Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.6 LAdmitted-Finance | -23.11% | ₹6.6 L | L1 | Admitted-Finance |
| 2 | L2₹7.7 L+₹1.1 L (16.4%)Admitted-Finance | -10.51% | ₹7.7 L+₹1.1 L (16.4%) | L2 | Admitted-Finance |
Tender Value
₹8.6 L
EMD Value
₹17,185
Closing Date
22 Jul 2026, 6:00 pmClosed
XEN
Nowshera
Shifting of utility upgradation of road from NH144A to Hanjana bridge at Nowshera. (Deposit work)
2026_PHE_314503_2
e-NIT No. 07 of 2026-27
Open Tender
Civil Works
Percentage
30 days
Nowshera
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
XEN
₹17,185
Yes
29 Aug 2026
3 Jul 2026
23 Jul 2026
3 Jul 2026
22 Jul 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed: All kind of soil. | 321.95 | cum | 479.3 | ₹1,54,310.64 |
| 2 | Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/by mechanical means
including stacking of pipes within 50 meters lead as per direction of Engineer-in-charge :
15 mm to 40 mm nominal bore. | 350 | Mtr | 109.65 | ₹38,377.5 |
| 3 | Above 40 mm nominal bore. | 670 | Mtr | 121.65 | ₹81,505.5 |
| 4 | Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work)
a) 50mm dia | 400 | Mtr | 532.8 | ₹2,13,120 |
| 5 | b) 40mm dia | 250 | Mtr | 434.65 | ₹1,08,662.5 |
| 6 | c) 25mm dia | 200 | Mtr | 311.95 | ₹62,390 |
| 7 | d) 20mm dia | 100 | Mtr | 227.9 | ₹22,790 |
| 8 | e) 15mm dia | 250 | Mtr | 179.2 | ₹44,800 |
| 9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 289.75 | cum | 180.55 | ₹52,314.36 |
| 10 | Welding, including transportation of plant at site etc. complete
By electric plant | 1,000 | C.M | 6.2 | ₹6,200 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_1018274.xls
BOQ • 0.28 MB
Corrigendum02.pdf
PDF • 0.26 MB
Corrigendum.pdf
PDF • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .