or in its
sub-division as an Executive Engineer, Deputy Executive Engineer, Assistant
Engineer, Additional Assistant Engineer, Overseer, Divisional Accountant,
Storekeeper, Manager of Atithi / Vishram Gruh and in the circle as Superintending
Engineer in addition for Panchayat works not working nor having posting as
Chairman of P.W. committee of as incumbent in Jilla Panchayat today.
This agreement made on this ____________________day of 2024 between
Executive Engineer R&B Ahmedabad & __________________________________
(here in after called "the contractor" which expression where the context so requires or
admits shall include his heir, administrators, executors and legal repetitive) of the one
part and THE GOVERNOR OF GUJARAT (here in after called " the Government"
which expression where the context so requires shall include his successors in office
and assignees) of the other part.
Where as the contractor has given tender to the Government for the supply to
the Executive Engineer R&B Division, Ahmedabad (here in after called "Executive
Engineer") of the materials specified in the schedule (Attached) as per delivery
instruction given in the form of tender at the respective prices of rates mentioned
against the said materials in the column provided for the purpose.
And where as such tender has been accepted and the contractor has deposited
with the Executive Engineer, the sum of Rupees _________________________
in ____________________________as security for fulfillment of this agreement.
NOW IT IS HERE BY AGREED BY AND BETWEEN the parties here to as
(1) The contractor has accept the contract on the terms and conditions set
out in the tender Notice No. _- (2025-26) dated - -2024 as well as in the
form of Tender No. D / dated ___________which will hold good
during the period of this agreement.
(2) Upon breach by the Contractor of a of the conditions of this Agreement,
Executive Engineer may by a notice given in writing, rescind, determinate and put to
an end to this Agreement without prejudice to the right Government to claim damages
for antecedent breaches thereof on the part of the contractor and also to reasonable
compensation for loss occasioned by the failure of the contractor to fulfill the
Agreement as certificated in writing by the Executive Engineer. Such certificate shall
evidence of the amount of such compensation payable by the Contractor to the
(3) Upon the determination of this agreement whether by efflux time or
otherwise, after the expiration of 12 months from the date of issuing work order
determination, the said deposit be returned to the contractor by without interest and
after deducting there from any sum due by the contractor to the Government under the
terms and conditions of this agreement.
(4) This Agreement shall remain in force until expiry of the date of delivery
of materials but not with standing any thing contained herein or in the from of, tender
the Government shall not be bound to take the whole or any part of the estimated
quantity here or therein mentioned and may cancel the contract at any time, after
given one month's notice in writing compensation the contractor.
(5) Notice in connection with the Contractor may be given by the Executive
Engineer or his any reprehensive duly authorised by him.
IN WITNESS WHEREOF THE said contractor __________________
____________________have sent his hand hereto and Executive Engineer has, on
behalf of the Governor, Affixed his hand of his office hereto the day and year first
(Signature of Witness)
Signer by Executive Engineer
(name & Designation) Ahmedabad
Place: Ahmedabad
CONDITIONS OF CONTRACT
Clause: 1 security deposit:
The person/persons whose tender may be accepted (hereafter called the
contractor) shall (A) within one day for a contractor of Rs.1000 or less or two days for
contractor of more than Rs. 1000 upto Rs.2000 and so up up to a limit of 10 days for a
contractor Rs. 10000 or more of the receipt by him notification acceptance of his
tender deposit with the Deputy Executive Engineer / Executive Engineer R&B
Division either in cash or in Government Securities endorsed to the Executive
Engineer (if deposit for more than 12 month a sum which with the amount of the
earnest money deposited by him for his tender will made up the full security deposit
or *(B) permit the Government at the time of making any payment to him for the work
done under the contract to duct such sum ** as will (with the earnest money deposited
by him amounting to Rs.99,000.00 of all money so payable such deduction to be held
by the Government by way of security deposit) provided always that in the event of
the Contractor depositing a lump sum way of security deposit at contemplated at (A)
above, then and in such case if the sum so deposited shall not amount to the amount of
this percentage (no exceeding 10%) shall be fixed in every case to suit requirement
e.g. if it is fixed at 8% and the security deposit only amount to 5% of the estimated
cost of materials to be supplied , then 3% shall be deducted from every payment. If the
percentage is fixed of materials to be supplied, then 3% shall be deducted from every
payment. If the Percentage is fixed 10 % and the security deposit to 6% only then 4%
be shall deducted and so on percentage of the total estimated cost of materials to be
supplied it shall be lawful for Government at the time of making any payment to the
contractor for work done under the Contract, make up the full amount of percent by
deducting a sufficient sum form every such payment as last aforesaid. All
compensation or other sums of money payable by the contractor to the Government
under the terms of this contract may be deducted from or paid by the sale of a
sufficient part of hid security deposit or from the interest arising there from or from
any sums which may be due of may become due to the contract by Government on
any accounts whatsoever and in the event of his security deposit being reduced by
reasons of any such deduction or sale aforesaid the contractor shall with 10 days
thereafter make food In cash or Government security deposit or any part thereof. The
security deposit when paid in cash may at cost of the depositor, be converted into the
interest bearing securities provided that the deposit has expressed in writing. If the
amount of the security deposit to be paid in lump sum within the period specified at
(A) above is not paid the tender recovery of the amounts. The security deposit lodged
by a contractor shall be refunded after expiry of 3 months from the date on which the
final bill is paid.
**This deposit will very from 1% to 10% of the estimated of the materials to
be supplied according to the circumstances of the case .no work order will be issued
till the issue about delay is finally decided by the competent authority.
**This percentage where no security deposit is taken will very 5% to 10%
according to the requirement of the case.
Clause No.1: Security Deposit
Security deposit at 5% (five percent) of the Estimated cost recoverable as
1 N.S.C. or Narmada Bond : Amount equivalent of 2.5% (Two and half
percent) of the estimated cost of the work.
2 Percent to be deducted from bills so : 2.50% (Two and half percent) of the estimated
as to make up the total amount, cost of the work.
as to make up the total amount, cost of the work.
required as Security Deposit by the
time half the works has measured
Executive Engineer
Clause -2 Termination of contract:
Should the contractor fail to deliver the materials or any part thereof, within the
contracted period of delivery or incase, the materials are found not in accordance with
prescribed specification and/approved sample, the Executive Engineer shall exercise
his discretionary powers either:
(a) to recover form the Contractor as liquidated damages, a sum not
exceeding one percent of the price of the materials which the Contractor has filed to
deliver as aforesaid per day or part thereof during which the delivery of such materials
may be in arrears, but subject to a maximum limit in the case of and order not
exceeding Rs.1 Lac in value, of 10% in the case of an order exceeding Rs. 1 Lac in
value of 5% of the stipulated price of the materials, sales tax, generals tax, LGST,
CGST, excise duty, packing charges etc. so undelivered of
(b) to purchase from elsewhere on contractor's account and at his own risk
the materials so undelivered of similar description without canceling the contract in
respect of the consignment not yet due for delivery of
(c) to cancel the contract
In event of risk purchase of materials of similar description, the Executive Engineer
shall be final, which will be exercised by him only, when materials of exact
specification are not readily procurable
In the event of action taken under Clause (a) or (b) above, the Contractor shall be
liable for any loss, which the Government may sustain on that account, but the
Contractor shall not be entitled to any saving on such purchase made against default.
The decision on the Executive Engineer shall be final as regard the acceptability of
materials supplied by the Contractor and the Executive Engineer shall not be required
to give any reason in writing or otherwise, at any time for the rejection of materials.
Clause -3 Risk in transit:
Goods/material should be dispatched at carrier's risk, failing which; they should
be properly covered by transit insurance with Government Insurance Fund,
Directorate of Insurance.
The good/material to be inspected before dispatch and a certificate to the effect
(1) The goods/materials are inserted in packages in safe and in sound
conditions, and that.
(2) According to the normal trade practice, the packing used is good to be
furnished by the contractor. Failure to company with this instruction may result in
non-acceptance of transit-risk by the insurance officer.
N.B. Transit - Insurance from ay be obtained from the Directorate of Insurance,
Ahmedabad directly in case the materials are to be insured.
(a) When the food / materials are dispatched from station outside Gujarat
Sate, the Contractor has declared the condition of the packing.
(b) Railway Receipt or parcel receipt of the Gujarat State Road Transport
Corporation should not be sent by V.V.P. as the payments for goods / materials
dispatched, shall be made in ordinary way.
Clause - 4: Date of Delivery
The materials should be delivered / dispatched within 10 (ten) days from the
date of receipt of order for the supply or within the period that may be specified in the
order for the supply of materials.
Note: (i) In the event of contractor's inability to supply goods/ materials by the
stipulated date, the office placing the order must be informed and no supplies will
ordinarily be accepted by the consignee, if delivered late, except on production of a
specific sanction from the officer placing the order.
(ii) Date; of delivery is the date on which acceptable goods/materials have
been offered for inspection either to the Executive Engineer or his authorized
representative or to the consignee.
Clause - 5: Bills
Bills for the materials to be supplied in compliance of this contract must be
prepared in duplicate and sent to the consignee for payment. A copy of the bill should
be sent to the officer who has places the order for record. Intimation should be sent to
Executive Engineer when the full payment of contractor's bill is recovered.
Clause - 6: CGST, SGST, Sales tax, Royalty, Entry Tax, Turn-over Tax,
Testing Charges and Service Tax etc.
(i) CGST / LGST / Sales tax / Turn over tax / Entry Tax, Royalty etc.
where recoverable should be paid and borne by the contractor.
(ii) One percent of estimated cost put to tender for this work shall be
deducted from the running account bills of the quality of materials. For testing of
materials, "Schedule for testing" will be the basis. (Applicable to (R&B. D. Works
Clause - 7: Execution of Agreement
Tenderer will be required to enter into agreement (appended herewith) for the
due performance of the contract.
Clause - 8: Warranty
The goods / stores / articles / materials sold to the buyer under this contract
shall be new, of the best quality (and workmanship) and shall be strictly in accordance
with the specifications and particulars contained / mentioned in the tender and the
Contractor / seller hereby guarantee that the said goods / stres / articles / materials
would continue to conform to the description and quality aforesaid for a period of
12 months from the date of delivery of said goods / Article / materials to the purchaser
and the and that not with standing the facts that the purchaser (Inspector) may have
inspected and / pr approved to said goods / stores / articles / materials, if during the
aforesaid period of 12 months the said goods / stores articles materials be discovered
no to conform to the description and quality aforesaid or have deteriorated (and the
decision of the purchaser in that behalf will be final and conclusive) the purchaser will
be entitled to reject the said goods / stores / articles / materials or such portion thereof
as may be discovered no to conform to the said description and quality. On such
rejection, the goods / stores / articles / materials will be at the Seller's risk and all the
provisions herein contained relating to rejection of goods etc. shall apply. The
contractor / Seller shall if so called upon to do, replace within a period of one month
or such further period, as may be extended from time to time by them purchaser, on
and application made therefore by the Contractor / Seller, the rejected goods / stores /
articles / materials or such portion thereof ; as is rejected by the purchaser and in such
an event the above mentioned warranty period shall apply to the goods / stores /
articles / materials replaces fro the date of the replacement thereof; other wise the
Contractor / seller shall pay to the purchaser such damages as may arise by reason of
the breach of the Condition herein contained. Nothing herein contained shall prejudice
any other right of the purchaser in that behalf under this contract otherwise.
Clause - 9 : Laws (i) This contract shall be governed by the laws in force in
Gujarat State and hall be subject to jurisdiction of the court in the district Head
Quarters of the Executive Engineer signing this contract.
(ii) The marking of all materials supplied must comply with
the requirements of the Indian Acts relating to Merchandise Marks and the rules made
under such Acts.
Clause - 10: Indemnity
The contractor shall at all times, indemnify the Government against, all claims
which may be made in respect of the materials for infringement of any protected by
patent, registration of design or Trade Mark and Shall take all risk of any right
protected by patent registration of the supply from whatever cause arising and the
entire responsibility for the sufficiency of the right, used by him for the fulfillment of
the contract, PROVIDE ALWAYS that in the event of any claim in respect of alleged
breach of Letter Patent, Registered Patent, Registered Patent, Registration of Design,
or Trade Mark being made against the Government, shall notify to the contractor of
the same and the contractor shall be at liberty at his own expenses, to conduct
negotiations for the settlement of any litigation that may arise therefore.
Clause - 11: Insolvency
Should the contractor be adjudicated insolvent or has a receiving order made
against him, or mark or enter into any arrangement or compromise with his creditors,
or suspend payment (or being a company, be wound up either compulsory or
voluntarily) or commit any breach of this contract not herein specially provided for
the Executive Engineer shall have power to declare the contract at an end in which
case the contractor shall be liable to pay to the Government for any extra expense the
Government is thereby put to, but shall not be entitled to any gain or repurchase.
Clause - 12: Breach of Contract
Should the contractor fail to abide by any of the terms and conditions of this
contract, the failure on his part shall constitute a breach of the contract and action as
deemed proper shall be taken against him under clause (2) of this contract.
Clause - 13: Repeat orders
The Executive Engineer reserves his right to place repeat orders for the
quantities up to 50 percent of the quantities for each item as shown in this bid
documents within a period of six months from the date of expiry of contract subject
terms and conditions herein provided as agreed to by the contractor under this tender
mentioned above and he shall accept the same. No-compliance of repeat orders shall
be dealt with under clause "2" of this contract.
Clause - 14: Disputes etc. subject to local court
All questions disputes or difference arising under, out of or in connection with
the contract, if concluded shall be subject to the exclusive jurisdiction on the Court, at
the Headquarters of the Executive Engineer who has signed the contract agreement.
Clause -15: Period of Rate contract
This contract will remained in force for a period of (12) Twelve Month from
the date of issued acceptance letter for this Rate-Contract.
Clause - 16: Premature determination of contract
The Executive Engineer shall, in addition to his powers under other clauses to
determine this contract, have powers to terminate his liabilities there under at any time
by giving one month's (or such shorter period as may be mutually agreed) notice in
writing to the contractor of his desire to do so and, upon expiration of the notice this
contract, shall be determinate without prejudice to the right accrued to the date of
Clause - 17: Certificate
On the completion of the delivery of materials the contractor shall be furnished
with a certificate to that effect, but the delivery shall not be considered to be complete
untill the contractor shall have removed all rejected materials, and shall have the
approved materials stocked or places in such position as may be pointed out to him.
Clause - 18: Action for damages
If the contractor or his workmen shall bread of deface any building, road,
fence, enclosure or grassland or any cultivated land, he shall repair or replace the same
and if any damage has been done, he shall make good the same at his own expense
and n the event of his refusing or failing to do so the damage shall be made good at,
the contractor's expenses, by the officer inviting the tender, who shall deduct the cost
from any sum due or which may become due to the contractor or from his security
deposits or the proceeds of sales thereof or a sufficient portion thereof.
Clause - 19: Delivery on Sundays
No materials shall be brought to the site of the work or stores or delivered on
Sundays without the written permission of the officer in charge of the work.
Clause - 20: Subletting of contract
This contract shall not be sublet with out the written permission of the
Executive Engineer. In the event of the contractor subletting his contractor without
such permission, he shall be considered to have thereby committed a breach of the
contract and shall for felt his security deposit to the Government and shall have no
claim for any compensation or ay loss that may accrue on account of the collection of
the materials or engagement entered into.
Clause - 21: Compensation under the Workmen's Compensation Act
The contractor shall be responsible for and shall pay any compensation to his
workmen which may be payable under the Workmen's Compensation Act. 1923 (VII
of 1923), hereinafter called the said Act for injuries suffered by them. If such
Compensation is paid by the Government as principal under sub-section (i) of Section
12 of the said Act on behalf of the contractor, it shall be recoverable by the
Government form the contractor under Sub-section (2) of the said section. Such
compensation shall be recovered in the manner laid down in Clause-I above.
Clause - 22: Decision of Superintending Engineer to be final
The decision of the Superintending Engineer, for the time being, shall be final,
binding and conclusive on all question relating to the meanings of the condition of
contract and specifications of materials supplied except acceptability of materials in
which case, the decision of Executive Engineer under clause 2 in final.
Clause - 23: No guarantee that materials indicate din the schedule will be
No guarantee can be give that the total number of quantities of materials
indicated in the schedule of the contract will be ordered during the period of the
contract but the Executive Engineer shall purchase from the contractor all such
materials as are detailed in the schedule, which he may require to purchase during the
period of the contract.
Clause - 24: Contractor bound to complete the work at the rates mentioned in
No claim or claims made by the contractor for increased rates on the ground
that the market or other rates included in the contract have risen during the period of
his contract, will be recognized that is to say, the contractor, is bound to complete the
work and / or to supply materials at the fixed rates mentioned in the contract.
Clause - 25: Method of Payments
Payments to contractor will be made by cheques drawn on any Treasury or
Bank within the Division most convenient to him, provided the amount to be paid
exceeds Rs. 100.00 Smaller amounts will be paid in cash.
Clause - 26: Set off of money
Any sum of money due and payable to the contractor (including the security
deposit returnable to the under this contract shall be appropriated by any District
Panchayat / Government and shall be set off against any claim of the Government /
District Panchayat of Gujarat Sate / by the District Panchayat of Gujarat State /
Government for the payment of sum of money arising out of under any other contract
made by the contractor with the Government / District Panchayat of Gujarat Sate, for
the work wholly, financed as grant in aid by Government of Gujarat State when no
such amount for the purpose of the recovery from the contractor against any claim of
the Government / District Panchayat of Gujarat State is available, such recovery shall
be made from the contractor as arrears of land revenue.
Clause - 27: Quantity to be purchased
No define estimated can be given of the quantity or value of the stores required.
The contractor shall be required to supply the same as ordered during the period
covered by the rate contract.
The rate accepted under this contract are firm and fixed for the period of
contract and no variation for risk or fall within the basic costs or taxed during the
period or contract will be allowed.
PERFORMANCE BOND
(See clause no. 1)
(The date of this bond must not be prior to the date of the instrument in connection
with which it is given)
Principal (Contractor)
Sum of bond (express in words and figures)
Contract No. and date of Contract
KNOW ALL MEN BY THESE PRESENT, THAT WE, THE PRINCIPALS AND
SURETY: Above named are held firmly bound unto the
……………………………….. hereinafter called the Employer in the amount stated
for payment of which sum, well and truly to be made, we bind ourselves, our heirs,
executors, Administrators and successors jointly and severally, firmly by these
presents subject to the provisions of which the aforesaid Contractor on demand and
without demand on a claim being made by the Employer.
THE CONDITION OF THIS OBLIGATION IS SUCH : That whereas the principals
have entered in to a contract with the Employer numbered and dates as shown above
and hereto attached for the execution of work Supply of Black Stone Crushed metal of
various size on Drum Mix Plant at Ramnagar, Ta. Bavla, District Ahmedabad.
NOW THEREFORE, if the Principal shall well and truly perform and fulfill at the
undertakings, covenants, terms, conditions and agreements of said contract during the
original terms of the said Contract and any extensions thereof that may be granted b y
the Employer with or without notice to the surety and during the life or any guarantee
required under the contract and shall also well and truly perform and fulfill all the
Undertakings, covenants terms, conditions and agreements of any all duty and unduly
authorised modifications of said Contract that may hereafter be made, notice of which
modifications to the surety being hereby waived or shall pay over, make good and
reimburse to the Employer all loss and damages which the employer may sustain by
reason of failure or default on the part of said Principal so to do.
We ………………………………………………. further agree that the guarantee
herein contained shall remain in full force and effect during the period that would be
taken for the validity of the said Contract, and that it shall continue to be enforceable
till all the dues of the employer under or by virtue of the Contract have been fully paid
and its claims satisfied or discharge or till the Employer certifies that the terms and
conditions and accordingly discharges the guarantee. Unless a demand or claim under
this guarantee is made on us in writing on or before the ……………………………
we shall be discharged from all liability under this guarantee thereafter.
IN WITNESS WHERE OF, the above bounded parties have executed this
instrument under their several seals on the date indicated above the name and
corporate seal of each corporate partly being hereto affixed and these presents duly
signed by its undersigned representatives, pursuant to authority of its governing body.
In the presence of witness
by…………………………………. affix Corporate Seal
Attested Corporate surety
Business address _______________
Affix by ……………………………………………corporate Seal
For and on behalf of the Employer
SCHEDULE OF MATERIAL
Name of Work:- Supply of black trap machine crushed stone aggregates of Stone Dust of approved quality from quarry to Government hot mix plant site at Bavla,
Dist.: Ahmedabad. (2nd attempt)
Description of specification of Total estimated Place of which to Quantities to be Date by which Rate of which materials are to be Unit Total cost of each
materials to be supplied quantity of such be delivered delivered at each delivery at all supplied article inclusive of
materials to be place places must be every demand
supplied (which is completed In Figure In Words
subject to variation)
Supply of black trap machine 14708.00 at Ramnagar, at Ramnagar, Immeediately as MT
crushed stone aggregates of Ta. Bavla Drum Ta. Bavla Drum per Demand.
Stone Dust of approved quality mix Plant site mix Plant site
from quarry to Government hot
mix plant site at Bavla, Dist.:
1 All works shall be carried out as per public work department’s handbook and other specification of Division or MORT&h’s as directed by the
Executive Engineer in charge of work
2 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra
payment shall be made.
3 GST will be paid saperately on the bills as per prevailing rules, and GST TDS will be deducted at a source while making payments of bills as
per Govt. instructions.
Deputy Executive Engineer Executive Engineer
R & B Sub Division No. 2 R & B Division
Ahmedabad Ahmedabad
;NZ 8[g0ZDF\ EZJFDF\ VFJTL AL0 sEFJf H[ CF,GF ,FU] 50TF J[84 ;lJ"; 8[1F S[ VgI lGID D]HAGF WFZF
WMZ6 D]HA VG[ EFZT ;ZSFZzL TYF U]HZFT ;ZSFZzL £FZF U]0; V[g0 ;lJ"; 8[1F sHLPV[;P8LPf SFINFGM VD,
TFP_!q_*qZ_!* YL YI[, K[P T[ wIFG[ ,. .HFZNFZ[ 8[g0Z EFJM EZJFGF ZC[X[ VG[ SMg8=FS8DF\ ,FU]\ 50GFZ K[P T[
wIFG[ ,. .HFZNFZ[ 8[g0Z EFJM EZJFGF ZC[X[ VG[ ;ZSFZzL 9ZFJ[ T[ NZ[ .HFZNFZGF lA,MGF R]SJ6FDF\YL S5FT
SZJFDF\ VFJX[P HLPV[;P8LP V\U[GL TDFD HMUJF.VM .HFZNFZG[ A\WGSTF" ZC[X[ TYF ;ZSFZzL £FZF VF V\U[GF SM.
lJJFNG[ wIFG[ ,[JFDF\ VFJX[ GlCPP H[GL :5Q8 GM\W ,[JLP
PPPPPPPPPPPPPPPPPPPPPPPP SFI"5F,S .HG[Z4
s9[S[NFZzLGL ;CLf DFU" VG[ DSFG lJEFU4
6 Gujarati Condition
;ZSFZzLGF DFU" VG[ DSFG lJEFU4 UF\WLGUZGF
5lZ5+ S|DF\S o 8LV[G;L q !_(_ VF.AL q !*_ q sZ*f TFP5v)v)Z VgJI[G]\P
DF,;FDFG 5]ZM 5F0JFGL J:T]VMGF :5[XLOLS[XG JF\RL ;DHL TYF DFgI GD]GFVM HM.G[ D[ q VDMV[
EFJM EZ[,F K[4 VG[ T[ D]HAGM H ;3/M DF,;FDFG 5]ZM 5F0JF VDM VFYL AF\C[WZL VF5LV[ KLV[P
PPPPPPPPPPPPPPPPPPPPPPPP SFI"5F,S .HG[Z4
s9[S[NFZzLGL ;CLf DFU" VG[ DSFG lJEFU4
s!f D8LZLI<;GF EFJM EZF.G[ VFJ[, IMuITF WZFJTF AWF 8[g0ZMDF\ 9[S[NFZMV[ EZ[, 8SFJFZLG[
wIFG[ ,.G[ 8[g0Z D\H]Z SZJFDF\ VFJX[ VG[ 9[S[NFZzLV[ VF 8[g0Z OMD" VG];FZ SZFZBT SZJFG]\
PPPPPPPPPPPPPPPPPPPPPPPP SFI"5F,S .HG[Z4
s9[S[NFZzLGL ;CLf DFU" VG[ DSFG lJEFU4
6 Gujarati Condition
EFJ 5+S v SZFZBTGL XZTM
VF GLR[ NXF"J[, EFJ 5+S v SZFZBTGL XZTM EFJ EZFGFZG[ Ô[ T[DGF\ EFJM D\H]Z YFI TM SFDGL ;DI
DIF"NF V[S JQF" ;]WLGL A\WG STF" ZC[X[P
DF, ;FDFG 5]ZM 5F0JFGL XZTM
!P__ SJMZL D8LZLI<; TYF :8MG 0:8 ZM0 ;F.0 p5Z CJF,FGF\ .HG[ZGL ;]RGF D]HA 5CM\RTM
SZJF VG[ AFSLGF\ DF, v ;FDFGGF\ EFJM %,Fg8 ;F.8 p5Z DF, 5CM\RTM SZJFGF\ T[DH ZMI<8L
TYF VgI ,FU] 50TF AWF H 8[S; ;FY[GF\ K[P T[DH ;ZSFZzLGF 5|JT"DFG lGID D]HA
S5FT5F+ 8[1F R]SJ6F\GF lA,MDF\YL S5FT SZJFDF\ VFJX[P
ZP__ EFJM %,Fg8 ;F.8 p5Z DF, 5CM\RTM SZJFGF T[DH ZMI<8L TYF VgI ,FU] 50TF AWF H 8[1F
;FY[GF K[P T[DH ;ZSFZzLGF 5|JT"DFG lGID D]HA S5FT5F+ 8[1F R]SJ6F\GF lA,MDF\YL S5FT
#P__ SJMZL CM<0Z S[ H[ RF,] CMI T[JF Ê;L\U %,Fg8 WZFJTF\ CMI T[JF VF;FDLVM H ;ZSFZzLGF\ DFU"
VG[ DSFG lJEFUGF\ 5lZ5+ G\P V[;V[VFZ q !_)_ q Z5_ q !_ q 5$4 TFP!$q_5q)_ TYF
5lZ5+ S|DF\S v V[;VMVFZv!_Z__& q !_$ q ;P! TFPZ5v!vZ__* 5|DF6[ EFJM EZJF
5F+ K[P VgIGF\ EFJM lJRFZ6FDF\ ,[JFDF\ VFJX[ GCL\P ÊXZ H[ RF,] K[ T[GF\ 5]ZFJF ~5[ ÊXZG]\
K[<,] ,F.8 AL,vZÒ ;FY[ H ZH] SZJFG]\ ZC[X[P
$P__ SJMZL D8LZLI<; ;%,FI SZTF\ 5C[,F\ OL<0 ,[AMZ[8ZL sU[ZLfG]\ D8LZLI, 8[:8L\U V[\U[G]\ 5|DF6
5+ ;FD[, ZFBJFG]\ ZC[X[ TYF ,[AMZ[8ZL 5lZ1F6DF\ lGQO/ HGFZ DF,;FDFG DF8[ SM. ZSD
R]SJJFDF\ VFJX[ GCL\P T[DH VFJM NZ[S DF, ;FDFG 9[Z[NFZzLV[ 5MTFGF\ BR[" SFDGL ;F.8
p5ZYL ,. ;F.8 RMbBL SZL VF5JFGL ZC[X[P
5P__ SJMZL DL8LZL<;GF\ EFJM D\H]Z YI[ H]NF H]NF SFDM RF,] YFI tIFZ 5C[,F cc0Lcc OMD"DF\ SZFZBT
SZL lGIDMG];FZ 0L5MhL8 EZJFGL ZC[X[P
&P__ ;%,FI SZ[, D8LZLI,GF\ AL, ;FY[ ;[SXG VMOL;DF\ ZH] SZJFGL ;FY[ ZMI<8L R]SJ6FGF\ D]/
AL, q R,G 56 AL,GL ;FY[ ;FD[, ZFBJFG]\ ZC[X[P
6 Gujarati Condition
*P__ VF DF, 0=D DLS; %,Fg8GL ;F.8 p5Z H ;%,FI SZJFGM CMJFYL NZZMH H[8,M DF, J5ZFI
T[8,M DF, NZZMH 5]ZM 5F0JFGM ZC[X[P Ô[ DF, 5]ZM 5F0JFDF\ GCL\ VFJ[ TM VG[ VF DF, ;FDFG
GCL\ 5CM\RF0JFGF\ SFZ6[ Ô[ %,Fg8 A\W ZFBJFGM YX[ TM T[JF lNJ; NZdIFG ~FP !___P__
sV\S[ ~FP V[S CÔZ 5]ZFf J/TZ 5[8[ 5|tI[S lNJ;GF\ %,Fg8 p5Z J5ZFI[, A/T6 T[DH DH]ZL
5[8[ S5FT SZJFDF\ VFJX[P
(P__ SFDGM C]SD D[/JGFZ[ ;ZSFZzLGF\ JBTMJBTGF\ s5|JT"DFGf lGIDMG];FZ VYJF T[DF\
;DIF\TZ[ O[ZOFZ YFI T[ 5|DF6[GL HDLG VGFDT s;LSIMZL8L 0L5MhL8f T]ZT H EZJFGL ZC[X[P
)P__ SFDGF\ RF,] AL,DF\YL ;ZSFZzLGF\ lGIDMG];FZGL ZSD 0L5MhL8 5[8[ S5FT SZJFDF\ VFJX[4 H[
SZFZ 5]ZM YFI VG[ VFBZL R]SJ6]\ YFI tIFZAFNGF\ +6 DF; AFN H 5ZT D/JF 5F+ ZC[X[P
!_P__ Ô[ ;%,FIZ DF, ;FDFG 5]ZM 5F0JFDF\ lJ,\A SZX[ S[ DF, ;FDFG ;%,FI SZJFDF\ SM.56
ÔTFGF\ JF\WFVM ,[X[ TM T[ SZFZBTGL Ô[UJF. VG];FZ N\0 TYF J/TZ J;], ,[JFG[ 5F+ YX[4
VG[ T[ NZdIFG Ô[ SM. VF;FDL DF, 5]ZM YIF 5KL T{IFZ YX[ TM D\H]Z YI[, EFJ[ T[VM 5F;[YL
DF, ;FDFG D[/JJFGL jIJ:YF SZJFDF\ VFJX[ VG[ VFGF DF8[ SM. JF\WF S[ TSZFZ :JLSFZJFDF\
!!P__ Ô[ 9[S[NFZzL SFD X~ SZL 5]~ SZJFDF\ lGQO/ HX[ TM VG[ T[VMG[ ,FU] 5F0JFDF\ VFJGFZ N\0GL
ZSD Ô[ V\NFHLT lS\DTGF !_@ sNX 8SFf YL JWL HX[ TM T[VMGL BFTF 5F;[GL 0L5MhL8 H%T
SZL SZFZ ZN SZJFDF\ VFJX[ VG[ SZFZ E\U V\U[ lX1FFtDS SFI"JFCL SZJFDF\ VFJX[P
!ZP__ Ô[ 9[Z[NFZzL VWJrR[ SFD KM0L RF<IF HX[ TM T[DH NX s!_f lNJ;GL GM8L; VF%IF AFN T[D6[
EZ[, 0L5MhL8 TYF SF5[, 0L5MhL8 H%T SZL SZFZ ZN SZJFDF\ VFJX[ VG[ T[VM ;FD[ SZFZ
E\U V\U[ lX1FFtDS SFI"JFCL SZJFDF\ VFJX[P
!#P__ VF ;FY[ KF5[, SZFZGFDF TYF p5ZMST NZ[S XZTM K[J8GL U6FX[ VG[ T[G]\ 5F,G SZJFGL
HJFANFZL H[ T[ 9[S[NFZzLGL ZC[X[P
6 Gujarati Condition
!$P__ VF EFJM V[S JQF" ;]WLGF\ ;DI DF8[4 DIF"lNT ZC[X[ T[DH VF ;FY[GF\ 8[g0ZDF\ NXF"JJFDF\ VFJ[,
DF, ;FDFGGL H~ZLIFTGF\ HyYFDF\ JWFZM VYJF 38F0M YX[P TM T[ 9[S[NFZzLG[ A\WGSTF" ZC[XP[
!5P__ XL0I]V, D]HAGM DF, ;FDFG lGIT :Y/[ 5CM\RF0JFGM ;DI ;JFZGF\ *o__ S,FSYL ;F\HGF\
&o__ S,FS ;]WLGM ZC[X[P
!&P__ .HFZNFZzLV[ O[S; G\AZ sVMOL;GMf TYF ;F.8 5ZGF 5|lTGLWLGM DMAF., OMG ZFBL T[GF
G\AZ VF5JFGF ZC[X[P
!*P__ .HFZNFZzLV[ %,Fg8 ;F.8 p5Z VF5JFDF\ VFJTL ;]RGF 5|DF6[ lGIT ;F.hGF :8[S SZJFGF
ZC[X[P H[ SFDULZL 5}6” SIF” AFN R]SJ6]\ SZJFDF\ VFJX[P
!(P__ V:JLSFZ SZJFDF\ VFJ[, DF,G[ TFSLN[ N]Z SZJFGM ZC[X[P T[D SZJFDF\ .HFZNFZzL lGQO/ HX[
TM V:JLSFZ SZJFDF\ VFJ[, HyYF G]\ R]SJ6]\ SZJFDF\ VFJX[ GCLP
!)P__ ;NZ 8[g0ZDF\ H6FJ[, ;%,FIGM V\NFHLT HyYM Z:TFGF ;ZSFZL %,Fg8YL SZJFDF\
VFJGFZ BFTFSLI SFDM DF8[H NXF"J[, K[P HM JQF" NZdIFG GJLG Z:TFVMGF J3] SFDM
D\H]Z YFI TM4SZFZGF V[S JQF"GF ;DIUF/FDF\ V\NFHLT HyYF p5ZF\T bFFTFGL
HZ]ZLIFT D]HA J3FZFGM DF, ;FDFG 8[g0ZGF D\H]Z YI[, EFJ[ H VF5JFGM ZC[X[P
Z_P__ .ÔZNFZzLV[ %<FFg8 ;F.8 5Z GF\B[<FF JHGSF\8FDF H[ JHG R[S Y. XS[ T[8<FL H S]<F
JHGGL UF0L DMS<FJFG]\ ZC[X[P
p5Z NXF"JJFDF\ VFJ[, NZ[S XZTM TYF SFDGF\ :Y/GL D],FSFT ~A~ VDMV[ ,LW[, K[P VG[ VF
8[g0ZDF\ EZJFDF\ VFJ[, EFJM VDMV[ ;DHL lJRFZLG[ EZ[, K[ VG[ VF EFJM Ô[ VDFZF EFJ D\HZ
SZFZGL D]NT ;]WL V[8,[ S[4 V[S JQF" ;]WL VDMG[ A\WGSTF" ZC[X[P T[ ;DHLG[ H VDMV[ VF EFJM EZ[,F K[P T[GL
VFYL VDM BF+L ~5[ VF GLR[ ;CL SZL VF5[, K[P
PPPPPPPPPPPPPPPPPPPPPPPPPPPPPP
sEFJ EZGFZ VF;FDLGL ;CLf SFI"5F,S .HG[Z4
DFU" VG[ DSFG lJEFU4
6 Gujarati Condition
DFU" VG[ DSFG lJEFU4
5lZ5+ ÊDF\S o V[;V[;VFZq!_)ZqVF.ALqZZ)q;P
!$qZ ;ZNFZ EJG4P
;lRJF,I4 UF\WLGUZP
TFZLBo Z$v!_v!))$
ZFHIGF\ RF,TF Z:TFGF\ q 5[JZGF SFDM DF8[ U]6JTF\ lGIDGGF\ D[gI]V,DF\ DF,;FDFGGL U]6JTF\ DF8[
SIF DF,;FDFGGF\ S[8,F 5lZ1F6M SZJF S[ lGIT SZ[, K[4 T[GF\ V\G];\WFG[ ;ZSFZzLG[ D/[, ;]RGMG[ VFWFZ[
VFJF 5lZ1F6MGL 5|J"TDFG ;\bIFDF O[ZOFZ q ;]WFZM GÞL SZ[, K[4 T[YL CJ[ 5KL VFJF 5lZ1F6MGL ;\bIF VF
;FY[ ;FD[, 5lZ1F6MDF\ NXF"jIF 5|DF6[ ZCX[ VG[ VF ;]RGFVMGM VD, R]:T56[ SZJFDF\ VFJ[ T[ HMJF NZ[S
;\A\WSTF"G[ VFYL HF6 SZJFDF VFJ[ K[P VlW1FS .HG[ZzLVM VF ;]RGFVMG[ TF\l+S ;J[" VlWSFZLzLVM q
SD"RFZLzLVMGF\ wIFG 5Z ,FJ[ T[JL lJG\TL K[P
lA0F6o 5lZlXQ8P
BF; OZH 5ZGF\ VlWSFZL4
DFU" VG[ DSFG lJEFU4
PPPPPPPPPPPPPPPPPPPPPPPPPPPPPP
sEFJ EZGFZ VF;FDLGL ;CLf SFI"5F,S .HG[Z4
DFU" VG[ DSFG lJEFU4
6 Gujarati Condition
5lZ5+ S|DF\S ov V[;V[;VFZ v !_)Z q VF.AL q !Z) q !_ q ;P
TFZLB ov Z$v!_v!))$ VgJI[G]\ 5lZlXQ8
VG]\P 5lZ1F6GL lJUT 5lZ1F6MG]\ CF,G]\ WMZ6 5lZ1F6MGF\ ;]WFZ[, WMZ6
! D[8, U|[J, DM:8 ;[SXGvV )__ VF.V[;vZ$#_v(& 5|DF6[
Z__ 3PDLP !v5lZ1F6 3PDLP 5lZ1F6GL
!P U|[0[XG !__ 3PDLP !
ZP O,[SLG[X !__ YL 5__ #
5P S|XL\U 8[:8 VMKFDF\ VMKM V[S 8[:8
Z U|L8 S5RL 5_ YL !__ 3PDLP q 3PDLP 5lZ1F6GL
!P U|[0[XG !__ 3PDLP !
ZP O,[SLG[X !__ YL 5__ #
&P :8=L5L\U 8[:8 VMKFDF\ VMKF V[S V[S 8[:8
*P U[|0[XG Z 5lZ1F6 5lZ1F6 SM. ;]WFZM GCLP
D[8%,FG !vlNJ; q %,Fg8 ! lNJ; q %,Fg8
(P AF.g0ZvZ 5Lz1F6 5lZ1F6 SM. ;]WFZM GCLP
Sg8[g8 !vlNJ; q %,Fg8 8[:8 ! lNJ; q %,Fg8
5lZ1F6GL lJUT 5lZ1F6MG]\ RF,T]\ WMZ6 5lZ1F6MGF\ ;]WFZ[, WMZ6
)P 0FDZGL U]6JTFG]\ H~ZLIFT 5|DF6[ 8[g0ZGL ;\bIF 5lZ1F6GL
As per Correction Z YL !5 !
Slip as per Govt.
6 Gujarati Condition
!_P DF8LGL lO<00=FI 0[g;L8L GSSL SZ[, WMZ6;Z
:Y/5Z 1F[l+I SD"RFZLV[ ,[JFGM ZC[X[P
BF; OZH 5ZGF\ VlWSFZL4
DFU" VG[ DSFG lJEFU4
PPPPPPPPPPPPPPPPPPP SFI"5F,S .HG[Z
sSMg8=FS8ZGL ;CLf DFU" VG[ DSFG lJEFU
6 Gujarati Condition
DXLG S|x0 :8MG V[U|U[8GF O,[SLG[X
VG[ .,MgU[XG .g0[1FGF ;\I]ST WMZ6M
DFU¶ VG[ DSFG lJEFU
5lZ5+ S|DF\S v V[;VMVFZv!_Z__& q !_$ q ;P!
;lRJF,I4 UF\WLGUZ
cDXLG S|x0 :8MG V[U|LU[8c V[ AF\WSFDDF\ J5ZFT]\ D]bI D8LZLI<; K[P VF cD8LZLI<;c DF8[GF U]6J¿FGF lJlJW
WMZ6M 5{SLGM V[S cO,[SLG[X VG[ .,MgU[XG .g0[1F s;\I]STfc K[P H[ DLGL:8=L VMO ZM0 8=Fg;5M8" VG[ CF.J[h
sMORT&Hf äFZF 5|SFXLT :5[XLOLS[XG OMZ ZM0 V[g0 A|LH JS"GL RMYL VFJ'lTDF\ NXF"jIF VG];FZ #_@ YL
JW] G CMJM HM.V[P HIFZ[ VUFp DLGL:8=L VMO ;ZO[.; 8=Fg;5M8"GL ALHL VFJ'lTDF\ OST O,[SLG[X .g0[1FG]\
WMZ6 JW]DF\ JW] #5@ ;]WLG]\ CT]\P VFD ;\XMWGM q VG]EJ T[DH VnTG DXLGZLGL p5,aWLGM jIF5 q ;Z/TF
T[DH VFlY"S 5F;FVMG[ wIFG[ ,.G[ U]6J¿FGF WMZ6MDF\ 56 GJF ;]WFZF q JWFZF SZJFDF\ VFJ[ K[P VUFpGF
O,[SLG[X .g0[1FGF WMZ6MDF\ CJ[ .,MgU[XG .g0[1F 56 HM0L ;\I]ST WMZ6 NFB, SZJFDF\ VFJ[, K[P 5Z\T] CF,
U]HZFT ZFHIDF\ VFJ[, S|XZ I]lG8M 5{SLGF DM8F EFUGF I]lG8M 5Z\5ZFUT 5wWlTYL SFI"ZT K[P T[DF\YL GJF
;\I]ST WMZ6M 5lZ5}6" SZ[ T[JM pt5FlT DF, D/L XSTM GYLP H[ V[S jIJFZLS D]xS[,L K[P 5Z\5ZFUT 5wWlTGF
S|XZDF\ VF 5|SFZGL D]xS[,LVM VFJ[ K[P T[ AFATM p<,[B 8[SGLS, HG",DF\ 5|l;wW YTF 8[SGLS, 5[5;"DF\
YI[, K[P VFYL ;\I]ST WMZ6M D[/JJF CF,GF S|XZ I]lG8MDF\ ;FZF V[JF 5|DF6DF\ ;]WFZF JWFZF SZJF VFJxIS
AG[ T[D K[P H[DF\ JWFZFG]\ GF6F\SLI ZMSF6 56 SZJ]\ 50[ T[DH ;DI 56 jIlTT YFI VFYL O,[SLG[X T[DH
.,MgU[XG .g0[1FGF ;\I]ST WMZ6MGM VD, SZJF s.HFZNFZMG[f 5]ZTM ;DI VF5JM 56 H~ZL K[P T[ wIFG[
GLR[ D]HAGL ;]RGFVM VF5JFDF\ VFJ[ K[P
DLGL:8=L VMO ZM0 8=Fg;5M8" V[g0 CF.J[ äFZF 5|SFXLT :5[XLOLS[XG OMZ ZM0 V[g0 A|LH JS"GL ;G[ Z__!
GL RMYL VFJ'lT VG];FZ DXLG S|x0 :8MG V[U|LU[8 DF8[ O,[SLG[X T[DH .,MgU[XG ;\I]ST .g0[1FGL DC¿D #_@
GL DIF"NFG]\ WMZ6 V5GFJJFG]\ GSSL SZJFDF\ VFJ[, K[P
DFU" VG[ DSFG lJEFU C:TS RF,TF SFDMDF\ 5|JT"DFG :5[XLOLS[XG 5|DF6[ O,[SLG[X VG[ .,MgU[XGGF
;\I]ST .g0[1FGL DC¿D DIF"NF #_@ ZFBJFDF\ VFJ[ K[P
6 Gujarati Condition
U]HZFT ZFHIDF\ DM8F EFUGF S|XL\U I]lG8M BFGUL DF,LSLGF K[ VG[ T[DF\ H~ZL IF\l+S O[ZOFZM
SZJFDF\ VFJ[ TM ;\I]ST .g0[1FGF WFZF WMZ6M H/JF. ZC[ T[JM DF, D/L XS[P
U]HZFT ZFHIDF\ RF,TF BFGUL S|XL\U DXLGMDF\ H~ZL IF\l+S ;]WFZF JWFZF TFP #_v_)v_* ;]WLDF\
SZJFDF\ VFJ[ TM H TFP _!v!_v_* 5KLYL DFU" VG[ DSFG lJEFUGF Z:TFVMDF\ J5ZFTF V[U|LU[8GL U]6J¿F
WFZF WMZ6 D]HAGL D/L ZC[P VFYL GLR[ D]HAGL ;]RGFVM VF5JFDF\ VFJ[ K[P
sVf DFU" VG[ DSFG lJEFUDF\ RF,TF SFDMDF\ .HFZNFZMV[ H[ T[ S|XL\U I]lG8MDF\ H~ZL IF\l+S ;]WFZFvJWFZF
Y. UI[, K[ VG[ WFZF WMZ6 D]HAGL U]6J¿FGM V[U|LU[8 D/L ZC[ K[ T[J]\ 5|DF65+ VlW1FS .HG[ZzL
sIF\l+Sf VDNFJFN DFPDPJT]"/4 VDNFJFNG]\ CMI T[GL 5F;[YL H DF,;FDFG BZLN SZJFGM ZC[X[P VF 5|DFl6T
YI[, S|XL\U I]lG8 l;JFIGF SM.56 S|XZ 5F;[YL DF,;FDFG ;%,FI G YFI T[GL SF/HL ,[JFGL ZC[X[P VP.PzL
sIF\l+Sf äFZF ;8L"OF.0 G YI[, S|XL\U I]lG8 5F;[YL VFJ[, WFZF WMZ6 JUZGM DF, ;FDFG VFp8 ZF.8
ZLH[S8 SZJFDF\ VFJX[P
sAf DFU" VG[ DSFG lJEFUGF V[;PVMPVFZP DF\ TYF V\NFHMDF\ V[U|LU[8GF EFJDF\ H~ZL ;]WFZF JWFZF
SZLG[ TFP _!v!_v_* YL VD,DF\ ,FJJFGF Z[C[X[P
sSf NZ[S lJEFULI SR[ZLVMV[ T[VMGF TFAFDF\ H[ H[ .HFZNFZMGL GM\W6L YI[, K[ T[VMG[ ;NZC] ;]RGFGM
VD, SZJF DF8[ ,[BLT HF6 SZJFGL ZC[X[ TYF BFGUL S|XL\U I]lG8MG[ 56 VFGL ,[BLT HF6 SZJFGL ZC[XP[
;NZC] ;]RGFGF VD, DF8[ BFGUL S|XZ I]lG8M T[DH .HFZNFZM ;FY[ NZ[S lJEFULI SR[ZLV[ V[S ;\I]ST A[9S
SZLG[ ;DH VF5JFGL ZC[[X[P H[YL TFP _!v!_v_* 5KL DFU" VG[ DSFG lJEFU C:TS RF,TF SM.56 SFDMDF\
WFZF WMZ6 D]HAGL U]6J¿F l;JFIGM DF,;FDFG JF5ZJFDF\ G VFJ[ T[GL TS[NFZL ZFBJFGL ZC[X[P
p5ZMST ;]RGFVMGM VD, R]:T56[ SZJFGM ZC[X[P
DFU¶ VG[ DSFG lJEFU
DFU" VG[ DSFG lJEFU4
6 Gujarati Condition
DXLG S|x0 :8MG V[U|U[8GF O,[SLG[X
VG[ .,MgU[XG .g0[1FGF ;\I]ST WMZ6M
DFU¶ VG[ DSFG lJEFU
5lZ5+ S|DF\S v V[;VMVFZv!_Z__& q !_$ q ;P!
;lRJF,I4 UF\WLGUZ
;\NE"o ;ZBF S|DF\SGF 5lZ5+ TFPZ5v!vZ__*
U]HZFT ;ZSFZzLGF DFU" VG[ DSFG lJEFU äFZF ;\NEL"T 5lZ5+ S|DF\SP V[;PVMPVFZP !_Z__& q
!_$ q ;P ! TFPZ5v!vZ__* YL AF\WSFDDF\ J5ZFTF\ DXLG S|x0 :8MG V[U|LU[8 DF8[ O,[SLG[X T[DH
.,MgU[XG ;\I]ST .g0[1FGL DCTD #_@ DIF"NFG]\ WMZ6 V5GFJJFG]\ GSSL YI[, CT]\P H[ DF8[ U]HZFT ZFHIDF\
RF,TF BFGUL S|XL\U I]GL8MDF\ H~ZL TF\l+S ;]WFZF JWFZF TFP#_v)vZ__* ;]WLDF\ SZJF VG[
TFP!v!_vZ__* 5KL YL DFU" VG[ DSFG lJEFUGF Z:TFVMGF SFDDF\ J5ZFT V[U|LU[8 WFZF WMZ6 D]HAGL
U]6JtTF JF/M JF5ZJFDF\ VFJ[ T[D H6FJ[, CT]\P
S|XZ I]GL8MDF\ H~ZL ;]WFZF JWFZF ;]RJ[, ;DIUF/FDF\ Y. XS[, G CMJFYL JFZ\JFZ ;DI DIF"NF
JWFZJF DF8[GL ZH]VFTM YI[, CTLP
p5ZMST AFAT[ ;ZSFZzL äFZF 5]bT lJRFZ6FG[ V\T[ S|XL\U I]GL8MDF\ H~ZL ;]WFZF JWFZF SZJF DF8[GL V\lTD
TFP#_v)vZ__* G[ AN,[ TFP#!v!ZvZ__( SZJFDF\ VFJ[, K[P
p5ZMST ;]RGFVMGM VD, R]:T56[ SZJFGM ZC[X[P
DFU¶ VG[ DSFG lJEFU
6 Gujarati Condition
Item : Supply of black trap machine crushed stone aggregates of Stone Dust of approved quality
from quarry to Government hot mix plant site at Bavla, Dist.: Ahmedabad.
1. The field of M.C. metal shall be of approved quarry as shown on the quarry chart as well as approved
by the Executive Engineer prior to collection.
2. The M.C. metal shall be hard, tough, sound, durable, black trap field metal of close texture free from
decay and weathering. Each piece of the stone shall be angular and roughly cubical in shape and
round elongated or flaky material shall be rejected. No round or oblong pebbles or angular chips
larger or smaller than specified size shall be allowed.
3. The M.C. metal shall be as nearly uniform in size as possible and shall conform to following minimum
requirements of passing through the rings :
Sieve Size % by weight passing through.
4. All unsound, weathered or disintegrated stone obtained from the upper surface layer of the quarry or
other layer of boulders shall be rejected. The physical requirement for standard size metal shall
conform to the test results has below
The aggregates shall consist of black trap machine crushed stone only. The aggregates shall be
completely black in colour. It shall remain visibly black on immersion in water. They shall be clean,
strong, durable of fairly cubical shape and free from disintegrated pieces organic or other deleterious
matters and adherent coating. The aggregates shall satisfy physical requirement set forth as under.
Property Test Specification
Cleanliness (dust) Grain size analysis 1 Max 5 % passing
Particle shape Flakiness & Elongation Index (Combined) 2 Max 30 %
Strength* Los Angles Abrasion Value
Aggregate Impact Value4 Max 27 %
Durability Soundness5
Sodium Sulphate Max 12 %
Magnesium Sulphate Max 18 %
Water Absorption Water absorption6 Max 2 %
Stripping Coating & Stripping of Bitumen Aggregate Minimum retained
Mixtures7 coating 95 %
Water Sensitively** Retained Tensile Strength8 Min 80 %
Notes : 1 IS:2386 Part 1 5. IS:2386 Part
2 IS:2386 Part 1 6. IS:2386 Part
(the elongation test to be only on non-flaxy aggregates in the sample)
4. IS:2386 Part 4* 8. AASHTO T283**
* Aggregate may satisfy requirements of either of these two tests.
** The water sensitivity test is only required if the minimum retained coating in the stripping test is less
The size of the aggregate shall be 6mm to 10mm size. The samples of aggregates collected from
approved quarries shall be got tested at Government recognized laboratory as directed to the contractor.
The results shall confirm to the standard requirement laid down in Para I. Collection of aggregates as per
approved samples shall be allowed by the Engineer-in-charge.
Aggregates shall be stacked at plant site as directed by the Engineer-in-charge. Contractor shall
have to make his own arrangement for the same. Regular stacks shall be done on fairly level ground.
Stacking shall be done in a manner as directed by the Engineer-in-charge.
Controlled on quality of material shall be exercised by the Engineer-in-charge by carrying out the
following tests at the frequencies shown against each.
Type of construction Test Frequency @ which test
shall be carried out
Aggregate ,Stone Dust. (i) Aggregate impact value 1 to 100 Cmt. – 1 Test
100 to 500 Cmt. – 3 Test
500 to 1500 Cmt. – 5 Test.
1500 to 5000 Cmt. – 7 Test
(ii) Flakiness Index of 1 to 100 Cmt. – 1 Test
aggregate 100 to 500 Cmt. – 3 Test
500 to 1500 Cmt. – 5 Test.
1500 to 5000 Cmt. – 7 Test
(iii) Stripping value and 1 to 100 Cmt. – 1 Test
water absorption of 100 to 500 Cmt. – 3 Test
aggregates 500 to 1500 Cmt. – 5 Test.
1500 to 5000 Cmt. – 7 Test
(iv) Grading of aggregates 1 to 100 Cmt. – 1 Test
100 to 500 Cmt. – 3 Test
500 to 1500 Cmt. – 5 Test.
1500 to 5000 Cmt. – 7 Test
Weight of the material shall be done on the weighbridge installed at Government Hot Mix Plat at
Ramnagar. The contractor will have to accept the method and manner provided by the department for
cross checking maintaining and preparing the records properly.
The payment shall be maid on metric tonne basis. The contractor shall be responsible for
preserving the material through out the period of the contractor agreement in force. The rates included
the cost of material. conveyance to the plant site with all lead and lift and stacking including all labour,
taxes, royalties, excise and octroi duties, tolls, equipment and other incidental expenses.
1. The Contractor shall have to produce quarry pass with the materials and hand over to the
representative of the department for record.
2. The quantities shown in the schedule is an approximate quantity.
3. The aggregates shall be supplied in the quality as demanded by the Engineer-in-charge. The
contractor shall be fully responsible if plant remains idle due to less supply of materials and for
which penalty will be charge at Rs. 5000 per day.
4. If the contractor fails to supply the material at plant site as ordered than the same will be
purchased and collected by the department at the risk and cost of the contractor.
5. One percent quality control testing charge will recovered from the bill of the contractor for which
no refund will be made in any circumstances.
6. Any stack of the material which does not confirm to the prescribed test and quality shall be
rejected by the Engineer-in-charge or his representative and such materials shall be removed
from the site by the contractor at his own cost. Such rejected materials shall not be made
acceptable by any modifications. The decision of the Executive Engineer shall be the final and
fully binding to the contractor.
7. If required contractor shall have to provide labour, tools and plants for the purpose measurement
checking of the materials as demanded by the authority or inspecting officer at any time without
claiming extra cost.
8. Payment at full rate for B.T. aggregates shall not be made till the test result from the laboratory
are received and found acceptable.
9. On receiving the work order the agency will have to start the supply of materials as directed within
7 days, otherwise the tender will liable to reject.
10. Materials shall be supplied to plant site strictly in daytime fro, 5:00 A.M. to 11:59 P.M. only.
Agency will have to attach proof of the production / output per day along with the tender.
If supplier/firm is failed to supply whole materials during the time limit, the supplier/firm shall not be issued
blank tender for two years.
(Government of Gujarat Roads & Building Department letter No. TNC / 1096 / QIB / 17027 / S, Dated 5 th
Mode of Measurements and payment:
The grit supplied on site shall be measured on One M.T. basis of approved
quantity of the grit by the Engineer in charge. The rates of this item are inclusive of cost of
materials, loading, unloading, stacking the same as directed including cost of conveyance
from quarry site to plant site. The rate also includes cost of all labour, machineries and all
the taxes and levies as may be admissible from time to time by the State or Central
Executive Engineer
R & B Division,
Name of work: Supply of black trap machine crushed stone aggregates of Stone Dust of approved quality from quarry to
Government hot mix plant site at Bavla, Dist.: Ahmedabad. (2nd attempt)
MATERIAL TEST SCHEDULE
Sr. No. Description of Item Total quantity Material to be Name of laboratory test Frequency of tests Remarks
as per tender tested
1 Supply of Stone 14708.00 Crushed stone a) Aggregate Impact value upto 100 cum
Dust aggregate as
required. As b) Flakiness Index 101 to 500 cum.
per MORTH c) Water Absorption 501 to 1500 cum.
gradation d) Gradation 1501 to 5000 cum.
e) Stripping value 5001 & above one
1) Tests as may be directed by Engineer-in-charge irrespective of provisions shown above shall have to be got conducted.
2) The testing charges to be paid to GERI shall be born by the Govt. and 1% of Estimated amount will be recovered from the bills
of contractor towards testing charges.
Expenditure on account of test should be borne by the department but materials required for testing shall be supplied by
the contractor to the department as and when the materials utilised for the contructional operations. The 1.00% of tender
amount shall be deducted from the bills of the contractor for testing charges as per Govt. Reso. Dated 20.12.91 & modified
vide R&B Deptt., circular No. SSR/1092/1-B/120/10 Dtd. 16.10.1995 (Applicable to R&B Works only)
Deputy Executive Engineer Executive Engineer
R & B Sub Division No. 2 R & B Division
Ahmedabad Ahmedabad
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
DTP UPLOAD_5 SCH-B STONE DUST.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .