Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 CrAccepted-AOC ASSAM AS | ₹4.6 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹4.6 CrRejected-AOC ASSAM AS | KARIMGANJ | ASSAM | 788803 | ₹4.6 Cr | L2 | Rejected-AOC L2 |
| 3 | L3₹4.6 CrRejected-AOC S O SHRI DINESH CH BASUMATARY VILL SHYAMTHAIBARI P O P S SERFANGURI DIST KOKRAJHAR BTC ASSAM | SERFANGURI | KOKRAJHAR | ASSAM | ₹4.6 Cr | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | BIRKHANG BASUMATARY L1 | AMIO KUNGOR BASUMATARY L2 | Sri Sanswrang Basumatary L3 |
|---|---|---|---|---|---|---|
| 1.00 | A. Const. of Pavilion cum Cover Gallery:
Cost of Civil Works (G.Floor)
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
2.8.1 All kinds of soil. | 410.99 | Cum | 286.85 ₹1.2 L | 286.85 ₹1.2 L | 286.85 ₹1.2 L |
| 2.00 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 200.94 | Cum | 368.65 ₹74,076.53 | 368.65 ₹74,076.53 | 368.65 ₹74,076.53 |
| 3.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | 17,826.08 | Kg | 89.65 ₹16.0 L | 89.65 ₹16.0 L | 89.65 ₹16.0 L |
| 4.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
5.22A.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | 38,783.51 | Kg | 89.65 ₹34.8 L | 89.65 ₹34.8 L | 89.65 ₹34.8 L |
| 5.00 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 6,533.26 | Kg | 78.2 ₹5.1 L | 78.2 ₹5.1 L | 78.2 ₹5.1 L |
| 6.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
4.1.3 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 28.14 | Cum | 7,365.15 ₹2.1 L | 7,365.15 ₹2.1 L | 7,365.15 ₹2.1 L |
| 7.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
4.1.4 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size
derived from natural sources) | 16.96 | Cum | 7,226.95 ₹1.2 L | 7,226.95 ₹1.2 L | 7,226.95 ₹1.2 L |
| 8.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de
rived from natural sources) | 133.01 | Cum | 8,364.2 ₹11.1 L | 8,364.2 ₹11.1 L | 8,364.2 ₹11.1 L |
| 9.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
5.2.2 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size
derived from natural sources) | 42.25 | Cum | 10,185.05 ₹4.3 L | 10,185.05 ₹4.3 L | 10,185.05 ₹4.3 L |
| 10.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 292.76 | Cum | 10,719.3 ₹31.4 L | 10,719.3 ₹31.4 L | 10,719.3 ₹31.4 L |
Tender Value
₹4.6 Cr
EMD Value
₹9.2 L
Closing Date
19 Feb 2026, 12:30 pmClosed
Sri J.M. Basumatary
O/o the Addl. Chief Engineer-cum-Director, PWD, BTC, Kokrajhar.
Construction of Bir Chilagang Basumatary Memorial Stadium at Bijni, Ulubari, Chirang under Grants to BTC for Infrastructure Development Fund for the FY 2025-26. (Package No.TN_104_01).
2026_BTC_50600_1
No.125/Infra/BTC/2022-23/385
Open Tender
Civil Works - Building
730 days
Kokrajhar
Refer to Tender Documents
4 documents required · 4 mandatory
₹9,200
₹9.2 L
Yes
26 Feb 2026
29 Jan 2026
19 Feb 2026
29 Jan 2026
19 Feb 2026
29 Jan 2026
29 Jan 2026 - 19 Feb 2026
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.31 MB
SBD.pdf
Tender Documents • 3.14 MB
BOQ_80538.xls
BOQ • 0.50 MB
FOB.pdf
Additional Documents • 0.26 MB
Download all tender documents and submit your bid