Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAccepted-AOC | L1 | Accepted-AOC m/s savera buildcon is l1 in this lot | |
| 2 | L2₹7.1 L+₹19,002.75 (2.75%)Rejected-Finance 35 MODEL TOWN GT ROAD JANDIALA GURU AMRITSAR | AMRITSAR | AMRITSAR | PUNJAB | L2 | Rejected-Finance m/s star construction is l2 in this lot |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
11 Feb 2021, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
MGCCD4 AMROHA
CONSTRUCTION OF VRB AT KM 1.730 OF SOHAT MINOR UNDER MGC PROJECTSTAGE-II DISTT. AMROHA LOT 08
2021_UPIDC_545769_4
03/EE/20-21 LOT 08
Open Tender
Civil Works - Canal
Item Rate
AMROHA
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹30,000
9 Mar 2021
5 Feb 2021
11 Feb 2021
5 Feb 2021
11 Feb 2021
5 Feb 2021
90 days
Amount
Earthwork in foundation in all type of soil including all lead & lift as required also including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & Laying of C.C M-10 A-40 (1:3:6) in foundation of abutment and wing walls including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & Laying of C.C M-7.5 A-40 (1:4:8) in between abutment and wing walls traingilar portion including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Ist class Brick work Cement, Corase 1:4 Sand mortar in abutment, wing walls and parapets etc. including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Struck pointing 1:2 Cement corase sand mortar on all open surface of brick masonary work including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing Centring & shuttering for bridge slab, bed block, dirt wall or in foundation etc. for cement concrete work in foundatio
RCC M-20 A20 (1:1.5:3) in slab including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
RCC M-25 A20 (1:1:2) in bed block, dirt wall etc. including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
P / Fixing 20mm thick expenssion joint with bitumen stone dust & corase sand including angle iron on both side including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Steel reinforcement work in RCC including cutting Bending binding & placing in position as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
P / Filling of local sand as back filling including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
P/F of 75 mm dia PVC pipe including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
P / Fixing year plate including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
P/F of BM plate including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
S/Fixing wheel guard stone size (150mmx150mmx1500mm) including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
E/W for making approaches & diverson of VRB including all lead lift compaction dressing including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
S/L RBM on diverson / Approaches of VRB including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
M/S STAR CONSTRUCTION COMPANY
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .