Loading…
Loading…
Tender Value
₹1.6 L
EMD Value
₹2,000
Closing Date
10 Aug 2026, 6:00 pmClosed
Executive Engineer Sipu Project Division, Palanpur
Assessment of Storage Capacities of Reservoirs (Bathymetry Survey, Topography Survey) of Hadamatiya M.I.Scheme Ta-Dantiwada Dist-Banaskantha
327536
Notice No.2 of 2026-27
Open
Survey Works
Works
Banaskantha
7 documents required · 7 mandatory
₹600
Executive Engineer Sipu Project Division Palanpur
₹2,000
24 Jul 2026
24 Jul 2026
24 Jul 2026
10 Aug 2026
24 Jul 2026
BILL OF QUANTITIES
Name of Work :- Assessment of Storage Capacities of Reservoirs (Bathymetry
Survey, Topography Survey) of Hadamatiya M.I.Scheme Ta-
Dantiwada Dist-Banaskantha
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Item Description of Item (with brief specification Quantity Unit Rate In Amount
No and reference to book of specifications) figures
1 Conducting Bathymetry Survey using echo sounder for
assessment of reservoir capacity and sedimentation
including providing all vessels, tools, shackles,
equipment, accessories, consumable personnel etc.
Including Mobilisation and Demobilisation of suitable
vessels, survey equipment at site by the contractor
including submission of all deliverables both in hard
and soft copy in all respects.
2 Conducting Topographical survey with all the
resources and achieving all the deliverables to
facilitate the hydrographic survey so as to fill up the
gaps between (a) MWL area and (B) Reservoir
submergence area till current water level for
assessment of reservoir capacity and sedimentation.
Rupees One Lakh Sixty Thousand Thirty Five Only
I/We am/are willing to carry out the work at… ...................... % above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ………………………………
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1. The Contractor shall exhibit a board with brief details of work as directed by the Engineer-In-Charge
for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R. NO.:
MIS102010/17/K1 Dated:30/07/2018 as stated in S.O.R. therefore in R.C.C. items where there is a change
as per actual mix design the cost of difference of cement consumption have been deducted from the rate of
original item at the rate of input rate mentioned in all the tender.
Deputy Executive Engineer Sr. Divisional Accounts Officer Executive Engineer
Sipu Proj. H.W. Sub Dn. No.1 Sipu Project Division Sipu Project Division
Dantiwada Palanpur Palanpur
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Nivida 2.pdf
SBD Bathmetry Survey Hadmatiya.pdf
SCH-B Bathmetry Survey Hadmatiya.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .