Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹28.9 L+₹15,256.27 (0.53%)Rejected-AOC MANIKETTY HOUSE NELLIYANKAD CHITTUR PALAKKAD 678101 | CHITTUR | PALAKKAD | KERALA | 678101 | L2 | Rejected-AOC L2 | |
| 3 | L3₹30.4 L+₹1.7 L (5.84%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹30.8 L+₹2.0 L (7.06%)Rejected-AOC VADAVANUR GP 30 LAKHS LAC ADS NENMMARA 2024 25 MAZHOORKKAVU PERUNCHIRA ROAD IN VADAVANUR GP 30 LAKHS GENERAL CIVIL WORK | VELLORE | TAMIL NADU | 632001 | L4 | Rejected-AOC L4 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
7 Jan 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, MI Division, Palakkad
Executive Engineer, MI Division, Palakkad
Improvements to Vinayakarkulam (Thenakulam) in Kozhinjampara Panchayath in Palakkad District.
2020_Irrig_392887_2
45/ET/EE/MI/PKD/2020-2021
Open Tender
Civil Works - Others
Item Rate
270 days
Kozhinjampara
Please refer Tender documents.
6 documents required · 6 mandatory
₹3,095
Yes
₹50,000
Yes
20 Feb 2021
29 Dec 2020
13 Jan 2021
30 Dec 2020
7 Jan 2021
30 Dec 2020
30 Dec 2020 - 2 Jan 2021
60 days
Amount
Renovation of pond
2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od23362/2020_2021/IA : Earth work excavation in all class of soil as per item No 2.6.1, the earth conveyed from site by contractor.
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
od23364/2020_2021/IA : Providing and laying 300 mm Dia RCC pipe to lines and levels in canal,outlet and inlet of ponds for smooth Conveyance of Irrigation water.
od28154/2020_2021/IA : od59934/2019_2020/IA :Supplying and installation of Water scale (ISA65X65X6) by connecting three bars ofGI Pipe of 50mm ,in builted into 60X60X40 CC of 1:3:6 in water body for measuring of water level and fixingdisplay board of size 100X70 cm supported on 50mm GI Pipe which is in built at 45X45X60 concrete block of1:3:6 near pond to calculate volume of water, as per departmental officer's at site.Earth work- 60X60X40cm0.6*0.6*0.4=0.144 say 0.150.45*0.45*0.6=0.1215,say 0.15total =0.3 cumconcrete 1:3:6=0.15+0.15=0.3GI Pipe for supporting member L=0.3+0.9+1.05+1.05=3.3add 5% wastage=0.163total L=3.465 say 3.5 and0.2+1.00+0.7=1.9,add 5% wastage 0.095,total=1.995,say 2mnet total=3.5+2=5.5for 25mm GI pipe,Q=1+1+0.7+0.7=3.4,add 5% wastage=0.17,total=3.57,say 4mGalvanised steel plain sheet (18 guage)size of sheet 1.00X0.7volume of 18 guage GI sheet 10.5 kg/sqm)volume=1.00*0.7*10.5 kg/sqm)=7.35,add 5% wastage=0.37,total=7.72,say 7.8 kgMS angle 65X65X6mmQ=2m,add 5% wastage =0.1m,total=2.1mwt of 6mm MS angle =5.95kg/m,total=5.95*2.1=12.495,say12.5kgPainting:-GI pipe 50mm (3.3*22/7*0.0483=0.5 sqm),area of angle iron=4*0.65*2=5.2,total=0.5+5.2=5.7 say 6 sqmGI pipe 50mm, (1.9*22/7*0.0483=0.29 sqm)GI pipoe 25mm (3.4*22/7*0.0483=0.52 sqm)GI sheet 18 guage(2*1*0.7*1=1.4 sqm
Bathing Ghats
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
MURALEEDHARAN.M
BINESH M
SOORAJ K / AQUA FARMS
Bidder Name
RAMAKRISHNAN. K
MURALEEDHARAN.M
SOORAJ K / AQUA FARMS
BINESH M
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_572984.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .