| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹5.8 L+₹14,074 (2.47%)Rejected-AOC | L2 | Rejected-AOC Second lowest |
Tender Value
Refer Docs
EMD Value
₹13,149
Closing Date
16 Oct 2024, 3:00 pmClosed
Assistant Executive Engineer
Office of the Assistant Executive, Electrical wing irrigation Sub division Aluva
G E N E R A L A M C 2 0 2 4 2 5 F u l l y Comprehensive Annual Maintenance of Pampakuda Lift, Pampakuda Relift, and Ramamangalam No 1 LIS Under Electrical Lift Irrigation Section Ramamangalam General Electrical Work
2024_Irrig_694209_19
PWD/BLDG/RLM/6773/2024-2025
Open Tender
Electrical Works
Item Wise
365 days
Ramamangalam
Please refer Tender documents.
11 documents required · 11 mandatory
₹1,160
₹13,149
27 Dec 2024
8 Oct 2024
18 Oct 2024
8 Oct 2024
16 Oct 2024
8 Oct 2024
Amount
Motor Overhauling Works
OD236347/2023-2024:Dismantling the 75 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
OD236379/2023-2024:Dismantling the 80 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
OD236382/2023-2024:Dismantling the 110 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
OD236348/2023-2024: Dismantling the 125 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
OD236387/2023-2024: Dismantling the 175 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
Motor Lowering Works
OD236340/2023-2024: Lowering down and erecting 5 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD236343/2023-2024: Lowering down and erecting 75 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD236399/2023-2024: Lowering down and erecting 80 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD236401/2023-2024: Lowering down and erecting 100 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD236403/2023-2024: Lowering down and erecting 110 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD236344/2023-2024: Lowering down and erecting above 125 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD236417/2023-2024: Refitting the 175 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
Consumables and Supplies
OD236349/2023-2024:Supply and filling of transformer oil of good quality to the Transformer /starter/ regulator etc as required
OD236351/2023-2024: Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one
OD236352/2023-2024:Supply and Installing 20 W LED Tube light.
OD236354/2023-2024:Supply and renewal of Three Phase digital Ammeter accuracy class 1 in panel board after dismantling the damaged one, L&T or equivalent make.
OD236355/2023-2024:Supply and renewal of Three Phase Digital Voltmeter accuracy class 1 in panel board after dismantling the damaged one, L&T or Equivalent make.
OD236356/2023-2024:Supply and Installation of DOL starter for 5 HP 3 phase 400V 50Hz squirrel cage induction motor including giving connections( L&T /Equivalent made)
OD236676/2023-2024:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6309 , SKF / FAG or equivalent, suitable for pump (50-125 HP) as per the direction of Departmental staff at site.
OD236358/2023-2024:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6314 SKF / FAG or equivalent, suitable for 100 HP motor / pump set as per the direction of Departmental staff at site.
OD236357/2023-2024:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6316 , SKF / FAG or equivalent, suitable for 110/125 HP motor / pump set as per the direction of Departmental staff at site.
OD236359/2023-2024:Dismantling the damaged power contactor and Supply, fixing and testing of following capacity 3 pole power contactor, AC 3 rating at 415 V, with AC Coil, Auxiliary contacts, 2 NO/2NC, L&T MNX 140 or equivalent suitable for 80/100 HP motor's fully automatic star delta starter
OD239599/2023-2024: Supply and installation of 5 Amps MCBs on a DIN channel in the existing Panel in place of control fuse for the protection of Indicators,Voltmeter,Ammeter etc through a 40 Amps 4 pole Isolator.
2.1.6:Providing and fixing following capacity TP&N disconnector fuse switch unit inside the existing panel board with ISI marked HRC fuses including drilling holes in cubicle panel, making connections, etc. as required.200 Amp TP&N
OD121877/2024-2025:Supply, installation , testing and commissioning of 415 Volts, 250 Amps DIN Type HRC Fuse Base With 200 Amps HRC Link in the existing SDF, including giving connections with proper termination.
90.14.24.25:Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection.15 KVAr, 3 phase, 440 V, delta connected, standard duty Metalised Poly Propylene Capacitor, Box Type, suitable for direct connection to motors.
2.10.4:Supplying and fixing 5 amps to 32 amps rating, 240/415 volts, "C" curve, miniature circuit breaker suitable for inductive load of following poles in the existing MCB DB complete with connections, testing and commissioning etc. as required.Triple pole
2.12.1:Supplying and fixing following rating, double pole, 240 volts, isolator in the existing MCB DB complete with connections, testing and commissioning etc. as required.40 amps
2.13.1:Supplying and fixing following rating, four pole, 415 volts, isolator in the existing MCB DB complete with connections, testing and commissioning etc. as required.40 amps
90.14.24.26:Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection.20 KVAr, 3 phase, 440 V, delta connected, standard duty Metalised Poly Propylene Capacitor, Box Type, suitable for direct connection to motors.
90.14.24.27:Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection.25 KVAr, 3 phase, 440 V, delta connected, standard duty Metalised Poly Propylene Capacitor, Box Type, suitable for direct connection to motors.
90.14.24.28:Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection.30 KVAr, 3 phase, 440 V, delta connected, standard duty Metalised Poly Propylene Capacitor, Box Type, suitable for direct connection to motors.
2.14.1:Supplying and fixing following rating, double pole, (single phase and neutral), 240 volts, residual current circuit breaker (RCCB), having a sensitivity current upto 300 milliamperes in the existing MCB DB complete with connections, testing and commissioning etc. as required.25 amps
90.11.1.18:Supply and installation of sheet steel, phosphatised and painted, dust and vermin proof enclosure of MCB DB including copper /brass bus bar, neutral link, earth bus and DIN rail suitable for fixing MCB/ isolator etc. fixed on wall using suitable anchor bolts or fixed in recess including cutting hole on the wall , making good the damages, colour washing etc. as required4 way (8+12) - double cover TPN vertical DB with provision for fixing MCCB as incomer and SP/ TP MCB as outgoing (IP 42/43)
90.12.7.41:Supply, laying and clamping of 1 no. PVC insulated and PVC sheathed armoured aluminium power cable, 1.1 KV grade of the following sizes using clamps noted along with the cables, spacing of clamps not exceeding 60cms, making good the damages , colour washing etc. as required.4 core 16 sq mm with factory made clamp
90.16.1.2:Supply and drawing bare earthing conductors of the following sizes along with wiring/ cables and giving connection as required2.65 mm copper conductor (12 SWG)
9.1.33:Supplying and making end termination with brass compression gland and aluminium lugs for following size of PVC insulated and PVC sheathed / XLPE aluminium conductor cable of 1.1 KV grade as required.4 X 16 sq. mm (28mm)
1.14.3:Wiring for circuit/ submain wiring alongwith earth wire with the following sizes of FRLS PVC insulated copper conductor, single core cable in surface / recessed medium class PVC conduit as required2 X 4 sq. mm + 1 X 4 sq. mm earth wire
1.14.2:Wiring for circuit/ submain wiring alongwith earth wire with the following sizes of FRLS PVC insulated copper conductor, single core cable in surface / recessed medium class PVC conduit as required2X 2.5 sq. mm + 1 X 2.5 sq. mm earth wire
1.24.3:Supplying and fixing following modular switch/ socket on the existing modular plate & switch box including connections but excluding modular plate etc. as required.15/16 amp switch
1.24.5:Supplying and fixing following modular switch/ socket on the existing modular plate & switch box including connections but excluding modular plate etc. as required.6 pin 15/16 amp socket outlet
1.27.2:Supplying and fixing following size/ modules, GI box alongwith modular base & cover plate for modular switches in recess etc as required.3 Module (100mmX75mm)
OD123976/2024-2025:Supply of line tester Taparia 818 YL or equivalent
OD123977/2024-2025:Supply of Ring Spanner set – 1812 Taparia or equivalent
OD123978/2024-2025:Supply of double end Spanner set – DEP 12 Taparia or equivalent
OD123984/2024-2025:Supply of Combination plier 1621-8 Taparia or equivalent
OD121977/2024-2025:Supply of Screw driver, flat tipped, 300 x 8 mm Taparia or equivalent
OD121978/2024-2025:Supply of Screw driver, flat tipped, 300 x 4 mm Taparia or equivalent
OD123985/2024-2025:Supply and providing 11 KV rubber hand long glove
OD125603/2024-2025:Revamping of LT switch boards described as following, measured per square meter area of the front face of panel : 1.External cleaning, minor repairs etc. ,and sheet metal works as required. 2.Panel Board repairs & Repair of hinges, minor sheet metal work etc. 3.Replacing rubber beading as required. 4.Panel board interior cleaning including repair of loose termination, bus bars, mountings etc. 5.Renewal of perished fasteners, terminals etc. 6.Trouble shooting the control the wiring including rectifications 7.Renewal of Terminal sockets as required 8.Insulation checks and correction of earthing 9.Filling of un necessary holes in the panel board using suitable sheet metal work. 10. Sealing the cable entry point using expandable PU Foam insulation sealant spray to safeguard from rats. 10. Lettering and identification marking.
Motor AMC
OD236361/2023-2024:Fully Comprehensive Annual Maintenance of 5 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts, replacing spares with original make as per sample, dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, overhauling of the motor, maintenance of motor thorughout the AMC period whenver necessary (excluding rewinding) repairs of vaccum pipe line, starter, valves electrical accessories etc as required complete in good working condition including painting the motor pumpset, base plate all time during the period of contract and the faults should be rectified with in the time allowed.(Total 3 Motors, 12 months for Each Motor).
OD236365/2023-2024: Fully Comprehensive Annual Maintenance of 80 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD236429/2023-2024: Fully Comprehensive Annual Maintenance of 100 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD236369/2023-2024: Fully Comprehensive Annual Maintenance of 75 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, reconditioning the slipring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD236443/2023-2024: Fully Comprehensive Annual Maintenance of 80 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, reconditioning the slipring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD236461/2023-2024: Fully Comprehensive Annual Maintenance of 110 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, reconditioning the slipring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD236370/2023-2024: Fully Comprehensive Annual Maintenance of 125 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, reconditioning the slipring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD236508/2023-2024: Fully Comprehensive Annual Maintenance of 175 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, reconditioning the slipring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .(Total 3 Motors, 12 months for Each Motor).
Motor Lifting Works
OD236372/2023-2024: Lifting the 5 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD236375/2023-2024:Lifting the 75 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD236530/2023-2024:Lifting the 80 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD236542/2023-2024:Lifting the 100 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD236548/2023-2024:Lifting the 110 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD236376/2023-2024: Lifting the 125 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
SHIJU M.T
Bidder Name
SHIJU M.T
GK INDUSTRIES
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1083328.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .