| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAccepted-AOC GOKULWADI SANQUELIM GOA | NORTH GOA | GOA | 403001 | ₹2.4 Cr Quoted ₹20.5 L | L1 | Accepted-AOC As per L1 basis |
| 2 | L2₹20.6 LRejected-Finance | ₹20.6 L | L2 | Rejected-Finance As per L1 basis |
| Sl No | Description | Qty | Unit | MAQBOOL H GAJIPUR L1 | M/s IJM Construction L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation by mechanical means in all type of strata comprising any of the materials such as soil, silt, sand, clay gravel, moorumS of all varities shingles, pebble, satiurated soil, all type of conglomerates, all types of laterite rock, soft rock, ordinary rock, disintegrated rock, fissured/shattered, decomposed rock or weathered rock and all such other materials, as described under appendix to those specifications either in full or in parts as the case may be adopting any approved method or methods as may be convinient or permitted including of chiselling, wedging etc. but blasting prohibited in all conditions such as dry moist, saturated submerged, foul conditions etc. including pumping or bailing out water, including setting out construction of shoring and bracing removal stumps and other deleterious matters, dressing of side and bottoms and disposal of excavated earth including all lifts etc. complete as specified and directed by the Engineerin charge.
All kinds of soil | 254 | cum | 200 ₹50,800 | 250 ₹63,500 |
| 2.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 23 | sqm | 2,000 ₹46,000 | 2,100 ₹48,300 |
| 3.00 | Providing & Laying cement concrete 1:2:4 (1 Cement: 2 Coarse Sand: 4 Graded Granitic or Basiltic Stone aggrt. 20mm nominal size) excluding cost of centering , shuttering and finishing in:
a) All Works upto plinth level | 23 | cum | 6,600 ₹1,51,800 | 6,400 ₹1,47,200 |
| 4.00 | Centering and shuttering including struttings, propping etc. and removal of formworks for:
a) Foundations, footings, bases for columns and mass concrete. | 300 | sqm | 400 ₹1,20,000 | 400 ₹1,20,000 |
| 5.00 | Providing & Laying in position (1:1 1/2:3) Reinforced Cement Concrete excluding the cost of reinforcement (1 cement : 1 1/2 coarse sand : 3 graded stone agg 20mm nominal size)
In Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and structs etc. upto floor five level. | 109 | cum | 7,700 ₹8,39,300 | 7,500 ₹8,17,500 |
| 6.00 | Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in charge.
A) 110 mm dia | 32 | Rmt | 350 ₹11,200 | 250 ₹8,000 |
| 7.00 | Providing TMT Steel Reinforcement Bars of (SAIL, TATA, VIZAG, JSW Steel Ltd.) (Confirming to I.S. 1786 of 1986) including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member. | 6,200 | Kg | 130 ₹8,06,000 | 135 ₹8,37,000 |
| 8.00 | Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 m and all lifts and disposal of surplus earth as directed by Engineer in-charge. | 105 | cum | 200 ₹21,000 | 200 ₹21,000 |
Tender Value
₹23.2 L
EMD Value
₹46,404
Closing Date
16 Oct 2025, 5:30 pmClosed
EEVI, WRD, Bicholim
EEVI, WRD, Bicholim
Stabilization of Hill with RCC retaining wall behind the house of Shri. Mangaldas Vithoba Mulgaonkar and others at Ambeshi Pale in Sankhalim Constituency.
2025_WRD_24967_1
No.WRD/WDVI/PB/F.30/TN e 27/2025-26/ 501 Line 6 Dated 24 /09
Open Tender
Civil Works - Water Works
90 days
Bicholim
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹46,404
17 Mar 2026
6 Oct 2025
17 Oct 2025
6 Oct 2025
16 Oct 2025
6 Oct 2025
Amount
Earthwork in excavation by mechanical means in all type of strata comprising any of the materials such as soil, silt, sand, clay gravel, moorumS of all varities shingles, pebble, satiurated soil, all type of conglomerates, all types of laterite rock, soft rock, ordinary rock, disintegrated rock, fissured/shattered, decomposed rock or weathered rock and all such other materials, as described under appendix to those specifications either in full or in parts as the case may be adopting any approved method or methods as may be convinient or permitted including of chiselling, wedging etc. but blasting prohibited in all conditions such as dry moist, saturated submerged, foul conditions etc. including pumping or bailing out water, including setting out construction of shoring and bracing removal stumps and other deleterious matters, dressing of side and bottoms and disposal of excavated earth including all lifts etc. complete as specified and directed by the Engineerin charge. All kinds of soil
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Providing & Laying cement concrete 1:2:4 (1 Cement: 2 Coarse Sand: 4 Graded Granitic or Basiltic Stone aggrt. 20mm nominal size) excluding cost of centering , shuttering and finishing in: a) All Works upto plinth level
Centering and shuttering including struttings, propping etc. and removal of formworks for: a) Foundations, footings, bases for columns and mass concrete.
Providing & Laying in position (1:1 1/2:3) Reinforced Cement Concrete excluding the cost of reinforcement (1 cement : 1 1/2 coarse sand : 3 graded stone agg 20mm nominal size) In Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and structs etc. upto floor five level.
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in charge. A) 110 mm dia
Providing TMT Steel Reinforcement Bars of (SAIL, TATA, VIZAG, JSW Steel Ltd.) (Confirming to I.S. 1786 of 1986) including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member.
Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 m and all lifts and disposal of surplus earth as directed by Engineer in-charge.
M/s IJM Construction (BID ID -53943)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid