Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.9 LAccepted-AOC | ₹2.9 L | 1 | Accepted-AOC LOWEST |
| 2 | Rejected-Technical | - | - | Rejected-Technical nl |
| 3 | Rejected-Technical | - | - | Rejected-Technical nl |
| Sl No | Description | Qty | Unit | Mathukutty Abraham L2 | JOSHY THOMAS L1 | FASIYA P D L3 |
|---|---|---|---|---|---|---|
| 1.00tarring | ||||||
| 1.00 | 3.15.2:Compacting Original Ground (ii) Compacting original ground supporting subgrade Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2. | 20.65 | cum | 66.76 ₹1,378.59 | 61.55 ₹1,271.01 | 20 ₹413 |
| 1.00 | OD427239/2023-2024:Filling with Quarry Muck
Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 31.75 | cum | 987.23 ₹31,340.60 | 910.13 ₹28,892.99 | 497 ₹15,777.76 |
| 1.00 | 4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead | 47.62 | cum | 3,503.72 ₹1.7 L | 3,230.1 ₹1.5 L | 3,370 ₹1.6 L |
| 1.00 | 75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 317.46 | sqm | 82.54 ₹26,203.15 | 76.09 ₹24,155.53 | 100 ₹31,746 |
| 1.00 | 75.5.2.3pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 317.46 | sqm | 17.9 ₹5,682.53 | 16.5 ₹5,238.09 | 20 ₹6,349.20 |
| 1.01 | OD427254/2023-2024:
Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 using Shredded Plastic Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates coated with shredded plastic (3% by weight of bitumen) as per standard procedure using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means:- Type A (II) Bitumen (S-65) | 317.46 | sqm | 251.94 ₹79,980.87 | 232.26 ₹73,733.26 | 351 ₹1.1 L |
Tender Value
₹3.0 L
EMD Value
₹7,415
Closing Date
27 Aug 2024, 3:00 pmClosed
AEE, Pala Municipality
Office of the AEE, Pala Municipality
Annual Plan-2023-24/ Pala municipality 166/23-24 WARD 2-PANAMATTOM ROAD CONSTRUCTION -General Civil Work-RETENDER
2024_LSGD_686402_1
LSGD/CELSGD/8494/2024-2025
Open Tender
Civil Works - Roads
120 days
Pala Municipality
Please refer Tender documents.
10 documents required · 10 mandatory
₹655
₹7,415
26 Mar 2026
17 Aug 2024
29 Aug 2024
17 Aug 2024
27 Aug 2024
17 Aug 2024
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1067994.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
viewsbd.pdf
Tender Documents • 1.85 MB
BOQ_1067994.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid