Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAccepted-AOC | ₹8.2 L | L1 | Accepted-AOC L1 Accepted |
| 2 | L2₹8.6 LRejected-AOC | ₹8.6 L | L2 | Rejected-AOC L2 Rejected |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Due to Insufficient Documents |
| Sl No | Description | Qty | Unit | HUBERT ENVIRO CARE SYSTEMS LTD L1 | Visiontek Consultancy Services Pvt. Ltd. L2 |
|---|---|---|---|---|---|
| 1.00 | Site Visit to the Project Area and Asses the Site Condition, Taking Required Photographs, Collection of details like Proposed Area, Type of Project, Category of the Project, Location details including Survey Nos, Boundary Coordinates, Proponent Details, Land use Details, Green Belt Details from Project Proponent, Preparation of Form 1, Which Includes Basic Details of Project, Activity of Construction , Operation or Decommissioning of Project, Environmental Sensitivity Details | 1 | Job | 24,000 ₹24,000 | 25,500 ₹25,500 |
| 2.00 | Preparation of Form 1 A , Which Includes the details of Land Environment, Water Environment, Vegetation, Fauna, Air Environment, Aesthetics, Socio Economic Aspects, Building Materials, Energy Conservation Details, Preparation of Environmental Management Plan for implementation of environmental control & protective measures as well as monitoring of such implementation, Preparation of Mitigation Measures details which includes Source of Pollution and Control Measure for particular Activity for Air Pollution and Noise Pollution at Construction Stage and Operation Stage. | 1 | Job | 1,24,000 ₹1.2 L | 1,27,000 ₹1.3 L |
| 3.00 | Preparation of Water Balance details and Diagram, Which includes Water Requirement for Construction Phase and Operation Phase, Preparation of District Secondary Profile, Primary Profile of the Project Area, Preparation of Solid Waste Management Details of the Project including Municipal Solid Waste, Construction Waste, Demolition Waste, Preparation and Recommend the Plant Species details for Green belt Development of the Project Area, To Propose the Traffic Management Plant Entry and Exit to the Project site, Preparation of Disaster Management Plan, Emergency Action Plan including the details of Preventive Actions, Warnings Procedures ,Control Measures to Minimize the of Unexpected Event. | 1 | Job | 1,24,000 ₹1.2 L | 1,27,000 ₹1.3 L |
| 4.00 | Preparation of Environmental Sensitive Area Maps Including 1km , 5km, 10 km Buffer Boundary along with Nearest Water body details, Surrounding features of the proposed site, Site indicating levels & Contours to Appropriate Scales, Preparation of Site Connectivity Map, Marking Coordinates of Greenbelt and OSR Area using Google earth, Preparation of Topo Map, Wild Life Sanctuary Topo Map, Providing School, College, Hospital Details, Government Buildings, Religious Places details, Industries Details, Land Use Land Classification Details which includes Highway details, Forest Details, Elevation Details, Village Details, Water bodies Details, mangroves Details, Canal, River Details. | 1 | Job | 1,24,000 ₹1.2 L | 1,27,000 ₹1.3 L |
| 5.00 | Preparation of Conceptual Plan of the Project which Includes Area Summary( Site Area, Built up Area, Green Belt and OSR Area) of the project, Power Requirement, Power Back up, Source of Power, Water Requirement , Water Source, Connectivity for the Project, Basic Infrastructure Details, Preparation of Sewage Treatment Plant Details, Rainwater Harvesting & Storm Water Management Details | 1 | Job | 1,00,000 ₹1 L | 1,10,000 ₹1.1 L |
| 6.00 | Preparation of EC Application in Parivesh Portal, which Includes filling of CAF (Common Application Form ), Part –A(Basic Details) , PART –B(Activity Details), Submission of EC Application in Parivesh Portal along with Form 1, Form 1A, Conceptual Plan and Required Annexure, Submission of Hard copies of EC Application along with Form 1, Form 1A, Conceptual Plan and Required Annexure to SEAC and obtaining Acknowledgment from SEAC, Circulation of Hard Copies to All the SEAC Members through Courier and submission of Courier slips along with Covering letter to SEAC and Obtaining Acknowledgment for the same. | 1 | Job | 75,000 ₹75,000 | 80,000 ₹80,000 |
| 7.00 | Preparation of Project Presentation and Submission of same in Parivesh Portal after getting Authorized signatory from the Project Proponent, Presentation about the proposed by EIA Coordinator to the SEAC committee Members, Obtaining Minutes of Meeting from
SEAC through Portal. | 1 | Job | 75,000 ₹75,000 | 80,000 ₹80,000 |
| 8.00 | Addressing Queries raised by the TN-SEIAA / SEAC and uploading the updated documents to the online portal, Coordination and follow up with TN – State Environmental Impact Assessment Authority (SEIAA) and Obtaining Environmental Clearance | 1 | Job | 50,000 ₹50,000 | 55,000 ₹55,000 |
| 290.00 | GST at 18% | 1 | Nos | 1,25,280 ₹1.3 L | 1,31,670 ₹1.3 L |
Tender Value
Refer Docs
EMD Value
₹8,260
Closing Date
28 Nov 2025, 3:00 pmClosed
Executive Engineer,PWD.,
Office of the Executive Engineer,PWD., Buildings Construction and Maintenance North Presidency Division, Chepauk, Chennai - 5
Providing Consultancy services for obtaining Environmental clearance from SEIAA for Proposed Construction of Multi-storied combined court building for accommodating 160 Court Halls in Chennai 3.
2025_PWD_625530_1
TNPWD/02-01/DB/2025-2026
Open Tender
Consultancy
30 days
Chennai
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹8,260
26 Feb 2026
21 Nov 2025
28 Nov 2025
21 Nov 2025
28 Nov 2025
21 Nov 2025
Amount
Site Visit to the Project Area and Asses the Site Condition, Taking Required Photographs, Collection of details like Proposed Area, Type of Project, Category of the Project, Location details including Survey Nos, Boundary Coordinates, Proponent Details, Land use Details, Green Belt Details from Project Proponent, Preparation of Form 1, Which Includes Basic Details of Project, Activity of Construction , Operation or Decommissioning of Project, Environmental Sensitivity Details
Preparation of Form 1 A , Which Includes the details of Land Environment, Water Environment, Vegetation, Fauna, Air Environment, Aesthetics, Socio Economic Aspects, Building Materials, Energy Conservation Details, Preparation of Environmental Management Plan for implementation of environmental control & protective measures as well as monitoring of such implementation, Preparation of Mitigation Measures details which includes Source of Pollution and Control Measure for particular Activity for Air Pollution and Noise Pollution at Construction Stage and Operation Stage.
Preparation of Water Balance details and Diagram, Which includes Water Requirement for Construction Phase and Operation Phase, Preparation of District Secondary Profile, Primary Profile of the Project Area, Preparation of Solid Waste Management Details of the Project including Municipal Solid Waste, Construction Waste, Demolition Waste, Preparation and Recommend the Plant Species details for Green belt Development of the Project Area, To Propose the Traffic Management Plant Entry and Exit to the Project site, Preparation of Disaster Management Plan, Emergency Action Plan including the details of Preventive Actions, Warnings Procedures ,Control Measures to Minimize the of Unexpected Event.
Preparation of Environmental Sensitive Area Maps Including 1km , 5km, 10 km Buffer Boundary along with Nearest Water body details, Surrounding features of the proposed site, Site indicating levels & Contours to Appropriate Scales, Preparation of Site Connectivity Map, Marking Coordinates of Greenbelt and OSR Area using Google earth, Preparation of Topo Map, Wild Life Sanctuary Topo Map, Providing School, College, Hospital Details, Government Buildings, Religious Places details, Industries Details, Land Use Land Classification Details which includes Highway details, Forest Details, Elevation Details, Village Details, Water bodies Details, mangroves Details, Canal, River Details.
Preparation of Conceptual Plan of the Project which Includes Area Summary( Site Area, Built up Area, Green Belt and OSR Area) of the project, Power Requirement, Power Back up, Source of Power, Water Requirement , Water Source, Connectivity for the Project, Basic Infrastructure Details, Preparation of Sewage Treatment Plant Details, Rainwater Harvesting & Storm Water Management Details
Preparation of EC Application in Parivesh Portal, which Includes filling of CAF (Common Application Form ), Part –A(Basic Details) , PART –B(Activity Details), Submission of EC Application in Parivesh Portal along with Form 1, Form 1A, Conceptual Plan and Required Annexure, Submission of Hard copies of EC Application along with Form 1, Form 1A, Conceptual Plan and Required Annexure to SEAC and obtaining Acknowledgment from SEAC, Circulation of Hard Copies to All the SEAC Members through Courier and submission of Courier slips along with Covering letter to SEAC and Obtaining Acknowledgment for the same.
Preparation of Project Presentation and Submission of same in Parivesh Portal after getting Authorized signatory from the Project Proponent, Presentation about the proposed by EIA Coordinator to the SEAC committee Members, Obtaining Minutes of Meeting from SEAC through Portal.
Addressing Queries raised by the TN-SEIAA / SEAC and uploading the updated documents to the online portal, Coordination and follow up with TN – State Environmental Impact Assessment Authority (SEIAA) and Obtaining Environmental Clearance
GST at 18%
Visiontek Consultancy Services Pvt. Ltd. (BID ID -1523169)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_748023.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
Tenderconditions1.pdf
Tender Documents • 0.22 MB
BOQ_748023.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid