Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-AOC KUPPOL PERINGOME PO 670353 | PERINGOME | KANNUR | KERALA | 670353 | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.8 L+₹8,357.31 (2.23%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹4.3 L
EMD Value
₹10,640
Closing Date
6 Jul 2020, 5:00 pmClosed
EXECUTIVE ENGINEER,LSGD DIVISION,KANNUR
OFFICE OF THE EXECUTIVE ENGINEER,LSGD DIVISION,KAN
Kannur DP - Project No. 76/2020-21 GHS Thavidisseri Compound Wall in Peringome Vayakkara GP
2020_LSGD_368082_3
DB/TN/1/2020-21
Open Tender
Civil Works - Buildings
Item Rate
180 days
kannur
Please refer Tender documents.
7 documents required · 7 mandatory
₹962
Yes
online
₹10,640
Yes
1 Oct 2020
29 Jun 2020
9 Jul 2020
29 Jun 2020
6 Jul 2020
29 Jun 2020
Amount
Compound Wall
15.10.2 : Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually / by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge:In cement mortar
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.2.2 : Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.6 : Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
od729097/2020_2021 : Laterate masonry with neatly dressed laterate stone of size 35x20/20cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc.
od742338/2020_2021 : Laterite neatly dressed Departmental stones of size 35x20x20cm in cement mortar 1:6 for<br>foundation and basemen or nearest size in cement mortar 1:6 for foundation and basement including all<br>cost of materials, labour charges etc
13.1.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
10.25.2 : Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
13.61.1 : Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
od744547/2020_2021 : Making Name Board by using M S pipe, Angle and M S sheet; painted over with synthetic enamel paint; fixed in C C 1:2:4 including all charges of fabricating, letering etc. complete as per the direction of Engineer - in charge.
LAKSHMANAN P
Bidder Name
MOHANAN P
LAKSHMANAN P
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_520287.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .