| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹25 LAccepted-AOC 520C MAIN ROAD WARD NO 12 METTU STREET ELAMBALUR PERAMBALUR | PERAMBALUR | PERAMBALUR | TAMIL NADU | 621220 | ₹25 L Quoted ₹57,561.58 | 1 | Accepted-AOC L1 |
| 2 | Not Admitted-Fee/PreQual/Technical 1 367 SIVAN KOVIL STREET THONDAMATHURAI POST VEPPANTHATTAI TALUK PERAMBALUR DISTRICT | PERAMBALUR | TAMIL NADU | 621101 | - | - | Not Admitted-Fee/PreQual/Technical EMD Not Furnished |
| Sl No | Description | Qty | Unit | KDM BUILDERS AND CONTRACTORS L1 |
|---|---|---|---|---|
| 1.01 | Excavation of Pole Pits for poles upto 8.00m length by using JCB/Manual (1.25 X 0.6 X 1.5M) | 1 | per pit | 630 ₹743.40 |
| 1.02 | Excavation of Pole Pits for pole above 8.00m length by using JCB/Manual (1.25x06x1.83M) | 1 | per pit | 590 ₹696.20 |
| 1.03 | Excavation of Pole Pits in Hard Soil (common to all size of poles) | 1 | per pit | 200 ₹236 |
| 1.04 | Excavation of Pole Pits in rocky area (common to all size of poles) by blasting / Manual | 1 | per pit | 200 ₹236 |
| 1.05 | Excavation of Stay pit of 4.5 ' to 5 ' depth using JCB / Manual (0.95 X 0.6 X 1.2 M) | 1 | per pit | 490 ₹578.20 |
| 1.06 | Excavation of Stay pit in Hard rock soil (0.95 X 0.6 X 1.2 M) | 1 | per pit | 200 ₹236 |
| 1.07 | Erection of RCC, REC, PSC poles upto 8.00m length by using Crane / Manual | 1 | per pole | 540 ₹637.20 |
| 1.08 | Erection of RCC, REC, PSC poles above 8.00m length by using Crane / Manual | 1 | per pole | 640 ₹755.20 |
| 1.09 | Erection of metal supports above 9m / RSJ / Rail Pole/Tubular Poles | 1 | per pole | 540 ₹637.20 |
| 1.10 | Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc. excluding stay pit excavation | 1 | Each set | 200 ₹236 |
Tender Value
₹25 L
EMD Value
₹25,000
Closing Date
2 Oct 2025, 2:00 pmClosed
Superintending Engineer/ PEDC / Perambalur
O/o. Superintending Engineer, TANGEDCO, PEDC, Near 4- Road, 230/110KV Auto SS Campus, Perambalur
THE VARIOUS DCW WORKS AND IMPROVEMENT WORKS IN O AND M PERAMBALUR DIVISION
2025_EB_605190_1
MM-E-08/2025-26, Dt.15.09.2025
Open Tender
Electrical related work
7 days
Perambalur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹25,000
Yes
26 May 2026
17 Sept 2025
3 Oct 2025
17 Sept 2025
2 Oct 2025
17 Sept 2025
Excavation of Pole Pits for poles upto 8.00m length by using JCB/Manual (1.25 X 0.6 X 1.5M)
Excavation of Pole Pits for pole above 8.00m length by using JCB/Manual (1.25x06x1.83M)
Excavation of Pole Pits in Hard Soil (common to all size of poles)
Excavation of Pole Pits in rocky area (common to all size of poles) by blasting / Manual
Excavation of Stay pit of 4.5 ' to 5 ' depth using JCB / Manual (0.95 X 0.6 X 1.2 M)
Excavation of Stay pit in Hard rock soil (0.95 X 0.6 X 1.2 M)
Erection of RCC, REC, PSC poles upto 8.00m length by using Crane / Manual
Erection of RCC, REC, PSC poles above 8.00m length by using Crane / Manual
Erection of metal supports above 9m / RSJ / Rail Pole/Tubular Poles
Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc. excluding stay pit excavation
Erection of additional Stay in the same stay rod, excluding excavation of stay pit and burial of stay rod.
Fixing of V cross arm 3.5 feet
Fixing of V cross arm 4.5 feet
Fixing of V cross arm 5.0 feet
Fixing of Fixing of LT S phase cross arm
Fixing of Fixing of LT 3 phase cross arm
Fixing of Fixing of HT / LT Ti fitting
Fixing of Fixing of HT PIN insulator with Pin 11 kv
Fixing of HT PIN insulator with Pin 22 kv
Fixing of HT PIN insulator with Pin 33 kv
Fixing of LT PIN insulator with pin
Fixing of HT strain disc 11 KV with Metal parts
Fixing of HT strain disc 22 KV with Metal parts
Fixing of HT strain disc 33 KV with Metal parts
Fixing of Tapping cross arm
Fixing of Two Tapping cross arm per cut point upto 33 KV line including fixing of Discs,insulators and Jumpering etc..
Fixing of Top Channel
Fixing & erection of Cross bracing
Fixing of shackle with Metal parts
Fixing of Aluminium knob
Fixing of HT LAS (3 Nos.)
Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor
Paving and stringing of conductors of above 7/2.59 mm ACSR or other equivalent conductor upto 7/3.35mm ACSR or other equivalent conductor
Paving and stringing of conductors of 7/4.09mm ACSR or other equivalent conductor
Paving and stringing of conductors of 7/4.72 mm Dog Conductor or other equivalent conductor
Releasing and reerection (resagging) of one run of all sizes of conductor
Complete Erection of Double Pole Distribution Transformer structure as per TNEB standard like pole pit excavation & erection, stay pit excavation and erection, feeders arrangement, Open type fuse unit, HT / LT LAS and jumpering, 3 Nos Earth pits with earth trough, concreting,coping, Colour washing of RCC poles, Painting of Structure Materials (including cost of paint(red oxide,Aluminium) and distember), Danger Board fixing etc.. (excluding erection of Distribution Transformer)
Erection of11 KV/22 KV single pole Structure including erection of DT complete with centre support with pole pit excavation & erection, stay pit excavation and erection, feeders arrangement, Open type fuse unit, HT /LT LAS and jumpering, 3Nos earth pits with earth trough, structure earthing complete, concerting,coping, colour washing of RCC poles, painting of structure materials (including cost of paint (red oxide,aluminum)and distermber), danger board fixing etc..(exculding erection of distribution transformer) (Data as per Annexure III)
Erection of distribution transformer inculding loading of distribution transformer at stores and erection at structure or vice versa. Upto 25 KVA distribution transformer/metering set.
Erection of Distribution Transformer including loading of Distribution Transformer at stores and erection at structure or vice versa. Upto 25 KVA to 100 KVA
Failed DT replacement below 100 KVA
Failed DT replacement 100 KVA and above
Erection of DP structure with stay as per TNEB standard including fixing of top channel, cross bracing, HG Fuse Unit, concreting, painting, colour washing etc., With 11 KV AB switch using all types of poles of size 9.14 m and above length
Erection of DP structure with stay as per TNEB standard with 22/33 KV AB switch using all types of poles of size 9.14 m and above lenth including fixing of top channel, cross bracing, HG Fuse Unit, concreting, painting, colour washing etc.,
Erection of single pole DP with complete with earthing
Concreting with 1:4:8 mix using 40 mm Jelly including curing(Material + labour) Mass concreting of poles with coping 0.6MX 0.45MX1.25M
Concreting with 1:4:8 mix using 40 mm Jelly including curing(Material + labour) Sleeve concreting with coping 0.6MX 0.6MX0.3M
Concreting with 1:4:8 mix using 40 mm Jelly including curing(Material + labour) Stay concreting with coping 0.3M dia and 0.75 long
Earthing of poles with GI wires 4 or 6 SWG by coil earthing
Provision of spike with earthing arrangement including material (other than clamps & GI wire ) and fabrication
Pipie earthing including excavation of earth pit and fixing earth pipe 3 m length
Replacing the corroded earth pipes of transformer structure and replacing the earth wire completely with aluminium lugs for termination
Replacement of corroded earth pipe
Erection of fourth Earth pipe including earthing
Loading & unloading of REC, RCC, PSC pole upto 8.00 m length
Loading & unloading of All REC, RCC pole above 8.00 m length
Loading of Conductor with ramp
Unloading of Conductor with ramp
Loading of Iron & Steel
Unloading of Iron & Steel
Loading of line materials (Including Stacking except conductor drum & scrap material)
Unloading of line materials (Including Stacking except conductor drum & scrap material)
Loading of 11 KV disc
Unloading of 11 KV disc
Loading of LT Pin insulator shackle, guy shackle, LT Pin, Metal parts, HT pin etc.,
Unloading of LT Pin insulator shackle, guy shackle, LT Pin, Metal parts, HT pin etc.,
Loading of scrap materials
Unloading of scrap materials
Transportation of all types and sizes of poles and other associated materials from Road side to pole pit and vice versa upto 1.0 KM
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) For a lead upto 5 KM
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) Above 5 KM of lead of every KM
Transporting of Distribution Transformer / Line materials from stores to office / site upto 10KM distance by engaging 1 Ton capacity Minidor (Lorry)
Transporting of Distribution Transformer / Line materials from stores to office / site Above 10 KM distance by engaging 1 Ton capacity Minidor (Lorry)
Provision of guarding with two numbers earth pits excluding stay set erection - gradle guarding including earthing and earth pit excavation without material
Dismantling of RCC, REC, PSC & metal pole of all sizes including the closing of the pit
Dismantling of stay set complete including stay rod
Dismantling of conductor of upto 7/3.35 including transporting the conductors to the nearest road side and stocking in coils
Dismantling of conductor of above 7/3.35 including transporting the conductors to the nearest road side and stocking in coils
Dismantling of Transformer structure materials complete set and transporting the same from the location to the road side
Releasing of LT S ph "X" Arm with all accessories
Relaasing of LT 3 ph "X" Arm with all accessories
Releasing of 3' - 6" "V" Cross Arm/Tapping channal/Guarding "X" Arm with all accessories
Releasing of 4' - 6" and "V" Cross Arm with all accessories
Releasing of 5' "V" Cross Arm with all accessories
Releasing of Distn.Tr. Only at field - Upto 25 KVA / Metering set
Releasing of Distn.Tr. Only at field- Above 25 KVA and upto 100KVA
Dismantling of structure poles
Painting of iron poles up to 36 ft length with double coats including cost of paint
Painting of iron poles up to 40 ft 200/100 length with double coats including cost of paint
Painting of structure materials distribution transformers with aluminium paint of structure poles and writing of transformer details (Paint to be supplied by Department)
Labour charges for alteration of back clamp
Labour charges for alteration of Stay clamp
Providing of holes all size angles/Channel upto 3/4"
Providing of holes all size angles/Channel above 3/4"
Clearing of tree branches of coconut tree
Clearing of tree branches of Neem, Tamarind, Country tree
Clearing of karruvelam
Converting pin point into cut point in HT Lines
Converting pin point into cut point in LT Lines (single / Three phase)
Resagging of lines for all sizes cut point location
Set right of leaning poles both HT & LT (Pin point )
Set right of leaning poles both HT & LT ( Cutpoint)
Replacement of Guy Shackle only in Existing Stay
Replacement of 11KV Polymer Pin Insulator
Replacement of 22KV Polymer Pin Insulator
Replacement of 33KV Polymer Pin Insulator
Replacement of 11KV Disc
Replacement of 22KV Disc
Fencing of Distribution Transformer Structure at Road side- Fabrication and Erection including all materials (Chain link fencing)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid