| 1 | L1₹2.4 CrAccepted-AOC T 3 PARMESHWARI BLDG CHATRIBARI RD GUWAHATI ASSAM 781001 | KAMRUP METRO | ASSAM | 781001 | ₹2.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.6 Cr+₹22.9 L (9.52%)Rejected-Finance | ₹2.6 Cr+₹22.9 L (9.52%) | L2 | Rejected-Finance L2 |
| 3 | L3₹2.7 Cr+₹31.1 L (12.9%)Rejected-Finance 184 NEAR GOODWAY TAILORS PRITHVIPURA RASAL ROAD BRIDGE JODHPUR RAJASTHAN 342006 | JODHPUR | RAJASTHAN | 342006 | ₹2.7 Cr+₹31.1 L (12.9%) | L3 | Rejected-Finance L3 |
| 4 | L4₹2.9 Cr+₹50.9 L (21.1%)Rejected-Finance JATIA GUWAHATI | GUWAHATI | ₹2.9 Cr+₹50.9 L (21.1%) | L4 | Rejected-Finance L4 |
| 5 | Rejected-Technical GODREJ GENESIS BUILDING UNIT NO 609 PLOT NO XI 6TH FLOOR BLOCK EP GP SECTOR V SALT LAKE KOLKATA 700091 | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | - | - | Rejected-Technical tECHNICALLY NON RESPONSIVE |
Tender Value
Refer Docs
EMD Value
₹4.7 L
Closing Date
30 May 2022, 2:00 pmClosed
CGM PPD
Bijulee Bhawan, Paltan Bazar
Turnkey Construction of a 132kV N.F. Railway Traction Bay and a Bus PT Nay at 132kV Rowta GSS, AEGCL including Supply of Bay Equipment and line bay materials and associated works etc
2022_AEGCL_25472_1
aegclMDROWTA
Open Tender
Electrical Works
Turn-key
210 days
Rowta
Please refer Tender documents.
8 documents required · 8 mandatory
₹5,000
₹4.7 L
14 Jul 2022
10 May 2022
31 May 2022
10 May 2022
30 May 2022
10 May 2022
Amount
Circuit Breakers with mounting structures and terminal connectors etc.as applicable as per specification
132 kV Gang operated SF6 Breakers
SIEMENS made Control & Relay Panel with Automation (Simplex Type) complete with BCU, ethernet switch and all accessories as required for SAS integration.
For 132 kV Feeder Capable of integration into Existing SAS at Rowta GSS
Current Transformers (1-phase) with terminal connectors etc. as per specification
132 kV, 400-200/1-1-1 Line CT
Isolators with insulators, terminal connectors, structures complete etc. as per specification
132 kV With Single Earth Switch
132 kV Without Earth Switch
Lightning Arrester with terminal connectors etc. as per specification
132 kV Lightning Arrester
Post Insulator with terminal connectors etc. as per specification
132 kV Post Insulator
132 kV CVT with terminal connectors etc as per specfication.
Supply of Mounting structures with mounting & foundation bolts as per drawings supplied for
132 kV Line CT
132kV Isolator With Single Earth Switch
132kV Isolator Without Earth Switch
132kV Lightning Arrester
132kV Post Insulator
132kV CVT
Supply and Design of Bay Steel Structures except equipment mounting structures
Column
Type 'C1' ( 4 Nos.) [ 2317.41 Kg/ per Column ]
Beams
Beam Type 'B1' ( 2 Nos.) [ 751.77 Kg/ per Beam ]
Supply of AL Power Cables
Supply of Cu Control Cables
Supply of ACSR panther Conductor
Disc Insulator Strings complete with all hardware fittings, clamps etc. for
10 Disc Tension Insulator String
9 Disc Suspension Insulator String
Supply of Earthing System Materials
Main Earth mat (65 x 12 mm GI Flat)
65x12 GI flat for risers, equipment earthing, column earthing etc.
50x6 GI flat Earthing conductor for earthing of indoor L.T & control panels, Junction box, Marshalling boxes, cable trenches etc.
40 mm Dia. 3mtr long M.S. rod earth electrode (driven) with test link for each tower with earth peak, LAs & CVTs.
7/3 66 mm GI wire for shielding and down wires for earthing shielding works/ lighting spikes
Supply of Bay Marshalling Kiosk along with mounting structure
Clamps and Connectors
PG Clamp With Connectors and all hardware fittings sutiable for ACSR Panther Conductor
T Clamp suitable for twin ACSR Zebra Conductor to single ACSR Panther
Dove Clamp for shield wire with connectors
Supply of ABT meter as per specification
Mandatory Spares
For 132 kV SF6 Circuit Breakers
Interrupter
Tripping Coil
Closing Coil
SF6 gas filled cylinder-12kg
For Control & Relay panels
Over current/Earth fault relay
Distance protection Relay
Master Trip Relay
132kV Lightning Arrester
132kV , 400-200/1-1-1 Line CT
132kV, isolator moving and fixed contact
Terminal connectors for 132kV CT
Terminal connectors for 132kV isolator
T Clamp suitable for twin ACSR Zebra to Single ACSR Panther Conductor
Fire Fighting equipments
25 Kg Capacity FE DCP type, trolley mounted
FE CO2 6.5 kg capacity, wall mounted
Fire Buckets (12 Nos. with stand in one set)
Supply of 110 Volt Battery Bank, charger, DCDB & 415 V ACDB as per specifications
Supply of 110 Volt VRLA Battery bank with battery stand and all other fittings and accessories as per specification
Supply of 110 Volt Battery charger with all fittings and accessories as per specification
Supply of 110 Volt DC DB
Supply of 415 Volt ACDB
Description of Work / Item(s)
Amount
Circuit Breakers with mounting structures and terminal connectors etc.as applicable as per specification
132 kV Gang operated SF6 Breakers
SIEMENS made Control & Relay Panel with Automation (Simplex Type) complete with BCU, ethernet switch and all accessories as required for SAS integration.
For 132 kV Feeder Capable of integration into Existing SAS at Rowta GSS
Current Transformers (1-phase) with terminal connectors etc. as per specification
132 kV, 400-200/1-1-1 Line CT
Isolators with insulators, terminal connectors, structures complete etc. as per specification
132 kV With Single Earth Switch
132 kV Without Earth Switch
Lightning Arrester with terminal connectors etc. as per specification
132 kV Lightning Arrester
Post Insulator with terminal connectors etc. as per specification
132 kV Post Insulator
132 kV CVT with terminal connectors etc as per specfication.
Supply of Mounting structures with mounting & foundation bolts as per drawings supplied for
132 kV Line CT
132kV Isolator With Single Earth Switch
132kV Isolator Without Earth Switch
132kV Lightning Arrester
132kV Post Insulator
132kV CVT
Supply and Design of Bay Steel Structures except equipment mounting structures
Column
Type 'C1' ( 4 Nos.) [ 2317.41 Kg/ per Column ]
Beams
Beam Type 'B1' ( 2 Nos.) [ 751.77 Kg/ per Beam ]
Supply of AL Power Cables
Supply of Cu Control Cables
Supply of ACSR panther Conductor
Disc Insulator Strings complete with all hardware fittings, clamps etc. for
10 Disc Tension Insulator String
9 Disc Suspension Insulator String
Supply of Earthing System Materials
Main Earth mat (65 x 12 mm GI Flat)
65x12 GI flat for risers, equipment earthing, column earthing etc.
50x6 GI flat Earthing conductor for earthing of indoor L.T & control panels, Junction box, Marshalling boxes, cable trenches etc.
40 mm Dia. 3mtr long M.S. rod earth electrode (driven) with test link for each tower with earth peak, LAs & CVTs.
7/3 66 mm GI wire for shielding and down wires for earthing shielding works/ lighting spikes
Supply of Bay Marshalling Kiosk along with mounting structure
Clamps and Connectors
PG Clamp With Connectors and all hardware fittings sutiable for ACSR Panther Conductor
T Clamp suitable for twin ACSR Zebra Conductor to single ACSR Panther
Dove Clamp for shield wire with connectors
Supply of ABT meter as per specification
Mandatory Spares
For 132 kV SF6 Circuit Breakers
Interrupter
Tripping Coil
Closing Coil
SF6 gas filled cylinder-12kg
For Control & Relay panels
Over current/Earth fault relay
Distance protection Relay
Master Trip Relay
132kV Lightning Arrester
132kV , 400-200/1-1-1 Line CT
132kV, isolator moving and fixed contact
Terminal connectors for 132kV CT
Terminal connectors for 132kV isolator
T Clamp suitable for twin ACSR Zebra to Single ACSR Panther Conductor
Fire Fighting equipments
25 Kg Capacity FE DCP type, trolley mounted
FE CO2 6.5 kg capacity, wall mounted
Fire Buckets (12 Nos. with stand in one set)
Supply of 110 Volt Battery Bank, charger, DCDB & 415 V ACDB as per specifications
Supply of 110 Volt VRLA Battery bank with battery stand and all other fittings and accessories as per specification
Supply of 110 Volt Battery charger with all fittings and accessories as per specification
Supply of 110 Volt DC DB
Supply of 415 Volt ACDB
Description of Work / Item(s)
Amount
Erection, testing & commissioning of Circuit Breakers including laying & terminating of LT power and control cables as required
132 kV Gang operated SF6 Breakers
Erection, testing & commissioning of Control & Relay Panels including laying & terminating of LT power and control cables as required
For 132 kV Feeder compatible with existing SAS (SIEMENS) at Rowta GSS
Erection, testing & commissioning of Current transformers including laying & terminating of control cables as required
132 kV, 400-200/1-1-1 Line CT including marshalling box
Erection, testing & commissioning of Isolators including laying & terminating of LT power and control cables as required
132 kV With Single Earth Switch
132 kV Without Earth Switch
Erection, testing & commissioning of Lightning Arrester including including laying & terminating of control cables as required
132 kV Lightning Arrester
Erection, testing & commissioning of Post Insulator including including laying & terminating of control cables as required
132 kV Post Insulator
Erection, testing & commissioning of CVT including including laying & terminating of control cables as required
132kV CVT including marshalling box
Erection of Mounting structures for different terminal equipments as required for
132 kV Line CT
132kV Isolator With Single Earth Switch
132kV Isolator Without Earth Switch
132kV Lightning Arrester
132kV Post Insulator
132kV CVT
Integration of Control Relay Panel into the existing Substation Automation System (SAS) of SIEMENS made at Rowta GSS.
Installation of earthing system with GI flats, electrodes etc. For present scope of area
Construction of Cable Trenches including supply of all materials and labour as per specification and drawing
B Type Trench
C Type Trench
Illumination
Design and installation of outdoor illumination system for the 132kV bay area (consisting of minimum 6 Nos. of LED lamps with fittings etc.) as per specification including supply of all materials.
Erection of Bay Marshalling Kiosk as per drawings and specifications including construction of foundation inclusive of supply of all foundation Materials and Labour as directed.
Erection, testing and Commissssioning of ABT Meter as per specification
Erection, testing & commissioning of 110 Volt DCDB & 415 V ACDB
Erection, testing & commissioning of 110 Volt DC charger
Erection, testing & commissioning of 110 Volt DC battery bank
Erection, testing & commissioning of 110 Volt DCDB
Erection, testing & commissioning of 415 V ACDB
Switchyard PCC & gravelling
Providing 80mm thick 1:4:8 PCC base of switchyard as per specification & drawings including supply of all materials.
Providing 100mm thick graveling of switchyard as per specification & drawings including supply of all materials.
Hoisting of Insulator strings, Stringing of Conductors, GI shield wire etc including supply of disc insulator strings, clamps, GI stranded shield wire, connectors etc. As required for whole scope of works
Erection of Switchyard Lattice Steel Structure
Column
Type 'C1' ( 4 Nos.) [ 2317.41 Kg/ per Column ]
Beams
Beam Type 'B1' ( 2 Nos.) [ 751.77 Kg/ per Beam ]
Dismantling of existing structures including foundation
Construction of KIOSK building & related services
Construction of KIOSK Type- A building with all required services (4.00 x 5.50 m) with supply of all materials equipments as per drawing & specification
Description of Work / Item(s)
Amount
Construction of Foundation Including. Supply of All Foundation Materials & Labour as required for 132kV Circuit Breaker (1 Set)
Excavation (16.21 Cum per breaker)
Filling (10.73 Cum per breaker)
Brick Soiling (8 Sq.m per breaker)
Formwork (15.36 Sq.m per breaker)
PCC (0.46 Cum per breaker)
RCC (4.22 Cum per breaker)
Reinforcement (209.75 Kg per breaker)
Construction of Foundation Including. Supply of All Foundation Materials & Labour as required for 132kV Current Transformer ( 3 Nos.)
Excavation (4.29 Cum per CT)
Filling (3.48 Cum per CT)
Brick Soiling (1.82 Sq.m per CT)
Formwork (6.56 Sq.m per CT)
PCC (0.10 Cum per CT)
RCC (0.52 Cum per CT)
Reinforcement (86.18 Kg per CT)
Construction of Foundation Including. Supply of All Foundation Materials & Labour as required for 132kV CVT (3 Nos.)
Excavation (4.29 Cum per CT)
Filling (3.48 Cum per CT)
Brick Soiling (1.82 Sq.m per CT)
Formwork (6.56 Sq.m per CT)
PCC (0.10 Cum per CT)
RCC (0.52 Cum per CT)
Reinforcement (86.18 Kg per CT)
Construction of Foundation Including. Supply of All Foundation Materials & Labour as required for 132kV Isolators With/ Without Earth Switch isolator( 2 Sets)
Excavation (25.13 Cum per Isolator)
Filling (20.40 Cum per Isolator)
Brick Soiling (11.81 Sq.m per Isolator)
Formwork (16.11 Sq.m per Isolator)
PCC (0.72 Cum per Isolator)
RCC (2.83 Cum per Isolator)
Reinforcement (246.07 Kg per Isolator)
Construction of Foundation Including. Supply of All Foundation Materials & Labour as required for 132kV Lightning Arresters( 3 Nos)
Excavation (3.52 Cum per LA)
Filling (2.75 Cum per LA)
Brick Soiling (1.56 Sq.m per LA)
Formwork (3.88 Sq.m per LA)
PCC (0.08 Cum per LA)
RCC (0.54 Cum per LA)
Reinforcement (46.65 Kg per LA)
Construction of Foundation Including. Supply of All Foundation Materials & Labour as required for 132kV Post Insulator ( 6 Nos)
Excavation (3.52 Cum per pi)
Filling (2.75 Cum per PI)
Brick Soiling (1.56 Sq.m per PI)
Formwork (3.88 Sq.m per PI)
PCC (0.08 Cum per PI)
RCC (0.54 Cum per PI)
Reinforcement (46.65 Kg per PI)
Construction of Foundation Including. Supply of All Foundation Materials & Labour as required for Lattice Steel Column ( Column Type (C1), 4 Nos.)
Excavation (110.55 Cum per coulmn)
Filling (97.229 Cum per coulmn)
Brick Soiling (25.5 Sq.m per coulmn)
Formwork (23.96 Sq.m per coulmn)
PCC ( 1.79Cum per coulmn)
RCC (8.59.Cum per coulmn)
Reinforcement (855.89 Kg per coulmn)
Description of Work / Item(s)
Amount
Potential Transformers (1-phase) with terminal connectors etc. as per specification
145 KV, 1-ph, Potential Transformer (PT) on BUS (132kV/√3/110/√3/110/√3V110/√3V) as per the technical specification along with a marshaling box
Isolators with insulators, terminal connectors, structures complete etc. as per specification
132 kV Without Earth Switch
Post Insulator with terminal connectors etc. as per specification
132 kV Post Insulator
Supply of Mounting structures with mounting & foundation bolts as per drawings supplied for
132 kV Bus PT
132kV Isolator Without Earth Switch
132kV Post Insulator
Supply of Al Power Cables
Supply of Cu Control Cables
Supply of ACSR Panther Conductor
Supply of Earthing System Materials
Main Earth Mat (65 x 12 mm GI Flat)
65x12 GI flat for risers, equipment earthing, column earthing etc.
50x6 GI flat Earthing conductor for earthing of indoor L.T & control panels, Junction box, Marshalling boxes, cable trenches etc.
40 mm Dia. 3mtr long M.S. rod earth electrode (driven) with test link for each tower with earth peak, LAs & CVTs.
Clamps and Connectors
T Clamp with connectors and all hardware fittings suitable for twin ACSR zebra to single panther Conductor
33 KV XLPE cable
33 kV 1-core, 100 sq. mm, XLPE cable of circular AI semiconductor, etruded XLPE insulated with semi conducting compounded insulation. Semi-Conducting tepe metallic shield with annealed plain copper wires, cooper tape screen, outer sheath with extruded PVC tape ST-2 conforming to IS-7098(Pt-II)/1985 of Make KE/Havells/or equivalent
33 kV cable termination kit for XPLE, 1 Core, outdoor type
Mandatory Spares
Terminal connectors for 132 kV Isolator
T Clamp suitable for twin ACSR Zebra to Single ACSR Panther Conductor
Fire Fighting equipments
25 KG Capacity FE DCP type, trolley mounted
FE CO2 6.5 KG Capacity, Wall mounted
Fire Buckets (12 Nos. with stand in one set)
Description of Work / Item(s)
Amount
Potential Transformers (1-phase) with terminal connectors etc. as per specification
145 KV, 1-ph, Potential Transformer (PT) on BUS (132kV/√3/110/√3/110/√3V110/√3V) as per the technical specification along with a marshaling box
Isolators with insulators, terminal connectors, structures complete etc. as per specification
132 kV Without Earth Switch
Post Insulator with terminal connectors etc. as per specification
132 kV Post Insulator
Supply of Mounting structures with mounting & foundation bolts as per drawings supplied for
132 kV Bus PT
132kV Isolator Without Earth Switch
132kV Post Insulator
Supply of Al Power Cables
Supply of Cu Control Cables
Supply of ACSR Panther Conductor
Supply of Earthing System Materials
Main Earth Mat (65 x 12 mm GI Flat)
65x12 GI flat for risers, equipment earthing, column earthing etc.
50x6 GI flat Earthing conductor for earthing of indoor L.T & control panels, Junction box, Marshalling boxes, cable trenches etc.
40 mm Dia. 3mtr long M.S. rod earth electrode (driven) with test link for each tower with earth peak, LAs & CVTs.
Clamps and Connectors
T Clamp with connectors and all hardware fittings suitable for twin ACSR zebra to single panther Conductor
33 KV XLPE cable
33 kV 1-core, 100 sq. mm, XLPE cable of circular AI semiconductor, etruded XLPE insulated with semi conducting compounded insulation. Semi-Conducting tepe metallic shield with annealed plain copper wires, cooper tape screen, outer sheath with extruded PVC tape ST-2 conforming to IS-7098(Pt-II)/1985 of Make KE/Havells/or equivalent
33 kV cable termination kit for XPLE, 1 Core, outdoor type
Mandatory Spares
Terminal connectors for 132 kV Isolator
T Clamp suitable for twin ACSR Zebra to Single ACSR Panther Conductor
Fire Fighting equipments
25 KG Capacity FE DCP type, trolley mounted
FE CO2 6.5 KG Capacity, Wall mounted
Fire Buckets (12 Nos. with stand in one set)
Description of Work / Item(s)
Amount
Erection, testing & commissioning of Potential Transformer including laying & terminating of LT power and control cables as required
132 kV Bus PT including marshelling box
Erection, testing & commissioning of Isolators including laying & terminating of LT power and control cables as required
132 kV Without Earth Switch
Erection, testing & commissioning of Post Insulator including including laying & terminating of control cables as required
132 kV Post Insulator
Erection of Mounting structures for different terminal equipments as required for
132 kV Bus PT
132kV Isolator Without Earth Switch
132kV Post Insulator
Hoisting of Insulator strings, Stringing of Conductors, GI shield wire etc including supply of disc insulator strings, clamps, GI stranded shield wire, connectors etc. As required for whole scope of works
Providing 80mm thick 1:4:8 PCC base of switchyard as per specification & drawings including supply of all materials.
Providing 100mm thick graveling of switchyard as per specification & drawings including supply of all materials.
Installation of earthing system with GI flats, electrodes etc. For present scope of area
Construction of Cable Trenches including supply of all materials and labour as per specification and drawing
C Type Trench (800 x 1350 mm)
Underground cable trench for 33 kV XLPE cable
Destringing of existing overhead conductor of 33 kV Azure Power feeder and replacement with 33 kV XLPE cable including installation of termination kit
Description of Work / Item(s)
Amount
Construction of Foundation Including. Supply of All Foundation Materials & Labour as required for 132kV Potential Transformers (3 Nos.)
Excavation (4.29 Cum per PT)
Filling (3.48 Cum per PT)
Brick Soiling (1.82 sq.m per PT)
Formwork (6.56 Sq.m per PT)
PCC (0.10 Cum per PT)
RCC (0.52 Cum per PT)
Reinforcement (86.18 Kg per PT)
Construction of Foundation Including. Supply of All Foundation Materials & Labour as required for 132kV Isolators With/ Without Earth Switch/Tandem ( 1 Sets)
Excavation (25.13 Cum per Isolator)
Filling (20.40 Cum per Isolator)
Brick Soiling (11.81 Sq.m per Isolator)
Formwork (16.11 Sq.m per Isolator)
PCC (0.72 Cum per Isolator)
RCC (2.83 Cum per Isolator)
Reinforcement (246.07 Kg per Isolator)
Construction of Foundation Including. Supply of All Foundation Materials & Labour as required for 132kV Post Insulator ( 3 Nos)
Excavation (3.52 Cum per PI)
Filling (2.75 Cum per PI)
Brick Soiling (1.56 Sq.m per PI)
Formwork (3.88 Sq.m per PI)
PCC (0.08 Cum per PI)
RCC (0.54 Cum per PI)
Reinforcement (46.65 Kg per PI)
HI-TECH CORPORATION
M/S U.K. ENTERPRISE
OK Enterprise
OK Enterprise
T N T Projects Ltd
HI-TECH CORPORATION
M/S U.K. ENTERPRISE
OK Enterprise
HI-TECH CORPORATION
M/S U.K. ENTERPRISE
T N T Projects Ltd
HI-TECH CORPORATION
T N T Projects Ltd
M/S U.K. ENTERPRISE
OK Enterprise
OK Enterprise
T N T Projects Ltd
HI-TECH CORPORATION
M/S U.K. ENTERPRISE
T N T Projects Ltd
HI-TECH CORPORATION
OK Enterprise
T N T Projects Ltd
HI-TECH CORPORATION
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .