Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹25.1 L
EMD Value
₹26,000
Closing Date
16 Feb 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, panchayat, R & B Division, Surat.
(1) Construction of C.C.Road at Satarbhai House to Rajakbhai House and Village Bhanodra (2) Construction of C.C.Road From Shivrampur Junagam Rang Faliya to Visama to Smashan Gruh Joing Road (3) Construction of C.C.Road Behind Panchvati Garden near Ground (4) Providing and Fixing Paver Block at Aashramshala and Village Kharvasa (5) Providing and Fixing Paver Block at Nagar Faliya at Damka Village (6) Construction of Remaining protection wall at Tekra faliya from vanmaribhai balubhai patel house near bus stop to towards Aanganvadi kendra-02 village Vansva,Ta: Choryasi Dist: Surat (2nd time)
273171
29 OF 2025-26
Open
Civil Works - Others
Works
Surat
5 documents required · 5 mandatory
₹1,500
Yes
Executive Engineer, panchayat R & B Division, surat
₹26,000
Yes
5 Feb 2026
5 Feb 2026
5 Feb 2026
16 Feb 2026
5 Feb 2026
Name of work: (1) Construction of C.C.Road at Satarbhai House to Rajakbhai House
@Village Bhanodra (2) Construction of C.C.Road From Shivrampur
Junagam Rang Faliya to Visama to Smashan Gruh Joing Road (3)
Construction of C.C.Road Behind Panchvati Garden near Ground (4)
Providing & Fixing Paver Block at Aashramshala @ Village Kharvasa (5)
Providing & Fixing Paver Block at Nagar Faliya at Damka Village (6)
Construction of Remaining protection wall at Tekra faliya from vanmaribhai
balubhai patel house near bus stop to towards Aanganvadi kendra-02 @
village Vansva,Ta: Choryasi Dist: Surat
Memorandum showing items of works to be carried out
It. No. Quantities Item of work Estimated Total Amount
It. No. Quantities Item of work Estimated Total Amount
estimated but may In figures according to
be more or less Rs. Ps. estimated
Hect. Clearing and grubbing road land including
uprooting rank vegetation, grass bushes, shrubs,
1 0.01 saplings and trees girth up to 300 mm removal of 28455.09
stumps of trees cut earlier and disposal of
unserviceable materials.
Cu.mt. Box cutting the road surface to proper slope and
camber for making a base for road work
including removing the excavated stuff and
2 240.68 depositing on the road side slope as directed 109.41
upto 50Mt.lead.
Cu.mt. Filling in foundation and plinth with brick Bats
Chhara/ Construction Waste/ Slag in layers of
20cm. thickness including watering, remming
3 61.08 and consolidating etc. complete. 621.46
Cu.mt. Providing and laying cement concrete 1:4:8 (1-
Cement : 4coarse sand : 8- hand broken stone
aggregates 40 mm nominal size) and curing
complete excluding cost of formwork in (A)
4 71.08 Foundation and Plinth 2769.69
Cu.mt. Construction of Cement concrete Pavement
using M25 grade concrete including the cost of
side shuttering with MS channels, Pavement
Laid using Double beam screed vibrator or
equivalent and finishing the top surface to
required slope and grade with rough /broom
finish using power trowels (fan / disc) of
standard make including curing (If Required
with Curing Compound), providing and mixing
of hardening compound in required amount as
instructed by engineer incharge, cutting of
Pavement construction joint 3 mm x 20 mm by
using Diamond Saw (Concrete Cutter) at every
3.5mt length as per specification including
filling the joint with selent (Sika, Fosroc, Dr
Fixit or Equivalent make etc. complete.
Kg Providing IS mark TMT bar FE-500/500D
reinforcement for RCC work including bending
6 3758.75 & placing in position complete up to floor two 77.29
No Providing Name Plate or Other Arrangement
for showing The Details Of Grant and Work
as Directed.(Lump Sum)
Smt Preparing surface by brushing with wire
brushing for removing caked mud etc sweeping
with brooms and finally fanning the cleaned
surface with gunny bags to remove all loose dirts
etc. (i) water bound Macadam surface(New)
cumt Providing and laying cement concrete 1:3:6 (1-
Cement : 3-coarse sand : 6- hand broken stone
aggregates 40 mmnominal size) and curing
complete excluding cost of formwork in (A)
Foundation and Plinth
cumt Consructing of granular sub-base by providing
Blast furnance Steel Slag / Brickbats /
Construction Waste as aggregate and Fine
aggregate machine crushed stone aggregate
10 117.38 satisfying MOST specification of grading II 838.30
including spreading in uniform layer with motor
grader on prepared surface, mixing by mix in
place method with rotavator at OMC and
compacting with vibratory roller to achieve the
Smt Providing and fixing pre-cast Rubber Dye / steel
Dye inter locking concrete block 60mm thick
with grade of concrete M300 pnumatic
compressed / vibrated mechanically and as per
approved design Confirming to IS 15658 :
including 35 mm Sand layer for levelling and
filling the joint with sand in proper line and level
as per guidlines of IRC : SP 63-2018 etc.
Complete. and laying cement concrete 1:2:4 (1-
Cu.mt. Providing
Cement : 2- Coarse sand : 4- graded stone
aggregates 20 mm nominal size) and curing
12 2.01 complete excluding cost of formwork in (A) 3741.69
Foundation and Plinth
Cum Earthwork for embankment including breaking
clods, dressing with all lead and lift and
including watering rolling and consolidation of
13 18.54 subgrade in layers at O.M.C. to required dry 169.44
density including filling the depression which
occur during the process using power roller 8T
to 10T.(E) From Borrow area within 3.0KM.
Excavation for foundation up to 1.5 mt. Depth
including sorting out and stacking of useful
material and disposing off the excavated stuff up
to All lead. (I) loose and soft soil.
Cu.Mt Providing & filling in foundation with ordinary
cement concrete M 150 mix and providing
necessary vertical pin headers including
formwork vibrating ramming & curing complete.
Sq.mt. white washing with lime on wall surface (two
coats) to give even shade including thoroughly
boomimg the surface to remove all
dirt,dust,mortardrops and and other foreign
No Providing weep holes in abutment, returns using
100 mm. dia A.C. pipe with C.I. grating
17 48.00 including cutting, placing the pipe in required 89.20
slope and position as directed etc. complete. (As
per detailed specification)
Cu.Mt Filling in foundation and plinth with murrum or
selected soil in layers of 20cm. thickness
including watering,ramming and consolidating
18 109.00 etc. complete. 301.78
M.Ton Providing and laying in position FE 500D TMT
reinforcement including cutting, bending,
hooking and tying complete as per detailed
19 0.53 drawings for the following.(A) Piers (B) 73858.69
Abutments (C) R.C.C. Returns
Cu.Mt Earthwork for embankment including breaking
clods, dressing with all lead and lift and
including watering rolling and consolidation of
subgrade in layers at O.M.C. to required dry
density including filling the depression which
20 108.00 occur during the process using power roller 8T 160.14
to 10T with all lead & Lift.
Rs. Twenty Five Lack Ten Thousand Four Hundred Eighty Four and Paise Thirty Four Only.
I/We am/are willing to carry out the work at ________________ % above/below ( percent should be
written in figures and in words ) of the estimated rates mentioned above. Amount of my/our tender works out as
*Estimated amount *Estimated amount
put to tender Rs. 2510484.34 put to tender Rs.
Deduct ____ % below Rs. _________ Add ____ % above Rs. _________
Net Rs. _________ Total Rs. _________
*( Please strike out which ever is not applicable )
Note 1:- The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
Note 2 :- The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
Note 3:- GST and Income tax TDS will be deducted at a source while making payments of bills
Note 4:- In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R.: PRC-10/2017 Cement Consumption/16/C, Date:11/05/2017 as stated in S.O.R.
therefore in R.C.C. items where there is a change as per actual mix design the cost of
difference of cement consumption have been deducted from the rate of original item at the
Signature of Bidder
Deputy Executive Engineer Executive Engineer
Panchayat (R&B) Sub Division Panchayat (R&B) Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
8.tender booklet-1.pdf
Building-Specification Book BOTH SIDE PRINT.pdf
CamScanner 04-09-2025 15.03.58.pdf
DMO_2799_11-Mar-2024_662.pdf
GRs - Roads BOTH SIDE PRINT.pdf
SBD Building GR.pdf
Final GR and Special Attention To Tender.pdf
05-GR.pdf
final SBD cc road (2).pdf
Schedule-BOQ CC Road AND Paver.pdf
SPECIFICATION CC Road and paver Block.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .