| 1 | L1₹22.4 LAccepted-AOC | L1 | Accepted-AOC lowest bidder | |
| 2 | L2₹23.8 L+₹1.4 L (6.04%)Rejected-AOC | L2 | Rejected-AOC second lowest bidder | |
| 3 | Rejected-Technical | - | Rejected-Technical other than first and second bidder | |
| 4 | Rejected-Technical | - | Rejected-Technical other than first and second bidder | |
| 5 | Rejected-Technical | - | Rejected-Technical other than first and second bidder |
| Sl No | Description | Qty | Unit | JAISON JOSEPH L4 | K. MANOHARAN L1 | T. RATHNAKARAN L4 | JOLLY THOMAS L2 | SIBIN.T.K. L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00Pond | ||||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 116.93 | cum | 240.45 ₹28,115.58 | 214.96 ₹25,135.06 Lowest | 240.45 ₹28,115.58 | 227.94 ₹26,652.8 | 215 ₹25,139.74 |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 70.24 | cum | 122.28 ₹8,589.19 | 109.32 ₹7,678.86 Lowest | 122.28 ₹8,589.19 | 115.94 ₹8,143.86 | 120 ₹8,429.04 |
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 48 | hour | 322.5 ₹15,480 | 288.32 ₹13,839.36 Lowest | 322.5 ₹15,480 | 305.73 ₹14,675.04 | 316 ₹15,168 |
| 1.00 | OD340929/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 67.67 | cum | 3,727.23 ₹2,52,203.02 | 3,332.14 ₹2,25,469.25 Lowest | 3,727.23 ₹2,52,203.02 | 3,533.41 ₹2,39,088.19 | 3,680 ₹2,49,007.2 |
| 1.00 | OD340930/2025-2026:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 15.68 | cum | 2,769.38 ₹43,434.96 | 2,475.83 ₹38,830.92 Lowest | 2,769.38 ₹43,434.96 | 2,625.37 ₹41,176.3 | 2,730 ₹42,817.32 |
| 1.01 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 40 mm nominal size derived from natural sources) | 5.51 | cum | 7,806.93 ₹43,031.8 | 6,979.4 ₹38,470.45 Lowest | 7,806.93 ₹43,031.8 | 7,400.97 ₹40,794.15 | 7,680 ₹42,332.16 |
| 1.01 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 29.45 | cum | 9,299.67 ₹2,73,847.38 | 8,313.91 ₹2,44,819.71 Lowest | 9,299.67 ₹2,73,847.38 | 8,816.09 ₹2,59,607.4 | 9,150 ₹2,69,440.05 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 38.78 | sqm | 360.41 ₹13,976.7 | 322.21 ₹12,495.3 Lowest | 360.41 ₹13,976.7 | 341.66 ₹13,249.57 | 360 ₹13,960.8 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,766.82 | kilogram | 104.93 ₹1,85,392.42 | 93.81 ₹1,65,745.38 Lowest | 104.93 ₹1,85,392.42 | 99.47 ₹1,75,745.59 | 104 ₹1,83,749.28 |
Tender Value
₹25.1 L
EMD Value
₹50,000
Closing Date
4 Nov 2025, 5:00 pmClosed
Neethu Gangadharan
LIDEW Vengad GP
Annual Plan-Vengad GP Project No 359/2025-26-COMPLETION WORKS OF KUNNIRIKKA TEMPLE POND
2025_LSGD_815253_36
03/2025-26/AE/LIDEW/VGD/3PHASE
Open Tender
Civil Works - Buildings
Item Rate
Vengad GP
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,760
Yes
₹50,000
Yes
2 May 2026
28 Oct 2025
5 Nov 2025
28 Oct 2025
4 Nov 2025
28 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1366937.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.25 MB
BOQ_1366937.xls
BOQ • 0.31 MB
sbd1.pdf
Tender Documents • 0.95 MB
afdvt1.pdf
Tender Documents • 0.24 MB
pa1.pdf
Tender Documents • 0.26 MB
fot1.pdf
Tender Documents • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .