Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹51.9 CrAdmitted-Finance PLOT NO 38 SEC A WARD NO 05 P O MANCHESWAR INDUSTRIAL ESTATE DIST KHURDHA | KHURDHA | KHURDHA | ODISHA | L1 | Admitted-Finance | ||
| 2 | L1₹51.9 CrAdmitted-Finance H NO HIG 7 SECTOR 2 BEHIND MADAN COMPLEX SHANKAR NAGAR RAIPUR C G 492007 | RAIPUR | RAIPUR | CHHATTISGARH | 492007 | L1 | Admitted-Finance | ||
| 3 | L2₹53.7 Cr+₹1.8 Cr (3.49%)Admitted-Finance AT PO PS PANIKOILI DIST JAJPUR ODISHA PIN 755043 | PANIKOILI | JAJPUR | ODISHA | 755043 | L2 | Admitted-Finance | ||
| 4 | L3₹54.9 Cr+₹3.0 Cr (5.87%)Admitted-Finance | L3 | Admitted-Finance | ||
| 5 | L4₹54.9 Cr+₹3.0 Cr (5.87%)Admitted-Finance AT PURNAPANI NEAR CIRCUIT HOUSE PO BHABANIPATNA DIST KALAHANDI ODISHA PIN NO 766001 | BHABANIPATNA | KALAHANDI | ODISHA | 766001 | L4 | Admitted-Finance |
Tender Value
₹61.0 Cr
Closing Date
22 Sept 2021, 5:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer, JICA Projects, BLB, Sukinda
O/o the Chief Engineer, JICA Projects, BLB, Sukinda At- Jamuposi Po- Amploba, Dist- Jajpur , Odisha, 755018
Earth Work, Structural work, Lining work
2021_JICA_70596_1
CE-JICA-BLB-02/2021-22 (1)
National Competitive Bid
Civil Works - Canal
Percentage
730 days
Garabandhagada
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
Exempted
O/o the Chief Engineer,JICA Projects, BLB, Sukinda
6 Jul 2022
28 Aug 2021
23 Sept 2021
28 Aug 2021
22 Sept 2021
2 Sept 2021
28 Aug 2021 - 7 Sept 2021
1 Sept 2021
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CANAL EXCAVATION - EARTH WORK | |||||
| 1.01 | Clearing and grubbing jungle covered with plants less than 1m girth and and dispoing off debris away from the work site by mechnical / manual means with all leads, lifts, delifts,labour, T&P Cess, etc.complete with all costs incidenal to the work and as per the specification and direction of Engineer-in-Charge complete. | 5,85,000 | sqm | 0.2 | ₹1,17,000 |
| 1.02 | Traingular or square section of 0.15m Trench cutting for allignment and demarcation purpose of dug belling 10 cm to 15cm etc. all complete as per the direction of Engineer-in-Charge. | 22,000 | Rmt | 5.9 | ₹1,29,800 |
| 1.03 | Excavation for base stripping in both dry/ wet condition, loading, unloading and carriage by manual / mechanical means of all kinds of soil, including stony earth, gravel and moorum etc inter spread with boulders up to 1/2 cum size stump removal, removing the excavated materials, debris away from the work site with all leads, lifts, delifts and depositing the excavated materials in the embankment/ spoil banks or any other specified space in layers not exceeding 22.50cm in depth , spreading and levelling to required profile by manual / mechanical means with loading, unloading, re-handling with cost of all materials and labour charges complete including dressing, levelling & trimming of bed & slope to required profile with all leads , lifts and delifts including illumination of site and haul roads, mobilisation, demobilisation, approach road,, diversion road including all cost & conveyance of materials, labour, hire & running charges of machinery and equipment involve for the completion of the item of the work complete and cess, levies as fixed by the Govt. from time to time, as per the design, drawing , Technical Specification and direction of the Engineer-in-charge. | 18,619.55 | cum | 171.2 | ₹31,87,666.96 |
| 1.04 | Excavation of canal in both dry/ wet and submersed condition, loading, unloading and carriage by manual / mechanical means of all kinds of soil, including stony earth, gravel and moorum etc inter spread with boulders up to 1/2 cum size including jungle clearance, stump removal, shoring, shuttering, propping bullahs, dewatering if necessary, removing the excavated materials, debris away from the work site with all leads, lifts, delifts and depositing the excavated materials in the embankment/ spoil banks or any other specified space in layers not exceeding 22.50cm in depth , spreading and levelling to required profile by manual / mechanical means with loading, unloading, re-handling including dressing, levelling & trimming of bed & slope to required profile with all leads, lifts and delifts with all cost of materials and labour complete including illumination of site and haul roads, mobilisation, demobilisation, approach road, diversion road including all cost & conveyance of materials, labour, hire & running charges of machinery and equipment involve for the completion of the item of the work complete and cess, levies as fixed by the Govt. from time to time, as per the design, drawing , Technical Specification and direction of the Engineer-in-charge. | 1,30,787.73 | cum | 47.4 | ₹61,99,338.54 |
| 1.05 | Excavation of canal in both dry/ wet and submersed condition, loading, unloading and carriage by manual / mechanical means Dis-Integrated Rocks, disintegrated sand stone which are not requiring blasting inter spread with boulders, shoring, shuttering, propping bullahs, removing the excavated materials, debris away from the work site with all leads, lifts, delifts and depositing the excavated materials in the embankment/ spoil banks or any other specified space in layers not exceeding 22.50cm in depth, spreading and levelling to required profile by manual / mechanical means with loading, unloading, re-handling including dressing, levelling & trimming of bed & slope to required profile with all leads, lifts and delifts with all cost of materials and labour complete including illumination of site and haul roads, mobilisation, demobilisation, approach road, diversion road including all cost & conveyance of materials, labour, hire & running charges of machinery and equipment involve for the completion of the item of work and cess, levies as fixed by the Govt. from time to time, as per the design, drawing, Technical Specification and direction of the Engineer-in-charge. | 1,59,733.98 | cum | 60.9 | ₹97,27,799.5 |
| 1.06 | Excavation of canal in both dry/wet/submerged condition in Medium Hard Rock/ compact laterite sheet rock and Sand stone of all toughness by rock breaker/blasting in dry/wet/submerged condition with explosives, fuse coils, detonators with all accessories including construction and maintenance of coffer dam till completion of work and subsequent removal at appropriate time including dewatering if necessary and dressing, levelling the canal slopes and bed by manual/mechanical means as per approved section and removing and dumping the blasted rocks and debris with all leads, lifts, de-lifts, loading, unloading, handling, re-handling and all cost for mobilisation, de-mobilisation, approach road, diversion road including all cost & conveyance of materials, labour, hire & running charges of machinery and equipment involve for the completion of the item of work and cess, levies as fixed by the Govt. from time to time, as per the design, drawing, Technical Specification and direction of the Engineer-in-charge. | 2,82,955.5 | cum | 265.4 | ₹7,50,96,388.37 |
| 1.07 | Excavation of canal in both dry/ wet & submersed condition, loading, unloading and carriage by manual / mechanical means Hard Rocks of all toughness by mechanical drilling and appropriate blasting with explosives, fuse coils, detonators with all accessories including construction and maintenance of coffer dam till completion of work and subsequent removal at appropriate time including dewatering, removing the excavated rocks, debris away from the work site and stacking the useful rocks in regular stacks with all leads, lifts, delifts in the spoil banks or any other specified space to required profile by manual / mechanical means with loading, unloading, re-handling including dressing, levelling & trimming of bed & slope to required profile with all leads, lifts and delifts including illumination of site and haul roads, mobilisation, demobilisation, approach road, diversion road including all cost & conveyance of materials, labour, hire & running charges of machinery and equipment involve for the completion of the item of work and cess, levies as fixed by the Govt. from time to time, as per the design, drawing, Technical Specification and direction of the Engineer-in-charge. (Minimum 70% of rock volume is to be stacked and taken into account. In case of change of recovery due to rock condition, percentage is to be fixed by Engineer in charge) | 34,323.78 | cum | 231.8 | ₹79,56,251.05 |
| 1.08 | Earth work in canal embankment including specified approved section for all heights using approved earth excavated by mechanical/ manual means from approved borrow area including loading in to transportation vehicles , transportation by mechanical/ manual means and unloading the earth in canal embankment on properly prepared and scientifically approved surface with all leads , lifts and delifts including spreading and levelling the earth in layers not exceeding 30 cm in depth, removing the undesirable materials, breaking clods to maximum 5cm to 7cm size, watering of borrow areas including cutting previously compacted country side slopes to design section to receive turfing and utilising the cutting earth in design canal section complete with all cost of borrowed earth and labour complete including illumination of site and haul roads & borrow area, mobilisation, demobilisation, approach road, diversion road including all cost, royalty of earth & conveyance of materials, labour, hire & running charges of machinery and equipment involve for the completion of the item of the work complete and cess, levies as fixed by the Govt. from time to time, as per the design, drawing, Technical Specification and direction of the Engineer-in-charge. | 44,943.58 | cum | 107 | ₹48,08,963.49 |
| 1.09 | Watering, rolling and compacting by vibratory roller or any other mechanical means the earthwork in layers not exceeding 22.50 cm after compaction in depth in canal embankment fill of all heights with all leads, lifts, delifts including specified approved section at optimum moisture content (OMC) to achieve the required compaction dry density(95%) of the proctor density determined earlier by laboratory test of borrowed earth including illumination of site and haul roads & borrow area, mobilisation, demobilisation, approach road, diversion road including all cost & conveyance of materials, labour, hire & running charges of machinery and equipment involve for the completion of the item of the work complete and cess, levies as fixed by the Govt. from time to time, as per the design, drawing,Technical Specification and direction of the Engineer-in-charge. | 1,10,337.45 | cum | 35.7 | ₹39,39,046.97 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
DTCN_G_I_R.pdf
Tender Documents • 5.45 MB
BOQ_364425.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .