Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAdmitted-Finance 3 NEW TRIMURTY CO OP HOUSING SOCIETY INGOLE NAGAR WARDHA ROAD NAGPUR 440005 MAHARASTRA | NAGPUR | NAGPUR | MAHARASHTRA | 440005 | ₹8.0 L | L1 | Admitted-Finance |
| 2 | L2₹9.3 L+₹1.3 L (16.9%)Admitted-Finance 2 3 AMIT VIJAY APT CHSL KASTURBA CROSS ROAD NEAR BHANU PARK KANDIVALI WEST MUMBAI 400 067 | MUMBAI | MUMBAI | MAHARASHTRA | 400067 | ₹9.3 L+₹1.3 L (16.9%) | L2 | Admitted-Finance |
| 3 | L3₹10.4 L+₹2.4 L (30.7%)Admitted-Finance | ₹10.4 L+₹2.4 L (30.7%) | L3 | Admitted-Finance |
| 4 | L4₹15.0 L+₹7.1 L (88.5%)Admitted-Finance 206 MADHUKALA BHAVAN R K VAIDYA ROAD DADAR MUMBAI MAHARASHTRA 400028 | MUMBAI | MAHARASHTRA | 400028 | ₹15.0 L+₹7.1 L (88.5%) | L4 | Admitted-Finance |
| 5 | L5₹28.9 L+₹20.9 L (263.0%)Admitted-Finance 52 A 4TH FLOOR INDIAN REGISTER OF SHIPPING ADI SHANKARACHARYA MARG POWAI LAKE POWAI MUMBAI MAHARASHTRA | ₹28.9 L+₹20.9 L (263.0%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | B J MEHTA ARCHITECTURAL AND STRUCTURAL CONSULTANTS PVT.LTD. L2 | Epicons Consultants Pvt Ltd L4 | M/S. BECQUEREL INDUSTRIES PVT. LTD. L1 | Amrutha Engineering Laboratories Private Limited L3 | IRCLASS SYSTEMS AND SOLUTIONS PRIVATE LIMITED L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Ultrasonic pulse velocity tests (UPV) on wall surafces and floors where ever required as per the requirements of HSL | 500 | Point | 2,75,000 ₹3,24,500 | 1,75,000 ₹2,06,500 Lowest | 2,00,000 ₹2,36,000 | 2,50,000 ₹2,95,000 | 1,75,000 ₹2,06,500 Lowest |
| 2.00 | Rebound hammer tests (RHT) on wall surafces and floors where ever required as per the requirements of HSL | 500 | Point | 2,50,000 ₹2,95,000 | 1,37,500 ₹1,62,250 | 1,75,000 ₹2,06,500 | 2,37,500 ₹2,80,250 | 1,25,000 ₹1,47,500 Lowest |
| 3.00 | Core Tests on wall surafces and floors where ever required as per the requirements of HSL | 50 | Point | 1,25,000 ₹1,47,500 Lowest | 2,10,000 ₹2,47,800 | 1,75,000 ₹2,06,500 | 1,25,000 ₹1,47,500 Lowest | 2,25,000 ₹2,65,500 |
| 4.00 | Preparation and submission of Detailed Report, present strength of Dry Dock Flooring at specified locations, recommended repair & strengthening methodology and Submission of Bill of Quantities for tendering and Structural stability report for the structures like Dry Dock Diaphragm walls, Dry Dock flooring, Wet Basin gallery area, Pump Houses, settlement of Road between Dry Dock & Wet Basin, side handrail structure of Dry Dock gallery and drainage system of Dry Dock with the vetting of AU / NITs / IITs. | 1 | LS | 1,39,300 ₹1,64,374 | 7,50,000 ₹8,85,000 | 1,25,000 ₹1,47,500 Lowest | 2,70,000 ₹3,18,600 | 19,25,000 ₹22,71,500 |
Tender Value
Refer Docs
EMD Value
₹12,600
Closing Date
25 Mar 2026, 3:00 pmClosed
U prakash - M(Civil)
Ph No - 9493792828
Structural assessment of Dry Dock floor, Diaphragm walls and other associated structures of Dry Dock and wet basin located in Yard
2026_HSL_99104_1
OS/CM/2011/51T
Open Tender
Civil Works
Works
30 days
Hindustan Shipyard Limited
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹12,600
Yes
27 May 2026
5 Mar 2026
26 Mar 2026
5 Mar 2026
25 Mar 2026
5 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Ultrasonic pulse velocity tests (UPV) on wall surafces and floors where ever required as per the requirements of HSL | 500 | Point | - | - |
| 2 | Rebound hammer tests (RHT) on wall surafces and floors where ever required as per the requirements of HSL | 500 | Point | - | - |
| 3 | Core Tests on wall surafces and floors where ever required as per the requirements of HSL | 50 | Point | - | - |
| 4 | Preparation and submission of Detailed Report, present strength of Dry Dock Flooring at specified locations, recommended repair & strengthening methodology and Submission of Bill of Quantities for tendering and Structural stability report for the structures like Dry Dock Diaphragm walls, Dry Dock flooring, Wet Basin gallery area, Pump Houses, settlement of Road between Dry Dock & Wet Basin, side handrail structure of Dry Dock gallery and drainage system of Dry Dock with the vetting of AU / NITs / IITs. | 1 | LS | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
51T_Tender_Documents.rar
Tender Documents • 6.80 MB
BOQ_108680.xls
BOQ • 0.35 MB
Due_Date_Ext2.pdf
PDF • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .