Tender Value
₹68.2 Cr
EMD Value
₹12 L
Closing Date
19 Jun 2026, 4:00 pm
Additional Chief Engineer (P&C)
Supply, Installation, testing & commissioning of conversion of 220kV Wagra - Dahej(220kV) line-1 & 220kV Wagra - Haldarwa line-1 of Bharuch Circle with ACSR Zebra Conductor into equivalent HTLS Conductor (Equivalent weight of Zebra Conductor with Higher Ampacity)
307055
ACE(P&C)/Contracts/E-468/Uprating/220kV/S&E
Open
Electrical Works
Vadodara
44 documents required · 38 mandatory · 6 optional
₹11,800
Gujarat Energy Transmission Corporation Limited
₹12 L
30 May 2026
30 May 2026
30 May 2026
19 Jun 2026
30 May 2026
General 23.1 (a) The estimated cost for of 23.1 (a) The estimated cost of Tender is
Conditions of Tender is more than Rs. 100 lacs, more than Rs. 100 lacs, the EMD is
Contract/ the EMD is payable as under: payable as under:
and its sub- 50 % of EMD by DD in favor 50 % of EMD by DD in favor of
clauses of Gujarat Energy Gujarat Energy Transmission
Transmission Corporation Ltd. Corporation Ltd. on any
on any Scheduled Bank in Scheduled Bank in Vadodara
Vadodara and Balance 50 % and Balance 50 % by Bank
by Bank Guarantee from any Guarantee from any Nationalized
Nationalized Bank in the Bank in the format provided
format provided herein. herein.
(b) The estimated cost of tender is (b) The estimated cost of tender is less
less than Rs.100 Lacs, the EMD is than Rs.100 Lacs, the EMD is payable
payable as under: - as under: -
100 % of EMD by DD in favor 100 % of EMD by DD in favor of
of Gujarat Energy Gujarat Energy Transmission
Transmission Corporation Ltd. Corporation Ltd. on any
on any Scheduled Bank in Scheduled Bank in Vadodara.
(c) Payment by Cheque / Coop Bank (c) Payment by Cheque / Coop Bank
Guarantee/ Company Guarantee is Guarantee/ Company Guarantee is not
not permissible. permissible.
(d) Validity Period: - The offer (d) Validity Period: - The offer should
should be valid for a minimum period be valid for a minimum period of
of 180 days from the date of opening days from the date of opening of
of Technical bid. Technical bid.
(e) Payment of EMD will be accepted
by RTGS / NEFT / online or Demand
Seal & Signature of Bidder
draft or Banker’s cheque or Pay
order or Bank Guarantee
23.2 The bid security is required to
protect the owner against the risk of 23.2 The bid security is required to
Bidder’s conduct, which would protect the owner against the risk of
warrant the guarantee forfeiture, Bidder’s conduct, which would warrant
pursuant to relevant paras elsewhere the guarantee forfeiture, pursuant to
relevant paras elsewhere
The bid guarantee shall be made
payable to the Owner without any The bid guarantee shall be made
condition whatsoever. payable to the Owner without any
condition whatsoever.
23.3.1 Any bid not secured in
accordance with Para 23.1 above will 23.3.1 Any bid not secured in
be rejected by the Owner as non- accordance with Para 23.1 above will be
responsive. No exemptions are made rejected by the Owner as non-
in the furnishing of the security. responsive. No exemptions are made in
the furnishing of the security.
23.3.2 Unsuccessful Bidder’s bid
security/EMD will be 23.3.2 Unsuccessful Bidder’s bid
returned/refunded on security/EMD will be returned/refunded
finalization of tender or three
forthwith on finalization of tender i.e.,
months-from the date of
submission of tender once the award of contract, after
whichever is later. opening of price bids. However, the Bid
Security/ EMD of the bidder ranked next
(L2) to the bidder determined as the
successful bidder (L1) shall be retained
by GETCO, along with the Bid Security/
EMD of the successful bidder. Bid
Security/ EMD of L2 bidder shall be
returned immediately after the Letter of
Acceptance/ Award (LOA) is issued by
GETCO to the successful bidder and
acknowledged/ accepted by the
successful bidder or the Contract is
signed with the successful bidder,
whichever event occurs earlier.
However, if there is a delay of 21 days
or more in aforesaid events reckoned
from the date of approval of award of
contract by the competent authority, as
aforesaid, the Bid Security/ EMD of the
L2 bidder shall be released immediately
after the said period of 21 days.
If the validity of the bid expires and any
bidder chooses not to extend the bid
validity, the Bid Security/ EMD of such
bidder shall be returned forthwith.
23.3.3 The successful bidders, Bid
Security will be discharged 23.3.3 The successful bidders, Bid
upon, furnishing the contract Security will be discharged upon,
performance guarantee furnishing the contract security deposit /
performance guarantee.
23.4 The bid guarantee may be
Seal & Signature of Bidder
forfeited. 23.4 The bid guarantee may be forfeited.
a) If a Bidder withdraws its bid a) If a Bidder withdraws its bid
during the period of bid during the period of bid validity
validity specified by the bidder specified by the bidder on the bid
on the bid Form: Form:
b) If a bidder refuses to accept b) If a bidder refuses to accept the
the contract or fails to contract or fails to commence the
commence the works works (including supplies within
(including supplies within thirty days of letter of award of
thirty days of letter of award of contract)
2. Part –I 86.0 Terms of Payment 86.0 Terms of Payment
General The payment for materials to be The payment for materials to be
Conditions of supplied and erected shall be made supplied and erected shall be made as
Contract/ as under only after execution of the under only after execution of the
Clause 86.0 contract documents/furnishing of contract documents/furnishing of
and its sub- Security Deposit and on execution of Security Deposit and on execution of
clauses transmission line work. transmission line work.
86.1 For supply
86.1 For Supply
86.1.1 Interest Bearing Advance
(i) Interest Bearing Advance
(Optional*): Ten percent (10%) of the
total Ex-works price component of
Tower / Tower Parts (including Bolts
& Nuts) and all other materials shall
be paid as an interest bearing initial
advance, at the rate of interest as per (ii)
below, after signing the Contract
Agreement and on submission of the
(a) Proforma invoice(s),
(b) Advance Bank Guarantee for [{110%
(one hundred ten percent) of the amount
of Advance}], from a Public Sector
Indian bank/Scheduled, Commercial
Bank in the form attached herewith as
Annexure-i (The guarantee shall be
initially valid up to 90 days after the Time
of Completion and shall be reduced at
the end of every Quarter prorata to the
advance adjusted),
(c) Performance Securities in line with
GCC Clause 40.0 including its sub-
Provided further that the Proforma
Invoice(s) for advance payment along
with all supporting documents is
submitted by the Contractor to the
Employer within 3 months from the date
Seal & Signature of Bidder
of Letter/ Notification of Award. In case
the Contractor does not submit the
requisite documents including applicable
Bank Guarantee(s) /Security(ies) within
the aforesaid period, the advance shall
not be payable. The Contractor shall,
within 7 days from the date of receipt of
Advance, furnish an Advance Receipt
Voucher to the Employer, as prescribed
under the GST Law.
Note: * This payment is an optional
payment. The Contractor has the option
of taking the interest bearing initial
advance or otherwise. The option for
advance payment is to be indicated by
the bidder in its bid as per the format
attached herewith as Annexure–iii and
shall be deemed to be part of the
bidding scheduled referred as
SCHEDULED-21 to be submitted by the
bidder with Technical bid.
(ii) Interest rate applicable on advance
payment to the Contractor shall be at the
rate equal to one-year MCLR rate [One-
year Tenor rate p.a.] published by State
Bank of India prevailing as on the date
of drawl of advance. The said interest
rate shall remain fixed and shall be
applicable till the advance amount is
fully repaid. The interest will be charged
considering proportionate adjustment of
advance against progressive payment
as per 86.1.2 below. The interest shall
be calculated on the daily progressive
balances outstanding as on the date of
recovery/adjustment. It is the Employer’s
understanding that as per extant
provisions, GST is not payable on
interest paid on the amount of Advance.
The Contractor is, however, advised to
check the position from their own
sources. If payable even at later stage,
the same shall be to the Contractor’s
account and Employer shall not
reimburse any GST on this account.
Recovery of this advance shall be
adjusted in such a way that that all the
sums of advance with interest thereon
shall be fully recovered 3 months prior to
the scheduled Time of Completion,
failing which the whole amount of
advance along with interest thereon
shall be recovered immediately from the
Seal & Signature of Bidder
payments due to the Contractor.
The contractor may however, return /
pay to GETCO the unadjusted advance
amount at any stage during the
execution of the work along with the
accrued interest thereon till the time of
return / payment. Alternatively, the
contractor may also request GETCO for
early adjustment of the advance along
with accrued interest.
Further, the Contractor shall submit the
certificate of Tax Deduction at Source
(TDS) on interest within 3 months from
the end of the quarter in which
adjustment of advance has been made
for claiming refund from Employer. No
claim for refund will be entertained after
end of the aforesaid period of 3 months.
Further, while submitting the TDS
Certificate the details of Contract No,
Project, Region, Quarter etc to which the
TDS certificate pertains, shall also be
submitted tallying the amount with the
TDS Certificate.
In case, the Contractor opts not to take
interest bearing advance as above, it
would be mandatory for him to submit
the documents listed at Sl. No. (i) (c)
above within twenty-eight (28) days of
issuance of Letter/ Notification of Award.
86.1.2 Progressive Payments
(i) 80% of supply value for each (i) (a) 70 % of supply value for fabricated
consignment of material on tower parts & stubs and 80% of supply
submission of invoice along with value for all other line material, hardware
100% GST, duties, F & I shall be and accessories etc. if contractor opts to
paid within 30 days from the actual take interest bearing initial advance or
material receipt date mentioned in
SR Note after verifying the following (b) 80% of supply value instead of 70%
documents by field office and duly of supply value for fabricated tower parts
recorded. & stubs and 90% of supply value
instead of 80% of supply value for all
A. Tax invoice. other line material, hardware and
B. Delivery challan. accessories etc., if contractor opts not
C. Endorsed RR / LR copy. to take interest bearing initial advance or
D. Dispatch clearance certificate / has opted to take interest bearing initial
letter wherever applicable. advance but the advance payment has
E. E Way Bill, if applicable become inadmissible for each
consignment of material on submission
of invoice along with 100% GST, duties,
Seal & Signature of Bidder
F & I shall be paid within 30 days from
the actual material receipt date
mentioned in SR Note after verifying the
following documents by field office and
A. Tax invoice.
B. Delivery challan.
C. Endorsed RR / LR copy.
D. Dispatch clearance certificate / letter
wherever applicable.
E. E Way Bill, if applicable
(ii) 10% payment out of balance 20% (ii) 10% of the of supply value for
of supply value shall be paid on fabricated tower parts & stubs shall be
completion of erection & testing of paid progressively on completion of
the transmission line and completion erection of complete tower (including
certificate from Engineer-in-charge tack welding and earthing) and
and Chief Engineer (Procurement & furnishing of completion certificate from
Contracts)) or equivalent. Engineer-in-charge and Chief Engineer
(iii) Balance 10% of supply value (iii) Balance 10% of supply value shall
shall be paid on successful be paid on quarterly basis on erection
commissioning of transmission line (including stringing) of transmission line
against completion certificate and in stretches cumulatively not less than
only after settlement of material 10% of original length of line in all
account statement of items supplied, respects and rectification of
used, erected and successful defects/deficiencies of corresponding
commissioning is settled for complete stretch on progressive basis and on
lot and balance 10% will be release completion certificate from Engineer-in-
only after passing of final bill. No charge and Chief Engineer (Projects).
extra payment will be released for This payment shall be released on
the tower materials and line submission along with the invoice for
materials which are not required first such payment, of an unconditional &
for completion of line if supplied irrevocable Bank Guarantee of 10% of
excess during execution of work contract price of supply portion, initially
and recovery will be made in final valid till 3 months beyond the scheduled
bill accordingly. date of completion of testing &
commissioning of the transmission line
and its taking over by the GETCO and
shall be extended from time to time till
the actual date of successful completion
of testing & commissioning of line and its
taking over by the GETCO.
GETCO should accept the Tower and
line materials if excess as per
approved check survey only. No
other payment will be made and no
other material shall be accepted.
(iv) Welfare Cess (iv) Welfare Cess
The modality of payment/ The modality of payment/
reimbursement of welfare cess will reimbursement of welfare cess will be
be as under. as under.
On receipt of A/T, the contractor / On receipt of A/T, the contractor /
bidder will get them registered bidder will get them registered under
Seal & Signature of Bidder
under Welfare Cess Act and submit Welfare Cess Act and submit the
the documentary evidence to the documentary evidence to the concern
concern office. office.
Before release of payment of first Before release of payment of first
R.A.Bill, the contractor has to R.A.Bill, the contractor has to submit
submit the documentary evidence the documentary evidence of
of registration. Only thereafter, the registration. Only thereafter, the bill
bill will be processed for payment. will be processed for payment.
Before release of payment of Before release of payment of
subsequent R.A.Bills, the contractor subsequent R.A.Bills, the contractor
has to submit the documentary has to submit the documentary
evidence of payment of welfare evidence of payment of welfare cess
cess of previous R.A.Bill. of previous R.A.Bill.
Before release of payment of Final Before release of payment of Final
Bill, the contractor has to submit the Bill, the contractor has to submit the
documentary evidence of payment documentary evidence of payment of
of welfare cess of previous R.A.Bill welfare cess of previous R.A.Bill as
as well as the final bill. well as the final bill.
If the R.A.Bill happens to be first If the R.A.Bill happens to be first and
and final bill, then before release of final bill, then before release of
payment, contractor has to submit payment, contractor has to submit
documentary evidence of documentary evidence of registration
registration under Welfare Cess Act under Welfare Cess Act and evidence
and evidence of payment of welfare of payment of welfare cess.
cess. The welfare cess shall be
The welfare cess shall be reimbursed to the contractor on
reimbursed to the contractor on submission of copy of documentary
submission of copy of evidence of payment by observing
documentary evidence of due formalities.
payment by observing due
86.2 For Erection works.
86.2 For Erection works.
86.2.1 A. Survey
Payment for survey shall be paid on pro-
rata basis on completion of survey and
approval of the same by the Employer.
86.2.1 B. Interest Bearing Initial
Advance (Optional ^^) Ten percent
(10%) at the rate of interest as per
86.2.1 B.1 1st Installment of 05%
(Five) of the total Installation price
component (excluding the price
component for survey) shall be paid on
Establishment of Contractor’s site
offices, commencement of stub setting
work & certification by Project Manager
that satisfactory mobilization for erection
exists and on submission of the
Seal & Signature of Bidder
(a) Proforma invoice,
(b) Advance Bank Guarantee for [{110%
(one hundred ten percent) of the amount
of Advance} Plus {amount of GST
reimbursable on Advance as per the
Proforma invoice}] from a Public Sector
Indian bank/Scheduled, Commercial
Bank in the form attached herewith as
Annexure-i (The guarantee shall be
initially valid up to 90 days after the Time
of Completion and shall be reduced at
the end of every Quarter prorata to the
advance adjusted),
(c) Performance Securities in line with
GCC Clause 40.0 including its sub-
86.2.1. B.2 2nd Installment of 05%
(Five)^^ of the total Installation price
component (excluding the price
component for survey) shall be paid on
commencement of stringing activities &
certification of the same by Project
Manager and on submission of the
(a) Proforma invoice(s),
(b) Advance Bank Guarantee for [{110%
(one hundred ten percent) of the amount
of Advance} Plus {amount of GST
reimbursable on Advance as per the
Proforma invoice}] from a Public Sector
Indian bank/Scheduled, Commercial
Bank in the form attached herewith as
Annexure-i (The guarantee shall be
initially valid up to 90 days after the Time
of Completion and shall be reduced at
the end of every Quarter prorata to the
advance adjusted),
(c) Performance Securities in line with
GCC Clause 40.0 including its sub-
(d) A declaration by the Contractor
stating that 1st Installation (5%) of
advance has been utilized against the
mobilization works for the subject
Seal & Signature of Bidder
Recovery of this advance shall be
adjusted in such a way that that all the
sums of advance with interest thereon
shall be fully recovered 3 months prior to
the scheduled Time of Completion,
failing which the whole amount of
advance along with interest thereon
shall be recovered immediately from the
payments due to the Contractor.
The contractor may however, return /
pay to GETCO the unadjusted advance
amount at any stage during the
execution of the work along with the
accrued interest thereon till the time of
return / payment. Alternatively, the
contractor may also request GETCO for
early adjustment of the advance along
with accrued interest.
Note: ^^ This payment is an optional
payment. The Contractor has the option
of taking the interest bearing advance or
otherwise. The option for advance
payment is to be indicated by the bidder
in its bid as per the format attached
herewith as Annexure–iii and shall be
deemed to be part of the bidding
scheduled referred as SCHEDULE-21 to
be submitted by the bidder with
Note: After release of various advances,
the rate of recovery of the advance shall
be re-adjusted.
Provided further that the Proforma
Invoice(s) for advance payment along
with all supporting documents as per
para B.1 and B.2 above is submitted by
the Contractor to the Employer within
months from the date of fulfillment of the
requisite activities, as per the L2
network. In case the Contractor does not
submit the requisite documents including
applicable Bank Guarantee(s)/
Security(ies) within the aforesaid period,
the advance at B.1 & B.2 above shall not
Seal & Signature of Bidder
The Contractor, shall, within 7 days from
the date of receipt of Advance, furnish
an Advance Receipt Voucher to the
Employer, as prescribed under the GST
86.2.1 B3. Interest rate applicable on
advance payment to the Contractor shall
be at the rate equal to one year MCLR
rate [One-year Tenor rate p.a.]
published by State Bank of India
prevailing as on the date of drawl of
advance. The said interest rate shall
remain fixed and shall be applicable till
the advance amount is fully repaid. The
interest will be charged considering
proportionate adjustment of advance
against progressive payment for the
work done as per 86.2.2 below. The
interest shall be calculated on the daily
progressive balances outstanding as on
the date of recovery/adjustment. It is the
Employer’s understanding that as per
extant provisions, GST is not payable on
Interest paid on the amount of Advance.
The Contractor may, however, advised
to check the position from their own
sources. If payable, the same shall be to
the Contractor’s account and Employer
shall not reimburse any GST on this
Further, the Contractor shall submit the
certificate of Tax Deduction at Source
(TDS) on interest within 3 months from
the end of the quarter in which
adjustment of advance has been made
for claiming refund from Employer. No
claim for refund will be entertained after
end of the aforesaid period of 3 months.
Further, while submitting the TDS
Certificate the details of Contract No,
Project, etc to which the TDS certificate
pertains, shall also be submitted tallying
the amount with the TDS Certificate.
In case, the Contractor opts not to take
interest bearing advance as above, it
would be mandatory for him to submit
the document listed at Sl. No. B1 (c)
and, B2(c) above within twenty-eight
(28) days of issuance of Letter /
Seal & Signature of Bidder
Notification of Award.
86.2.2 (i) (a) 70% payment if contractor
(i) 90% payment of amount claimed opts to take interest bearing mobilization
covering various activities such as
advance or (b) 80% payment instead of
excavation, foundation, tower
erection, earthing, tack welding 70% payment if contractor opts not to
stringing of conductor and OPGW take interest bearing mobilization
including insulator hoisting works advance or has opted to take interest
against R.A. bills duly certified by bearing initial mobilization advance but
EIC within 30 days from the date of the advance payment has become
R.A. bill. inadmissible, of amount claimed
covering various activities such as
excavation, foundation, tower erection,
earthing, tack welding stringing of
conductor and OPGW including insulator
hoisting works against R.A. bills duly
certified by EIC within 30 days from the
date of R.A. bill.
86.2.2 (ii) 10% of erection value shall be
paid in three equal parts, each on
physical construction and erection of
33% of line work including stringing of
the Transmission Line, complete in all
respects, including rectification of
defects/deficiencies on the line and
certificate from Engineer-in-charge and
Chief Engineer (Projects).
86.2.3. Balance 10% of erection value
(ii) 10% of erection value shall be shall be paid against commissioning of
paid against commissioning of transmission line only after settlement of
transmission line only after material account statement of items
settlement of material account supplied, used, erected and successful
statement of items supplied, used, commissioning of transmission line. The
erected and successful same amount will be released in final bill
commissioning of transmission line only and payment will be made only
the same amount will be release in after passing of final bill.
final bill only and payment will be
made only after passing of final bill.
(iii) Payment of ROW compensation Note: ROW is now proposed to be in the
amount will be given as below only scope of GETCO. Hence, this clause is
after submission of necessary
supporting documents.
1) 40% amount after completion
of foundation work
2) 40% amount after completion
of erection work
3) 20% amount after completion
of stringing work in all
List of supporting documents:
Seal & Signature of Bidder
1) Copy of form-7/12
2) Parishisht ‘A’ and ‘B’ of GoG
3) Document of Online Jantri
Rate of respective Survey No.
If online Jantri Rates are not
available, then land cost shall
be certified by competent
Revenue Authority.
4) Copy of APMC rate based on
which compensation is paid
towards damage of tree-crop
5) ‘Panchnama’ duly certified by
concern Sarpanch / Talati /
Mamlatdar or concern
Revenue Authority
6) Documents for the
compensation cost paid to
Govt. Trasurer as per GoG
Tharav for the line passing
through Govt. Waste Land. /
Govt. Organization.
(iv) Welfare Cess
(iv) Welfare Cess
The modality of payment/
The modality of payment/ reimbursement of welfare cess will be
reimbursement of welfare cess will as under.
be as under. On receipt of A/T, the contractor /
bidder will get them registered under
On receipt of A/T, the contractor / Welfare Cess Act and submit the
bidder will get them registered documentary evidence to the concern
under Welfare Cess Act and submit office.
the documentary evidence to the Before release of payment of first
concern office. R.A.Bill, the contractor has to submit
Before release of payment of first the documentary evidence of
R.A.Bill, the contractor has to registration. Only thereafter, the bill
submit the documentary evidence will be processed for payment.
of registration. Only thereafter, the Before release of payment of
bill will be processed for payment. subsequent R.A.Bills, the contractor
Before release of payment of has to submit the documentary
subsequent R.A.Bills, the contractor evidence of payment of welfare cess
has to submit the documentary of previous R.A.Bill.
evidence of payment of welfare Before release of payment of Final
cess of previous R.A.Bill. Bill, the contractor has to submit the
Before release of payment of Final documentary evidence of payment of
Bill, the contractor has to submit the welfare cess of previous R.A.Bill as
documentary evidence of payment well as the final bill.
of welfare cess of previous R.A.Bill If the R.A.Bill happens to be first and
as well as the final bill. final bill, then before release of
If the R.A.Bill happens to be first payment, contractor has to submit
and final bill, then before release of documentary evidence of registration
payment, contractor has to submit under Welfare Cess Act and evidence
documentary evidence of of payment of welfare cess.
registration under Welfare Cess Act The welfare cess shall be reimbursed
and evidence of payment of welfare to the contractor on submission of
cess. copy of documentary evidence of
The welfare cess shall be payment by observing due formalities.
reimbursed to the contractor on
Seal & Signature of Bidder
submission of copy of documentary
evidence of payment by observing
due formalities.
3. Part –I 2.0 Tender Fee 2.0 Tender Fee
Special The tender fee plus GST as The tender fee plus GST as
Conditions of applicable specified in notice applicable specified in notice
Contract/ inviting tender is payable by inviting tender is payable by
Clause 2.0 Demand Draft (DD) at Demand Draft (DD) at Vadodara
Vadodara drawn on any drawn on any Scheduled Bank in
Scheduled Bank in favour of favour of Gujarat Energy
Gujarat Energy Transmission Transmission Corporation Ltd.
Corporation Ltd. The same The same will be furnished in
will be furnished in Cover-1 of Cover-1 of Bid along with EMD
Bid along with EMD (Bid (Bid Security).
Payment of Tender fee
accepted by RTGS / NEFT /
4. Part –I 5.0 Additional Documents: 5.0 Additional Documents:
Special Apart from various documents to be Apart from various documents to be
Conditions of furnished along with the Bid as furnished along with the Bid as required
Contract/ required in the GCC and ECC, the in the GCC and ECC, the following
Clause 5.0 following documents/details are to be documents/details are to be furnished by
and its sub- furnished by the Bidder: the Bidder:
clauses 1. GST Registration No. and 1. GST Registration No. and date
date 2. Registration. No. under Shops &
2. Registration. No. under Establishment Act/ issuing
Shops & Establishment Act/ authority
issuing authority 3. Details of Partners/Directors of
3. Details of Partners/Directors the Firm/Company.
of the Firm/Company.
4. Experience Record and 4. Experience Record and details of
details of orders pending / orders pending / executed for
executed for various utilities various utilities
5. Last five years Audited 5. Last five years Audited Accounts
Accounts 6. Detail of Manufacturing/
6. Detail of Fabrication facilities along with
Manufacturing/Fabrication list of Testing Equipment
facilities along with list of calibrated up to date. The detail
Testing Equipment for the same may be submitted.
calibrated up to date. The 7. Factory Registration / License
detail for the same may be details
8. P.F registration
7. Factory Registration /
License details
8. Solvency certificate from
Bank (20 % of Bid value).
9. P.F registration
5. Part –I 10.0 PENALTY FOR DELAY: 10.0 LIQUIDATED DAMAGES (LD)
(SCC)/ FOR DELAY:
Conditions of 10.1 The tenderer should note that 10.1 The tenderer should note that the
Contract/ the completion time allowed for completion time allowed for carrying out
Clause 10.0 carrying out the work should be
Seal & Signature of Bidder
and its sub- strictly observed. Any delay that may the work should be strictly observed.
clauses take place in supply and erection Any delay that may take place in
beyond Contractual cut-off date achieving Completion of the works
stated as per stipulated delivery
beyond Contractual Time of Completion
period shall be subject to the penalty
at the rate of ½ % of the contract in the Contract shall be subject to
value per week plus GST as Liquidated Damages (LD), and not by
applicable on delayed work (supply way of penalty, at the rate of ½ % of the
and erection work) with a ceiling of Contract Price plus GST as applicable,
10% of the total contract value plus per week or part thereof of the delay
GST as applicable. subject to a ceiling of 10% (ten percent)
of the Contract Price plus GST as
10.2 In event of failure of the applicable.
Contractor to pay the amount of 10.2 In cases where the Completion of
Penalty as demanded, the Owner the works/ along with supplies extend
shall be entitled to deduct the beyond the contractual completion
amount of Penalty for delay from period, without prejudice to any other
the amounts payable to the right that it may have under the Contract
Contractors under any bills raised
or in law, the Owner shall be entitled
under this contract or any other
amount payable under any other to deduct the amount of LD from the
contract with the GUVNL and its amounts payable to the Contractors
Subsidiary companies i.e. GETCO, under any bills raised under this
GUVNL, GSECL, MGVCL, DGVCL, Contract or any other amount payable
PGVCL, UGCVL. It is permissible for under any other contract with the
the Owner to adjust the amount of
GUVNL and its Subsidiary companies
Penalty of delay against any Bank
Guarantee furnished by the i.e. GETCO, GUVNL, GSECL, MGVCL,
Contractor under this contract or any DGVCL, PGVCL, UGCVL. It is
other contract with GUVNL and/or its permissible for the Owner to adjust the
subsidiary companies. amount of LD against any Bank
Guarantee furnished by the Contractor
under this contract or any other contract
with GUVNL and/or its subsidiary
10.3 Notwithstanding the provision of
Clause 10.2, if so requested by the
Contractor, amount from the RA bills,
pending settlement of Liquidated
Damages (LD), shall not be withheld/
retained by the Owner, if adequate
retention payment [over and above
security deposit/ Contract Performance
Guarantee (CPG)] remains to be
released as per Contract. In case, it is
not so, it shall be examined by the
Owner whether BGs/other securities
(excluding CPG/Security Deposit)
furnished by the Contractor are available
with GETCO, which have partly or fully
served their purpose, and can therefore
be utilized by GETCO to recover LD, if
finally levied. If available, it will be further
checked whether the contractor is willing
Seal & Signature of Bidder
to furnish a suitable undertaking
authorizing GETCO to retain those
BGs/security (for such value which along
with retention payments remaining with
GETCO is considered to be sufficient to
take care of maximum leviable LD) to be
kept valid till 6 months beyond the
anticipated completion of the works/
supplies under the Contract. If the
Contractor requests and gives the
undertaking as above and validity of BG
is suitably extended wherever required,
amount from RA bills, pending
settlement of LD, shall not be withheld/
retained on account of LD.
10.3 Tenderer shall have to supply
all materials to match with the
erection activities. 10.4 Tenderer shall have to supply all
materials to match with the erection
Seal & Signature of Bidder
BANK GUARANTEE FORM FOR ADVANCE PAYMENT
(For the purpose of verification/confirmation of this Bank Guarantee by the GETCO, the Bank
shall indicate 2 official email ids of the authorized signatories from Issuing Branch and also of
the designated higher office (Corporate Office, Zonal Office etc) in the covering letter of the
Bank forwarding the Bank Guarantee.)
Bank Guarantee No. …………………… Date...................
…………..[Name of Contract]…………………….
To: [Name and address of the Employer/ Owner]
Dear Ladies and/or Gentlemen,
We refer to the Contract ("the Contract") vide Letter of Award issued on ............ (insert date of the
letter of award)….by you (the Employer/ Owner) to M/s ................. (Name of Contractor) ..................,
signed on ..............(insert date of the Contract)…..... between you and M/s ................. (Name of
Contractor) ..................,
having its Principal place of business at ………....(Address of Contractor) ............................... and
Registered Office at ………....(Registered address of Contractor)
…….................….. (Indicate brief scope of work) ............................... for the complete execution of the
…… (insert name of Package along with name of the Project)……..
Whereas, in accordance with the terms of the said Contract, the Employer has agreed to pay or cause
to be paid to the Contractor an interest bearing Advance Payment against furnishing of an irrevocable
bank guarantee for an amount of ………………………..(Amount in figures and words) ……………which
is equal to [{110% (one hundred ten percent) of the amount of Advance} Plus {amount of GST
reimbursable on Advance as per the Proforma invoice, if applicable}].
By this letter we, the undersigned, ………(insert name & address of the issuing bank) ………, a Bank
(which expression shall include its successors, administrators, executors and assigns) organized
under the laws of .................................... and having its Registered/Head Office at …..…….(insert
address of registered office of the bank)……..... do hereby irrevocably guarantee repayment of
………….(Amount of the bank guarantee in figures and words)…………… upon the first demand of the
Employer without cavil or argument in the event that the Contractor fails to commence or fulfill its
obligations under the terms of the said Contract for reasons whatsoever.
Provided always that the Bank's obligation shall be limited to the amount of this Bank guarantee or an
amount equal to the outstanding balance of the Advance Payment and the accrued interest on the
Advance Payment, taking into account such amounts, which have been repaid by the Contractor from
time to time in accordance with the terms of payment of the said Contract, as certified by you.
This Guarantee shall remain in full force from the date upon which the said Advance Payment is
received by the Contractor up to ninety (90) days beyond the date on which the entire Advance
Payment along with the accrued interest if any due thereon has been fully adjusted in terms of the
Contract i.e., up to ninety (90) days beyond the date of Completion of the Facilities under the Contract.
This Guarantee may be extended from time to time, as may be desired by M/s. ………………………..
on whose behalf this Guarantee has been issued.
Any claims to be made under this Guarantee must be received by the Bank during its period of validity,
Seal & Signature of Bidder
i.e. upto ninety (90) days beyond the date of Completion of the Facilities by the Employer i.e. upto and
inclusive of ……………. (dd/mm/yy).
Notwithstanding anything contained herein:
1. Our liability under this Bank Guarantee shall not exceed _________ (value in
2. This Bank Guarantee shall be valid upto ________(validity date)__________.
3. We are liable to pay the guaranteed amount or any part thereof under this Bank Guarantee
only & only if we receive a written claim or demand on or before ________ (validity date)
For and on behalf of the Bank
[Signature of the authorised signatory(ies)]
Designation_______________________
Contact Number(s): Tel.______________Mobile______________
Common Seal of the Bank______________________
Contact Number(s): Tel.______________Mobile______________
1. For the purpose of executing the Bank Guarantee, the non-judicial stamp papers of appropriate
value shall be purchased in the name of Bank who issues the ‘Bank Guarantee’.
2. The Bank Guarantee shall be signed on all the pages by the Bank Authorities indicating their
POA nos. and should invariably be witnessed.
3. The Bank Guarantee should be in accordance with the proforma as provided. However, in
case the issuing bank insists for additional paragraph regarding applicability of ICC
publication No: 758, the following may be added at the end of the proforma of the Bank
Guarantee [i.e., end paragraph of the Bank Guarantee preceding the signature(s) of the
issuing authority(ies) of the Bank Guarantee]:
“This Guarantee is subject to Uniform Rules for Demand Guarantee, ICC publication No.
758 except that article 15(a) is hereby excluded.”
Seal & Signature of Bidder
Specification No: ACE(P&C)/Contracts/E-468/Uprating/220kV/S&E
Sub: Supply, Installation, testing & commissioning of conversion of 220kV Wagra -
Dahej(220kV) line-1 & 220kV Wagra - Haldarwa line-1 of Bharuch Circle with ACSR Zebra
Conductor into equivalent HTLS Conductor (Equivalent weight of Zebra Conductor with Higher
Option for Initial Advance (either Interest Bearing Initial Advance of No Initial Advance or No Initial
Chief Engineer (Procurement & Contracts)
Gujarat Energy Transmission Co. Ltd.,
Corporate office,
I. We have read the provision in the Bidding Documents regarding furnishing the option for
advance payment. Accordingly, as per clause GCC 86.1.1 (For Supply) and GCC 86.2.1 (b)
(For Erection) provided in Amendment-I of the Bidding Documents, we hereby confirm to opt
Interest Bearing Initial Advance:
Supply Portion: (Ref GCC 86.1.1) *
Erection Portion: (Ref GCC 86.2.1 (b)) *
* ‘Yes’ or ‘No’ to be filled up by the Bidder. ‘Yes” shall mean that Bidder has opted for the
Interest Bearing Advance and ‘No’ shall mean that Bidder has not opted for the Interest Bearing
Advance. If nothing is mentioned, it shall mean that Bidder has not opted for the Interest
Bearing Advance.
(Name of Authorized Signatory of Bidder)
Seal & Signature of Bidder
Specification No: ACE(P&C)/Contracts/E-468/Uprating/220kV/S&E
Sub: Supply, Installation, testing & commissioning of conversion of 220kV Wagra -
Dahej(220kV) line-1 & 220kV Wagra - Haldarwa line-1 of Bharuch Circle with ACSR Zebra
Conductor into equivalent HTLS Conductor (Equivalent weight of Zebra Conductor with Higher
In connection with above subject, I / we confirm that our firm is not declared in NCLT under
Insolvency & Bankruptcy Code. Further, I / we also agree that, if any found NCLT under
Insolvency & Bankruptcy Code, the offer shall be out rightly rejected without assigning any
reason thereof.
Signature of Authorized
Representative of Company/Agency
Name of bidder Company
Seal & Signature of Bidder
(On the letter pad of the company)
Specification No: ACE(P&C)/Contracts/E-468/Uprating/220kV/S&E
Sub: Supply, Installation, testing & commissioning of conversion of 220kV Wagra -
Dahej(220kV) line-1 & 220kV Wagra - Haldarwa line-1 of Bharuch Circle with ACSR
Zebra Conductor into equivalent HTLS Conductor (Equivalent weight of Zebra
Conductor with Higher Ampacity)
Declaration of Conflict of Interest
Additional Chief Engineer(Procurement & Contracts),
Gujarat Energy Transmission Corporation Limited,
8th Floor,Sardar patel Vidyut Bhavan,
Vadodara-390007
Ref: Tender Notice No…………………………………
With refrence to above your tender Notice No……………………………………………..
For the work of………………………………………………………………
We do not have any conflict of interest with any other bidder who has submitted the bid in
this tender as per tender clause.
Yours Faithfully,
Seal & Signature of Bidder
(On the letter pad of the company)
Specification No: ACE(P&C)/Contracts/E-468/Uprating/220kV/S&E
Sub: Supply, Installation, testing & commissioning of conversion of 220kV Wagra -
Dahej(220kV) line-1 & 220kV Wagra - Haldarwa line-1 of Bharuch Circle with ACSR
Zebra Conductor into equivalent HTLS Conductor (Equivalent weight of Zebra
Conductor with Higher Ampacity)
Declaration of Relationship with employee
Additional Chief Engineer(Procurement & Contracts),
Gujarat Energy Transmission Corporation Limited,
8th Floor,Sardar patel Vidyut Bhavan,
Vadodara-390007
Ref: Tender Notice No…………………………………
With reference to above your tender Notice No……………………………………………..
For the work of………………………………………………………………
“If in any Bidder Company/firm, the interest(i.e. shareholding in company and share in
partnership firm) of any employee of the tendering company or his/her relative as defined in
section 2(77) of the company’s Act 2013 is 10% or more, the tendering Company will not
deal with such Company/Firm at all.”
As per clause, we do not have any type of relationship with any current employees of the
tendering Company.
Yours Faithfully,
(Note: If you have any relationship with employee, give declaration as per tender clause.)
Seal & Signature of Bidder
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
8. EMD BG Format.pdf
2. Amendment -I Part-I Tender Specifications E-468.pdf
3. L2 HTLS 220kV Wagra Dahej line 1 n 220kV Wagra Haldarwa line 1.pdf
5. PB Part-III E-468.pdf
6. Tech Sepcification HTLS Eq to Zebra 220 kV_R6_Apr.2024.pdf
6.1 Addendum for core.pdf
7. Annexure I and IA.pdf
8. EMD BG Format.pdf
10. ONLINE SCHEDULE_TECH - E-468.pdf
11. Online Schedule-QR-E-468.pdf
12. Public Procurement Circular of GOI.pdf
13. Tower Schedule of 220KV Dahej Wagra Line.pdf
14. Tower Schedule of 220KV Haldarva Wagra line.pdf
15. Form of LD undertaking 1B.pdf
16. SD cum PBG Format.pdf
17. Form of LD undertaking 1A.pdf
1. Part-I Tender Spe. - Uprating of 220kV lines E-468.pdf
4. Tender Notice E-468.pdf
9. MAAT LA Networth Form.pdf
Download all tender documents and submit your bid