Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
Closing Date
29 Jul 2024, 5:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Barrackpore Division
HINDUSTAN AERONAUTICS LIMITED Barrackpore Division Barrackpore Post Parganas (N) , Dist. 24 W. Bengal - 700 120 Phone : 2592-0157/2592-0163 Fax No : 91-033-2592-2379
FABRICATION OF SPARE PART 1 TYPE
8422
HAL/BKP/SC/2024-25/98461422/2
Works
Helicopter Complex -Barrackpore Divn
₹0
Exempted
29 Jul 2024
15 Jul 2024
15 Jul 2024
29 Jul 2024
ACCEPTANCE OF TERMS & CONDITIONS
Name Of the Sub-contractor:
Tender No.: HAL/BKP/SC/2024-25/98461422/2
Sl. No. Parameters HAL General Terms & Conditions Acceptable Yes / No If No, Reason for Non acceptance
1 Price a) Quotation should be on F.O.R. basis to H.A.L. Barrackpore Division, Barrackpore including Packing & forwarding/Freight up to delivery to Barrackpore Division stores.
b) Sub-contractor has to quote for complete machining & bending operations mentioned in the Master process sheet except Welding,heat treatment(annealing), NDT, protective finishing process like plating, painting, Stenciling etc. if any. Finishing operations like CAD plating, Anodising, painting, stenciling etc. and Welding if mentioned in the MPS will be carried out at HAL-BKP. The quotation submitted should be considering any special tooling cost and the value of scrap generated during fabrication/machining. The Scrap need not to return to HAL Barrackpore.
c) Prices are firm and fixed till the delivery of all items as per the order. Prices quoted should be inclusive of all taxes/GST and statuary duties. Taxes/GST, Duties OR any other Government/statutory levies should be clearly indicated separately. We do not issue Form ‘C’ / Form ‘D’ / Form 37. Bidder should invariably indicate the rate at which these are payable otherwise price quoted shall be considered to be inclusive of all the above elements. Any claim on the above by bidder subsequent to placement of order will not be entertained. If these elements appear in the quotation and there is revision in the applicabletaxes/GST rates, Duties or any other Government/statutory levies as per norms, the same will be honored as per prevaling rates at the time of delivery with respect to accepted & acknowledged delivery schedule.
d) Fabrication of items to be done with Raw Material supplied by HAL Barrackpore Division as per drawing and Master Process Sheets (MPS). Processes under external work centre (ES) except welding , plating/ surface treatment and heat treatment(annealing),are under vendor scope.
2 First Article Inspection (FAI) First article inspection requirement is to be met as per AFQMS, issue - II/AS9100D standard/CQAG 9002/AS9102 requirements. The requirements are as follows: 1. First article inspection shall be carried out by the subcontractor on the first production run of a new part to verify that the production processes, production documentation and tooling are capable of producing parts that meet requirements. The process shall be repeated when changes occur that invalidate the original results (e.g. engineering changes, manufacturing process changes, change of location, tooling changes). 2. The subcontractor shall maintain a first article inspection file for each part manufactured and the file shall contain the following: (i) Balloon marked identification (KPI) for each characteristics specified in the drawing. (ii) Dimensional inspection report as per Annexure – VII of CQAG 9002.
3 Delivery Schedule Delivery of First Off Sample (FOS) is required within 3 months from receipt of purchase order or issue of raw material or date of last technical input from HAL (excluding HAL in house operations if any) whichever is later. Remaining lot (in one or multiple batches) viz. production batch/Bulk to be delivered within 3 months from the date of issue of raw material or acceptance of FOS whichever is later (excluding HAL in house operations if any). However, The batch sizes will vary depending upon HAL production plan. Upon issue of raw material, if the date of submission of FOS (excluding HAL in house operations if any) is beyond FOS due date, the delivery schedule for production batch (Bulk) will be considered from FOS acceptance date.
4 Payment term 100% payment on acceptance of components & finalization of Receiving Report at HAL BKP stores.
5 Validity of offer The offers should be kept valid for our acceptance in all respects for a minimum period of 120 days from the date of opening of Tender.
6 Issue of material Raw materials in the form of Bars/Flats/Blocks/Sheets/Castings/Forgings will be issued by HAL Barrackpore Division Stores as Free Issue Material (FIM). Raw material will be issued after submission of Bank Guarantee, Indemnity Bond & Insurance as per order by the sub-contractor. Sending raw materials/semifinish parts (In case of multi stage items) to the sub-contractor is HAL responsibility by HAL cost whereas semifinished (In case of multi stage items)/finished items to be sent to HAL will be sub-contractor's responsibility by their own cost by Air/Courier/personel mode.
7 Packing, Forwarding and Transportation a) All parts(finished/semifinished) should be properly packed in separate bubble sheet and to be forwarded to HAL in a reliable transport mode to avoid damage during transit.
b) All the transportation from sub-contractor to Barrackpore Division of these parts (finished/semifinished) has to be borne by the sub-contractor. Whereas Transportation from HAL Barrackpore Division to sub-contractor will be born by HAL, which includes, receiving Raw materials from Barrackpore Divison stores, intermediate movement of semifinished parts etc. as applicable.
8 Tooling Price to be quoted inclusive of all type of tooling cost as required to fabricate the items. Any Special Tools and Gauges required will be not be supplied at all.
9 Prerequisites for Tender Acceptance The following documents to be uploaded in the HAL e proc-portal for acceptance of Technical Bid. (i) Price Bid as per ANNEXURE I. (ii) Acceptance of Terms and Conditions as per ANNEXURE II. (iii) Technical Terms and Conditions as per ANNEXURE A. (iv) Scanned copy of Omnibus Non -disclosure Agreement ( NDA) in prescribed format uploaded in tender. In case, the bidder has entered into an Omnibus NDA with HAL Barrackpore, the bidder may not be required to upload the scanned copy of the Omnibus NDA along with the tender. (v) Copy of valid registration certificate for same/ similar type of tendered jobs (sheet metal fabrication) by outsourcing dept. of other divisions of HAL( if not registered with HAL Barrackpore).
10 Technical requirements & process approval a) Any type of Unconventional machining like EDM,Wire cut, Spark erosion and laser cutting to be avoided on these parts if not mentioned in our Drawing or Process Sheet.
b) All parts are to be manufactured exactly as per the HAL supplied controlled drawing and approved Process Sheets/Plan.These process sheets/plan to fabricate the part/component assembly are to be prepared by Sub-contractor and submitted to HAL-Methods Engineering department for approval before actual manufacturing of these part.
c) Any alternate technology / methodology can be used for manufacturing of these parts only after prior approval of HAL Process Planning/Methods. Any minor amendment / notifications in the detail parts as issued by HAL Process Planning / Design Departments at later date will be incorporated by Sub-contractor at no additional cost.
d) Each Inventory part no. is having suffix -E which signifies external operations to be carried out as per Drawings & MPS provided by HAL, Barrackpore
11 Undertaking with supplies a) Vendor has to certify that they have used same raw material which was supplied by HAL for fabricating that particular part.
b) Vendor has to declare that they will be held responsible if any failure/discrepancy occurs due to mismatch of raw material in future and HAL will have full authority to take any appropriate action against them.
c) In the view of above, Supplier has to submit a undertaking for material consumption along with all supplies stating that "Item Part No ............, Part Name ................, Qty......... Nos. fabricated from the raw material supplied by HAL Barrackpore division vide DA No ........... Dated ............... and having material batch no ................ . If any failure/discrepancy occurs due to mismatch of raw material in future, we will be fully responsible for that and HAL will have full discretion/authority to take any appropriate action against us".
12 Preservation of Raw Material & drawings a) All raw material received from HAL shall be properly identified with the order number, specification and quantity. These shall be protected from misuse, loss, damages and deterioration, properly stored at suitably identified and marked place.
b) The party has to protect the machined surfaces with inhibition oil immeditely after completion of machining of the concerned item/ spare and ensure that the machined surfaces are duly protected before despatch of the items to HAL Barrackpore.
c) HAL supplied raw material,drawings and other documents are sole property of Barrackpore Division and needs to be preserved till the completion of purchase order and to be returned to HAL Barrackpore Division after completion of order.
13 Quality / Inspection a) Barrackpore components are all airborne items that involve life critical/flight safety components. Airworthiness of these parts are utmost important and hence Sub-contractor should have quality assurance system procedure inline with HAL QA.
b) HAL Quality Assurance will examine and certify the First Article Inspection at HAL, and give their acceptance. Production batch to be started only after acceptance of first off components by HAL.
c) Sub-contractor shall carry out detailed self inspection along with profile projector/CMM report for critical dimensions wherever neccessary on all these parts and record 100% dimension for each item and offer to HAL inspection for clearance and acceptance. However, if necessary HAL will depute an inspector and accept the components at Sub-contractor's premises. The decision of HAL inspector will be final.
d) Sub-contractor shall inform if any non- conformance noticed during the manufacturing/after dispatch of products to HAL.
e) Vendor should submit the MPS duly filled and signed, to HAL along with each supplies. The Process sheet has to be prepared in accordance with HAL provided MPS by the Sub-contractor and approved by HAL-Methods Engineering department .
f) Pre-dispatch inspection will be done by HAL QA inside Sub-contractor's premises if required. The report furnished by HAL Barrackpore Division Inspector will be final and binding on Sub-contractor. The Sub-contractor shall provide inspection facilities free of charge. The intimation regarding readiness of items should be given by the Sub-contractor in writing seven days in advance in order to enable HAL Barrackpore Division to depute inspector to carry out inspection. Final inspection & acceptance of components will be carried out in HAL’s premises.
g) Authorized representatives of HAL/our customer and Regulatory authorities like DGAQA and DGCA have the right to acess the facilities and applicable records during the execution of contract.
14 Rejection allowance / rework The permissible rejection allowance is 5% (or rounded to next higher whole number ) of the PO quantity . HAL shall recover the cost of raw material rejected in case the rejection exceeds the permissible limit. All rejections are to be supplied back to HAL without fail. Incase of return of supplied items back to Sub-contractors due to deviation, to and fro charges to be borne by Sub-contractor.
15 Liquidated damages Liquidated damages will be applicable in case of delayed supplies @ 0.5% per week (or part thereof) of the value of items so delayed subject to maximum of 5% of such delayed supplies.
16 Indemnity Bond Indemnity Bond equivalent to the cost of raw materials lying at any point of time at Sub-contractor’s premises need to be submitted within 30 days after receipt of Order. The indemnity bond shall be provided in stamp paper. The format will be furnished by HAL Barrackpore division in the event of placement of order.
17 Risk purchase In the event of the Sub-contractor failing or regretting to execute the order, within one month after the expiry of the delivery date indicated in the orders or any extension granted thereof specially by HAL Barrackpore Division, HAL Barrackpore Division at its discretion in addition to levying liquidated damages as per liquidated damage clause above, will also have the right to initiate risk purchase and get such items, which remain undelivered, manufactured from alternate sources and recover the extra cost thus incurred by HAL Barrackpore Division from the Sub-contractor.
18 Confidentiality agreement a) HAL Barrackpore Division will provide drawings( (hard/soft copy) to Sub-contractor for manufacturing of these parts. All the documents issued to Sub-contractor are strictly confidential. Sub-contractor should keep them in safe custody. The information contained in the documents should neither be divulged to any other person by Sub-contractor nor copied. Sub-contractor is solely responsible to prevent any possible pilferage of these documents.
b) The models/tools modified/developed by the Sub-contractor on HAL’s instructions/technical inputs will be the property of HAL and supplied back to HAL on completion of the order.
19 Parallel agreement / contract Nothing in this agreement / contract precludes HAL Barrackpore Division from entering now or hereinafter into any agreement / contract with others for manufacturing and supply of same or similar goods.
20 Termination of contract In the event of HAL being not satisfied with the performance of the Sub-contractor at any point of time, in terms of either quality of job or care of our material or delivery, also in case the Sub-contractor indulges in malpractices, fraud, cheating etc., HAL Barrackpore Division shall be entitled to terminate the contract, after giving 30 days notice in writing to the Sub-contractor by registered post and under this condition HAL Barrackpore Division will not be liable to pay any compensation whatsoever to the Sub-contractor.
21 Jurisdiction The court at Kolkata (West Bengal) only shall have jurisdiction to deal with and decide any legal matter whatsoever arising out of this contract.
22 Counter terms and conditions When counter terms and conditions of the business are offered by the bidder, HAL shall not be deemed to be governed by such terms & conditions unless written acceptance thereof has been given by HAL. No conditions & terms, notice of which has not been given in the tender by bidders submitting quotations will be considered by HAL, if put forward in subsequent correspondence and after placement of order.
23 Sub-contracting / Sub-letting In the event of an order by HAL, Sub-contractor shall not further sub-let to it’s Sub-contractors in executing the order without prior approval from HAL subcontract department. If Sub-contractor is going to use the facilities from their sub-Sub-contractor, the details of such sub-Sub-contractors, their facilities and approval of facilities etc are to be submitted to HAL and prior approval for use of their facilities may be obtained from HAL, Barrackpore division
24 Modification & Improvements/ Drawing changes a) Sub-contractor shall implement minor drawing changes as and if advised during manufacturing and compliance of Project slips/deviation slips/repair schemes related to individual drawings at no additional cost.
b) Sub-contractor should notify HAL, incase of chage in product and/or process definition and, where required shall obtain approval from HAL.
25 Warranty The supplies shall be free from any defects/workmanship and shall be guaranteed for quality/satisfactory performance for a period of 12 months from the date of acceptance. Any defects because of faulty workmanship noticed during the guarantee period shall be rectified by the Sub-contractor free of cost. In case, where full checking is initially not possible and the final inspection will be done at the time of actual production, the defects if any noticed at that time will be reported immediately to the Sub-contractor. In case the Sub-contractor fails to rectify within 30 days from date of notification, the cost of raw materials and the other charges paid Sub-contractor will be recovered from pending bills/BG/Security deposit of the Sub-contractor.
26 Appropriation Whenever any sum of money is recoverable from sum of money payable by the bidder, HAL shall be entitled to recover such sum by appropriating in part or whole by deducting any sum then due or which at any time thereafter may become due to the bidder in this or any other contract entered by HAL AS A WHOLE ITS Divisions and Branch offices etc., held by him alone or in partnership with others. Should this sum be not sufficient to cover the full amount recoverable, the bidder shall pay to HAL on demand the remaining balance due.
27 Applicable Law This contract shall be governed by and subject to and interpreted and construed in accordance with the Laws of Republic of India, as may be in force from time to time.
28 Arbitration All disputes or differences whatsoever arising between the parties out of or relating to the construction meaning and operating or effect of this contract or the breach thereof shall be settled by arbitration in accordance with the rules of arbitration of the. Indian Council of Arbitration and the award made in pursuance thereof shall be binding on the parties.
29 Work & Payment During Arbitration Work under the contract shall if reasonably possible continue by mutual agreement during the arbitration proceedings and no payment due to or payable by HAL will be withheld without reasonable cause and merely on account of the tendency of such proceedings unless the same is subject of arbitration.
30 Fall Clause a) The price quoted shall be in no event exceed the lowest price at which you sell the stores or offer to sell stores of identical description to any person(s) / organization including the purchases by any department of the Govt. of India, the State Govt. or any statutory undertaking of Govt. of India / State Govt., as the case may be during the period till the completion of the performance of the order placed and during currency of the order.
b) If at any time during the said period, the Seller reduces the sales price, sells or offer to sell such stores to any person(s) organization including the purchaser or any department of Govt. of India or State Govt. and any statutory undertaking of the Govt. of India / State Govt. as the case may be, at a price lower than the price chargeable in the order, Seller shall henceforth notify such reduction / sales or offer to sale to Hindustan Aeronautics Ltd., and the price payable in the order for the stores supplies after date of coming into force such reduction or sale or offer to sale shall stand correspondingly reduced.
31 Response/Regret Please send your Regret Reply in case the subject item is not covered in your range of products or you are not willing to submit proposal.
32 Applicability of terms & conditions Any order resulting from this enquiry, shall be governed by the General Terms & conditions of contract of HAL, and the same will be printed on overleaf of Purchase order.
33 Despatch Documents a) Sub-contractor has to provide below mentioned documents along with the each supplies: 1. Delivery Challan (Final & Internal Operations, if any) 2. Invoice 3. Undertaking for Material Consumption as per Sl.No. 11(c) mentioned above 4. Signed Process Sheet as per Sl.No. 9(b) & 12(e) mentioned above 5. Detail Inspection Report as per CQAG-9002 Format Consignment not accompanying any of the above documents will be returned back to the sub-contractor.
b) The vendor has to mandatorily indicate the applicable GST rate seperately in the invoice at the time of delivery. Also the vendor has to indicate the HSN/SAC (Service Accounting Code) as applicable in their invoices. Seprate invoices to be submitted against each delivery challan (DC) at the time of delivery. There shall be a separte DC for each part loaded against HAL material gate passs (MGP)/Despatch advice (DA). Work Order No., Batch No. of raw material, HSN/SAC code, Quantity, MGP/DC No., P.O. No. to be mentioned in the documents wherever applicable. Quantity on documents shall match with delivered quantity. Vendor may please adhere to the above guidelines while preparing the dispatch documents.
34 In the event the values in figures and in words do not match, the values in words would be considered as final.
35 HAL, Barrackpore Division reserves the right to reject, partially or fully, offers received. HAL, Barrackpore Division also reserves the right to modify (by adding or deleting)/relax any of the tender condition/give some time for compliance after opening of Technical bid if feel necessary for competitative offer or for smoothness of execution of order without asserting any reason to any contractor.
36 Late / Delayed Offers Will Not Be Considered.
37 If purchase order is not placed on you, you should positively return back the drawings/technical specifications provided to you by HAL Barrackpore division.
38 The participating MSEs in a tender, quoting price within the band of L1 + 15% may also be allowed to supply a portion of the requirement by bringing down their price to the L1 price, in a situation where L1 price from someone other than MSE. Such MSEs may be allowed to supply upto 20% of the total tendered value. In case of more than one such eligible MSE, the supply will be shared equally.
39 Please mention about the status of your firm or company whether: (A) MSE (B) Small Scale Industries (SSI) (C) Ancillary Unit (D) Large / Small (E) Agent (F) Stockiest (G) General order Sub-contractor (Please indicate your Registration Number).
40 In case of MSME vendors, please mention whether they are SC/ST unit or not? If yes, suitable certificate to be enclosed.
41 Sub-contractor to send bank details duly verified by bank. If it is submitted earlier, then only bank details to be mentioned here.
42 All other general terms and conditions as per Annexure-III are acceptable. However, terms & conditions mentioned in Annexure-II will supersede the same mentioned in Annexure-III.
Technical Terms & Conditions
Name of Sub-contractor:
Tender No.: HAL/BKP/SC/2024-25/98461422/2
Sl. No. Description Complied (Yes/No)
1 Fabrication of items to be done on Raw Material supplied by HAL Barrackpore Division as per drawing and process sheet. All Machining operation to be carried out as per drawing & process sheet by vendor except processes like welding, plating, Heat treatment (annealing) etc.
2 Sub-contractor has to certify that they have used same raw material which was supplied by HAL for fabricating that particular item.
3 Sub-contractor has to declare that they will be held responsible if any failure/discrepancy occurs due to mismatch of raw material in future and HAL will have full authority to take any appropriate action against them.
4 Sub-contractor should submit the MPS duly filled, to HAL along with supplies.
5 Delivery of first off sample (FOS) is required within 3 months from receipt of Purchase Order or issuance of raw material whichever is later. The remaining lot (in one or multiple batches) to be delivered within 3 months from the date of acceptance of FOS subject to issuance of raw material. Batch size may vary depending upon HAL production plan.
6 First article inspection (FAI) requirement is to be met as per AFQMS, issue - II/AS9100D standard/CQAG 9002/AS9102A requirements. Sub-contractor must fulfil FAI requirements and the same need to be confirmed by them during submission of quotation. The requirements are as follows: • First article inspection shall be carried out by the subcontractor on the first production run of a new part to verify that the production processes, production documentation and tooling are capable of producing parts that meet requirements. The process shall be repeated when changes occur that invalidate the original results (e.g. engineering changes, manufacturing process changes, change of location. • The subcontractor shall maintain a first article inspection file for each part manufactured and the file shall contain the following: (i) Balloon marked identification (KPI) for each characteristics specified in the drawing. (ii) Dimensional inspection report as per Annexure – VII of CQAG 9002.
1 Non-compliance of above terms and conditions, quotation will not be evaluated further.
2 Each inventory part no. is having suffix -E which signifies external operation to be carried out as per Drawing & MPS provided by HAL, Barrackpore.
Name of the Sub-contractor:
Enquiry No. : HAL/BKP/SC/2024-25/98461422/2
Quote Ref. : Date (dd/mm/yyyy)
SL. NO. PART NO. PART DESCRIPTION Remarks QTY. (In Nos.) UNIT COST (In Rs.) TOTAL COST (In Rs.)
1 PSH/113251-2-E ATTACHMENT FITTING Fabrication of items to be carried out as per attached drawing and MPS 30 0.00
TOTAL VALUE (in Rs.) 0.00
Total value in Words (Rs):
Packing & Forwarding if any (%)
HSN/SAC code as applicable
GST as applicable (%)
Others (to be specified below) (%)
BANK DETAILS (Name & address of the Bank, Account No., IFSC code & type of A/c) Sub-contractor to send a bank details duly verified by bank. If it is submitted earlier, then only bank details to be mentioned.
ADDITIONAL CLAUSE (If any)
Note: 1. In case additional conditions are required, the same will be enclosed separately. 2. Price Bid is to be uploaded strictly in the Price Bid format as per the above EXCEL SHEET. 3. Sub-contractors are required to fill the fields in Yellow colour only in the Price Bid format. Columns containing SL. NO., PART NO, PART DESCRIPTION, REMARKS and QTY. (In Nos.) of Price Bid format are not to be altered/corrected.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
raw.json
RAW_JSON
RFQ98461422.pdf
TENDER_DOCUMENT • 0.24 MB
AnnexureIIIGeneralTC98461422.pdf
TENDER_DOCUMENT • 0.18 MB
AnnexureIVRAWMATERIALCOST98461422.pdf
TENDER_DOCUMENT • 0.04 MB
AnnexureII98461422.xlsm
TENDER_DOCUMENT • 0.02 MB
MPS98461422.pdf
TENDER_DOCUMENT • 0.22 MB
AnnexureA98461422_TechnicalTC2.xlsm
TENDER_DOCUMENT • 0.01 MB
AnnexureI98461422_PRICE_BID_2.xlsm
TENDER_DOCUMENT • 0.01 MB
DRAWINGS98461422.pdf
TENDER_DOCUMENT • 4.37 MB
OmnibusNDAOutsourcingFORMAT.pdf
TENDER_DOCUMENT • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .