| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC S 524 NEELKANTH HOUSE 302 3RD FLOOR SCHOOL BLOCK SHAKARPUR DELHI DELHI 110092 | EAST DELHI | DELHI | 110092 | ₹1.9 Cr | L1 | Accepted-AOC AOC for Merrut GA and Dewas GA as per LOA date 29.07.2024 |
| 2 | L1₹3.4 CrAccepted-AOC 401 APOLLO ARCADE R C TECHNICAL INSTITUTE ROAD GHATLODIYA AHMEDABAD GUJARAT 380061 | AHMADABAD | GUJARAT | 380061 | ₹3.4 Cr | L1 | Accepted-AOC AOC For Sonipat GA, AGRA GA and Firozabad GA as per LOA Date 30.07.2024 |
| 3 | L2₹1.2 CrRejected-Finance | ₹1.2 Cr | L2 | Rejected-Finance Not Accepted |
| 4 | L3₹2.8 CrRejected-Finance GROUND FLOOR 72 BUSINESS PARK CROSS ROAD C MAROL INDUSTRIAL AREA MIDC ANDHERI EAST MUMBAI MUMBAI MAHARASHTRA 400093 | MUMBAI SUBURBAN | MAHARASHTRA | 400093 | ₹2.8 Cr | L3 | Rejected-Finance Not Accepted |
| Sl No | Description | Qty | Unit | Bureau Veritas (India) Pvt. Ltd. L2 | SOPAN O AND M CO PVT KTD No Rank | SARK EPC Projects Pvt.Ltd. L1 | SANMARG Projects Pvt. Ltd. No Rank |
|---|---|---|---|---|---|---|---|
| 1.00INTEGRITY ASSESSMENT FOR STELL PIPELINE AT SONIPAT GA | |||||||
| 2.00 | ECDA Pre Assessment
ECDA Pre-Assessment as per NACE SP0502-2010 along-with on-field Pre-Survey
This line item includes but not limited to the Following activities to be executed by Contractor/Bidder:
. SME site visit
. Cathodic Protection (CP) Audit of existing system
. Assessing the ROW for feasibility of performing surveys as per subsequent SOR Items
. Field exercise along with authentic results to prove requirement of drilling holes for soil contact
. Provide final report before proceeding with second step
This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents. | 49.27 | KM | 24,855.42 ₹14,45,059.17 | 32,411 ₹18,84,330.16 | 20,000 ₹11,62,772 Lowest | - |
| 3.00 | ECDA Indirect Inspection
ECDA Indirect Inspection - (but not limited to) of CIPS, DCVG, ACVG, ACCA, continuous DoC, DGPS and soil resistivity surveys.
Please refer Scope of Work and Special Conditions of Contract for Details.
This line item includes but not limited to the Following activities to be executed by Contractor/Bidder:
a. Surveys to be performed simultaneously (Preferably all surveys in a single pass) with DGPS to provide:
1. List of Geotechnical indications (shallow DOC, earth movement, exposed pipe etc.)
2. List of Coating indications in the pipeline protective coating
3. List of Cathodic Protection indications (As per NACE SP0169 criteria)
4. Survey Data with excel files (CIPS, ACCA/CAT, DCVG/ACVG, DOC, DGPS Mapping)
5. All data collected will be aligned with sub-meter DGPS
6. List of possible Interference indications
b. Provide report
This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents. | 49.27 | KM | 62,206.54 ₹36,16,600.9 Lowest | 95,852 ₹55,72,701.09 | 1,00,000 ₹58,13,860 | - |
| 4.00 | Soil Test for presence of Sulphur Reducing Bacteria (SRB) ( Collection of soil sample upto the depth of the pipeline & its testing at Lab) | 5 | EA | 8,400 ₹49,560 Lowest | 18,900 ₹1,11,510 | 24,500 ₹1,44,550 | - |
| 5.00 | Drilling holes (upto the depth of pipeline) on concrete / paved road/Bituminous Road or any other kind of Road/area for survey purposes (Min 2 holes per Kilometer ) including Liasioning/permissions with/from all concerned authorities or persons for drilling holes
This line item includes but not limited to the Following activities to be executed by Contractor/Bidder:
Drilling holes will be required if identified during the Pre-Assessment step.
Liaisoning for obtaining permissions from Concerned Authorities or Personnel for drilling holes, will be in scope of Contractor/Bidder.
This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents. | 20 | EA | 1,01,250 ₹23,89,500 | 17,150 ₹4,04,740 | 850 ₹20,060 Lowest | - |
| 6.00 | Excavation for Direct Inspection
Excavation for Direct Inspection for ECDA including Liaisoning/permissions with/from all concerned authorities for excavation.
Liaisoning with whomsoever (personnel or Authority), to obtain permission for Excavation, will be in Scope of Contractor/Bidder.
Backfilling and Restoring ROW in original
Backfilling of Excavated portion of road/ground, will be in Scope of Contractor.
Reinstatement/Restoration of ROW of Pipeline in its Original Condition, will also be in Scope of Contractor.
Liaisoning for any permission associated with Backfilling or Restoration will be in Scope of Contractor.
This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents. [Assuming each dig site is L = 5m, W = 3 m, D = 3 m; Billing will be on actuals based on possible access] | 1,125 | M3 | 7,830 ₹1,03,94,325 | 2,079 ₹27,59,872.5 | 1,650 ₹21,90,375 Lowest | - |
| 7.00 | Surface Preparation for Inspection
Surface Preparation for Inspection including removal of old coating (if required).
Pipe Surface will be developed using emery paper, buffing or any other suitable material as per Standard Engineering Practice, before application of Recoating.
This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents. [Assuming One meter coating removal for each defect location on pipe; Billing will be on actuals based on possible access] | 13 | M2 | 84,000 ₹12,88,560 | 750 ₹11,505 Lowest | 850 ₹13,039 | - |
| 8.00 | Direct Examination Inspection | 25 | EA | 55,979.43 ₹16,51,393.14 | 15,000 ₹4,42,500 | 1,500 ₹44,250 Lowest | - |
| 9.00 | Recoating Material supply with Installation.
Refer Scope of Work, Special Conditions of Contract and other Tender Documents for Detail.
Supply and Installation/applying of New Coating Material, will be in Scope of Contractor. [Assuming,One meter length coating is re-coated + 50% overlap; Billing will be on actuals basis] | 20 | M2 | 2,90,250 ₹68,49,900 | 3,600 ₹84,960 Lowest | 5,500 ₹1,29,800 | - |
| 10.00 | Post assessment Final Report
Post Assessment Final Report will be submitted by Contractor. Please refer SCC, SOW and Other Tender Documents of this Contract | 1 | EA | 4,86,559.48 ₹5,74,140.19 | 9,64,500 ₹11,38,110 | 4,50,000 ₹5,31,000 Lowest | - |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
18 Mar 2024, 2:00 pmClosed
M.C.Joshi
Gail Gas Ltd Noida
HIRING OF SERVICES FOR INTEGRITY ASSESSMENT OF STEEL PIPELINE NETWORK AT SONIPAT, MEERUT, DEWAS, AGRA AND FIROZABAD GAs
2024_GAILG_184009_1
GAIL GAS/NOIDA/6138/MCJ/23-24/83
Open Tender
Miscellaneous Services
Item Rate
364 days
Noida
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.1 L
Yes
Through VC
25 Aug 2025
19 Feb 2024
19 Mar 2024
19 Feb 2024
18 Mar 2024
1 Mar 2024
29 Feb 2024
Amount
INTEGRITY ASSESSMENT FOR STELL PIPELINE AT SONIPAT GA
ECDA Pre Assessment ECDA Pre-Assessment as per NACE SP0502-2010 along-with on-field Pre-Survey This line item includes but not limited to the Following activities to be executed by Contractor/Bidder: . SME site visit . Cathodic Protection (CP) Audit of existing system . Assessing the ROW for feasibility of performing surveys as per subsequent SOR Items . Field exercise along with authentic results to prove requirement of drilling holes for soil contact . Provide final report before proceeding with second step This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents.
ECDA Indirect Inspection ECDA Indirect Inspection - (but not limited to) of CIPS, DCVG, ACVG, ACCA, continuous DoC, DGPS and soil resistivity surveys. Please refer Scope of Work and Special Conditions of Contract for Details. This line item includes but not limited to the Following activities to be executed by Contractor/Bidder: a. Surveys to be performed simultaneously (Preferably all surveys in a single pass) with DGPS to provide: 1. List of Geotechnical indications (shallow DOC, earth movement, exposed pipe etc.) 2. List of Coating indications in the pipeline protective coating 3. List of Cathodic Protection indications (As per NACE SP0169 criteria) 4. Survey Data with excel files (CIPS, ACCA/CAT, DCVG/ACVG, DOC, DGPS Mapping) 5. All data collected will be aligned with sub-meter DGPS 6. List of possible Interference indications b. Provide report This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents.
Soil Test for presence of Sulphur Reducing Bacteria (SRB) ( Collection of soil sample upto the depth of the pipeline & its testing at Lab)
Drilling holes (upto the depth of pipeline) on concrete / paved road/Bituminous Road or any other kind of Road/area for survey purposes (Min 2 holes per Kilometer ) including Liasioning/permissions with/from all concerned authorities or persons for drilling holes This line item includes but not limited to the Following activities to be executed by Contractor/Bidder: Drilling holes will be required if identified during the Pre-Assessment step. Liaisoning for obtaining permissions from Concerned Authorities or Personnel for drilling holes, will be in scope of Contractor/Bidder. This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents.
Excavation for Direct Inspection Excavation for Direct Inspection for ECDA including Liaisoning/permissions with/from all concerned authorities for excavation. Liaisoning with whomsoever (personnel or Authority), to obtain permission for Excavation, will be in Scope of Contractor/Bidder. Backfilling and Restoring ROW in original Backfilling of Excavated portion of road/ground, will be in Scope of Contractor. Reinstatement/Restoration of ROW of Pipeline in its Original Condition, will also be in Scope of Contractor. Liaisoning for any permission associated with Backfilling or Restoration will be in Scope of Contractor. This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents. [Assuming each dig site is L = 5m, W = 3 m, D = 3 m; Billing will be on actuals based on possible access]
Surface Preparation for Inspection Surface Preparation for Inspection including removal of old coating (if required). Pipe Surface will be developed using emery paper, buffing or any other suitable material as per Standard Engineering Practice, before application of Recoating. This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents. [Assuming One meter coating removal for each defect location on pipe; Billing will be on actuals based on possible access]
Direct Examination Inspection
Recoating Material supply with Installation. Refer Scope of Work, Special Conditions of Contract and other Tender Documents for Detail. Supply and Installation/applying of New Coating Material, will be in Scope of Contractor. [Assuming,One meter length coating is re-coated + 50% overlap; Billing will be on actuals basis]
Post assessment Final Report Post Assessment Final Report will be submitted by Contractor. Please refer SCC, SOW and Other Tender Documents of this Contract
Description of Work / Item(s)
Amount
INTEGRITY ASSESSMENT FOR MEERUT GA
ECDA Pre Assessment ECDA Pre-Assessment as per NACE SP0502-2010 along-with on-field Pre-Survey This line item includes but not limited to the Following activities to be executed by Contractor/Bidder: . SME site visit . Cathodic Protection (CP) Audit of existing system . Assessing the ROW for feasibility of performing surveys as per subsequent SOR Items . Field exercise along with authentic results to prove requirement of drilling holes for soil contact . Provide final report before proceeding with second step This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents.
ECDA Indirect Inspection ECDA Indirect Inspection - (but not limited to) of CIPS, DCVG, ACVG, ACCA, continuous DoC, DGPS and soil resistivity surveys. Please refer Scope of Work and Special Conditions of Contract for Details. This line item includes but not limited to the Following activities to be executed by Contractor/Bidder: a. Surveys to be performed simultaneously (Preferably all surveys in a single pass) with DGPS to provide: 1. List of Geotechnical indications (shallow DOC, earth movement, exposed pipe etc.) 2. List of Coating indications in the pipeline protective coating 3. List of Cathodic Protection indications (As per NACE SP0169 criteria) 4. Survey Data with excel files (CIPS, ACCA/CAT, DCVG/ACVG, DOC, DGPS Mapping) 5. All data collected will be aligned with sub-meter DGPS 6. List of possible Interference indications b. Provide report This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents.
Soil Test for presence of Sulphur Reducing Bacteria (SRB) ( Collection of soil sample upto the depth of the pipeline & its testing at Lab)
Drilling holes (upto the depth of pipeline) on concrete / paved road/Bituminous Road or any other kind of Road/area for survey purposes (Min 2 holes per Kilometer ) including Liasioning/permissions with/from all concerned authorities or persons for drilling holes This line item includes but not limited to the Following activities to be executed by Contractor/Bidder: Drilling holes will be required if identified during the Pre-Assessment step. Liaisoning for obtaining permissions from Concerned Authorities or Personnel for drilling holes, will be in scope of Contractor/Bidder. This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents.
Excavation for Direct Inspection Excavation for Direct Inspection for ECDA including Liaisoning/permissions with/from all concerned authorities for excavation. Liaisoning with whomsoever (personnel or Authority), to obtain permission for Excavation, will be in Scope of Contractor/Bidder. Backfilling and Restoring ROW in original Backfilling of Excavated portion of road/ground, will be in Scope of Contractor. Reinstatement/Restoration of ROW of Pipeline in its Original Condition, will also be in Scope of Contractor. Liaisoning for any permission associated with Backfilling or Restoration will be in Scope of Contractor. This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents. [Assuming each dig site is L = 5m, W = 3 m, D = 3 m; Billing will be on actuals based on possible access]
Surface Preparation for Inspection Surface Preparation for Inspection including removal of old coating (if required). Pipe Surface will be developed using emery paper, buffing or any other suitable material as per Standard Engineering Practice, before application of Recoating. This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents. [Assuming One meter coating removal for each defect location on pipe; Billing will be on actuals based on possible access]
Direct Examination Inspection
Recoating Material supply with Installation. Refer Scope of Work, Special Conditions of Contract and other Tender Documents for Detail. Supply and Installation/applying of New Coating Material, will be in Scope of Contractor. [Assuming,One meter length coating is re-coated + 50% overlap; Billing will be on actuals basis]
Post assessment Final Report Post Assessment Final Report will be submitted by Contractor. Please refer SCC, SOW and Other Tender Documents of this Contract
Description of Work / Item(s)
Amount
INTEGRITY ASSESSMENT FOR DEWAS GA
ECDA Pre Assessment ECDA Pre-Assessment as per NACE SP0502-2010 along-with on-field Pre-Survey This line item includes but not limited to the Following activities to be executed by Contractor/Bidder: . SME site visit . Cathodic Protection (CP) Audit of existing system . Assessing the ROW for feasibility of performing surveys as per subsequent SOR Items . Field exercise along with authentic results to prove requirement of drilling holes for soil contact . Provide final report before proceeding with second step This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents.
ECDA Indirect Inspection ECDA Indirect Inspection - (but not limited to) of CIPS, DCVG, ACVG, ACCA, continuous DoC, DGPS and soil resistivity surveys. Please refer Scope of Work and Special Conditions of Contract for Details. This line item includes but not limited to the Following activities to be executed by Contractor/Bidder: a. Surveys to be performed simultaneously (Preferably all surveys in a single pass) with DGPS to provide: 1. List of Geotechnical indications (shallow DOC, earth movement, exposed pipe etc.) 2. List of Coating indications in the pipeline protective coating 3. List of Cathodic Protection indications (As per NACE SP0169 criteria) 4. Survey Data with excel files (CIPS, ACCA/CAT, DCVG/ACVG, DOC, DGPS Mapping) 5. All data collected will be aligned with sub-meter DGPS 6. List of possible Interference indications b. Provide report This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents.
Soil Test for presence of Sulphur Reducing Bacteria (SRB) ( Collection of soil sample upto the depth of the pipeline & its testing at Lab)
Drilling holes (upto the depth of pipeline) on concrete / paved road/Bituminous Road or any other kind of Road/area for survey purposes (Min 2 holes per Kilometer ) including Liasioning/permissions with/from all concerned authorities or persons for drilling holes This line item includes but not limited to the Following activities to be executed by Contractor/Bidder: Drilling holes will be required if identified during the Pre-Assessment step. Liaisoning for obtaining permissions from Concerned Authorities or Personnel for drilling holes, will be in scope of Contractor/Bidder. This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents.
Excavation for Direct Inspection Excavation for Direct Inspection for ECDA including Liaisoning/permissions with/from all concerned authorities for excavation. Liaisoning with whomsoever (personnel or Authority), to obtain permission for Excavation, will be in Scope of Contractor/Bidder. Backfilling and Restoring ROW in original Backfilling of Excavated portion of road/ground, will be in Scope of Contractor. Reinstatement/Restoration of ROW of Pipeline in its Original Condition, will also be in Scope of Contractor. Liaisoning for any permission associated with Backfilling or Restoration will be in Scope of Contractor. This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents. [Assuming each dig site is L = 5m, W = 3 m, D = 3 m; Billing will be on actuals based on possible access]
Surface Preparation for Inspection Surface Preparation for Inspection including removal of old coating (if required). Pipe Surface will be developed using emery paper, buffing or any other suitable material as per Standard Engineering Practice, before application of Recoating. This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents. [Assuming One meter coating removal for each defect location on pipe; Billing will be on actuals based on possible access]
Direct Examination Inspection
Recoating Material supply with Installation. Refer Scope of Work, Special Conditions of Contract and other Tender Documents for Detail. Supply and Installation/applying of New Coating Material, will be in Scope of Contractor. [Assuming,One meter length coating is re-coated + 50% overlap; Billing will be on actuals basis]
Post assessment Final Report Post Assessment Final Report will be submitted by Contractor. Please refer SCC, SOW and Other Tender Documents of this Contract
Description of Work / Item(s)
Amount
INTEGRITY ASSESSMENT FOR STEEL PIPELINE AT AGRA
ECDA Pre Assessment ECDA Pre-Assessment as per NACE SP0502-2010 along-with on-field Pre-Survey This line item includes but not limited to the Following activities to be executed by Contractor/Bidder: . SME site visit . Cathodic Protection (CP) Audit of existing system . Assessing the ROW for feasibility of performing surveys as per subsequent SOR Items . Field exercise along with authentic results to prove requirement of drilling holes for soil contact . Provide final report before proceeding with second step This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents.
ECDA Indirect Inspection ECDA Indirect Inspection - (but not limited to) of CIPS, DCVG, ACVG, ACCA, continuous DoC, DGPS and soil resistivity surveys. Please refer Scope of Work and Special Conditions of Contract for Details. This line item includes but not limited to the Following activities to be executed by Contractor/Bidder: a. Surveys to be performed simultaneously (Preferably all surveys in a single pass) with DGPS to provide: 1. List of Geotechnical indications (shallow DOC, earth movement, exposed pipe etc.) 2. List of Coating indications in the pipeline protective coating 3. List of Cathodic Protection indications (As per NACE SP0169 criteria) 4. Survey Data with excel files (CIPS, ACCA/CAT, DCVG/ACVG, DOC, DGPS Mapping) 5. All data collected will be aligned with sub-meter DGPS 6. List of possible Interference indications b. Provide report This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents.
Soil Test for presence of Sulphur Reducing Bacteria (SRB) ( Collection of soil sample upto the depth of the pipeline & its testing at Lab)
Drilling holes (upto the depth of pipeline) on concrete / paved road/Bituminous Road or any other kind of Road/area for survey purposes (Min 2 holes per Kilometer ) including Liasioning/permissions with/from all concerned authorities or persons for drilling holes This line item includes but not limited to the Following activities to be executed by Contractor/Bidder: Drilling holes will be required if identified during the Pre-Assessment step. Liaisoning for obtaining permissions from Concerned Authorities or Personnel for drilling holes, will be in scope of Contractor/Bidder. This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents.
Excavation for Direct Inspection Excavation for Direct Inspection for ECDA including Liaisoning/permissions with/from all concerned authorities for excavation. Liaisoning with whomsoever (personnel or Authority), to obtain permission for Excavation, will be in Scope of Contractor/Bidder. Backfilling and Restoring ROW in original Backfilling of Excavated portion of road/ground, will be in Scope of Contractor. Reinstatement/Restoration of ROW of Pipeline in its Original Condition, will also be in Scope of Contractor. Liaisoning for any permission associated with Backfilling or Restoration will be in Scope of Contractor. This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents. [Assuming each dig site is L = 5m, W = 3 m, D = 3 m; Billing will be on actuals based on possible access]
Surface Preparation for Inspection Surface Preparation for Inspection including removal of old coating (if required). Pipe Surface will be developed using emery paper, buffing or any other suitable material as per Standard Engineering Practice, before application of Recoating. This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents. [Assuming One meter coating removal for each defect location on pipe; Billing will be on actuals based on possible access]
Direct Examination Inspection
Recoating Material supply with Installation. Refer Scope of Work, Special Conditions of Contract and other Tender Documents for Detail. Supply and Installation/applying of New Coating Material, will be in Scope of Contractor. [Assuming,One meter length coating is re-coated + 50% overlap; Billing will be on actuals basis]
Post assessment Final Report Post Assessment Final Report will be submitted by Contractor. Please refer SCC, SOW and Other Tender Documents of this Contract
Description of Work / Item(s)
Amount
INTEGRITY ASSESSMENT FOR FIROZABAD CA
ECDA Pre Assessment ECDA Pre-Assessment as per NACE SP0502-2010 along-with on-field Pre-Survey This line item includes but not limited to the Following activities to be executed by Contractor/Bidder: . SME site visit . Cathodic Protection (CP) Audit of existing system . Assessing the ROW for feasibility of performing surveys as per subsequent SOR Items . Field exercise along with authentic results to prove requirement of drilling holes for soil contact . Provide final report before proceeding with second step This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents.
ECDA Indirect Inspection ECDA Indirect Inspection - (but not limited to) of CIPS, DCVG, ACVG, ACCA, continuous DoC, DGPS and soil resistivity surveys. Please refer Scope of Work and Special Conditions of Contract for Details. This line item includes but not limited to the Following activities to be executed by Contractor/Bidder: a. Surveys to be performed simultaneously (Preferably all surveys in a single pass) with DGPS to provide: 1. List of Geotechnical indications (shallow DOC, earth movement, exposed pipe etc.) 2. List of Coating indications in the pipeline protective coating 3. List of Cathodic Protection indications (As per NACE SP0169 criteria) 4. Survey Data with excel files (CIPS, ACCA/CAT, DCVG/ACVG, DOC, DGPS Mapping) 5. All data collected will be aligned with sub-meter DGPS 6. List of possible Interference indications b. Provide report This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents.
Soil Test for presence of Sulphur Reducing Bacteria (SRB) ( Collection of soil sample upto the depth of the pipeline & its testing at Lab)
Drilling holes (upto the depth of pipeline) on concrete / paved road/Bituminous Road or any other kind of Road/area for survey purposes (Min 2 holes per Kilometer ) including Liasioning/permissions with/from all concerned authorities or persons for drilling holes This line item includes but not limited to the Following activities to be executed by Contractor/Bidder: Drilling holes will be required if identified during the Pre-Assessment step. Liaisoning for obtaining permissions from Concerned Authorities or Personnel for drilling holes, will be in scope of Contractor/Bidder. This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents.
Excavation for Direct Inspection Excavation for Direct Inspection for ECDA including Liaisoning/permissions with/from all concerned authorities for excavation. Liaisoning with whomsoever (personnel or Authority), to obtain permission for Excavation, will be in Scope of Contractor/Bidder. Backfilling and Restoring ROW in original Backfilling of Excavated portion of road/ground, will be in Scope of Contractor. Reinstatement/Restoration of ROW of Pipeline in its Original Condition, will also be in Scope of Contractor. Liaisoning for any permission associated with Backfilling or Restoration will be in Scope of Contractor. This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents. [Assuming each dig site is L = 5m, W = 3 m, D = 3 m; Billing will be on actuals based on possible access]
Surface Preparation for Inspection Surface Preparation for Inspection including removal of old coating (if required). Pipe Surface will be developed using emery paper, buffing or any other suitable material as per Standard Engineering Practice, before application of Recoating. This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents. [Assuming One meter coating removal for each defect location on pipe; Billing will be on actuals based on possible access]
Direct Examination Inspection
Recoating Material supply with Installation. Refer Scope of Work, Special Conditions of Contract and other Tender Documents for Detail. Supply and Installation/applying of New Coating Material, will be in Scope of Contractor. [Assuming,One meter length coating is re-coated + 50% overlap; Billing will be on actuals basis]
Post assessment Final Report Post Assessment Final Report will be submitted by Contractor. Please refer SCC, SOW and Other Tender Documents of this Contract
SOPAN O AND M CO PVT KTD
Bureau Veritas (India) Pvt. Ltd.
SANMARG Projects Pvt. Ltd.
SARK EPC Projects Pvt.Ltd.
SOPAN O AND M CO PVT KTD
Bureau Veritas (India) Pvt. Ltd.
SARK EPC Projects Pvt.Ltd.
Bureau Veritas (India) Pvt. Ltd.
SOPAN O AND M CO PVT KTD
Bureau Veritas (India) Pvt. Ltd.
SANMARG Projects Pvt. Ltd.
SOPAN O AND M CO PVT KTD
Bureau Veritas (India) Pvt. Ltd.
SOPAN O AND M CO PVT KTD
SANMARG Projects Pvt. Ltd.
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .