| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-AOC | ₹2.2 Cr | L1 | Accepted-AOC Financial bid is Accepted at the price of Rs. 22453859.00 by the Employer. |
| 2 | L2₹2.5 CrRejected-Finance | ₹2.5 Cr | L2 | Rejected-Finance Due to L2 Rate |
| 3 | L3₹2.5 CrRejected-Finance 143 SHASTRI NAGAR LAKHIMPUR KHERI | ₹2.5 Cr | L3 | Rejected-Finance Due to L3 Rate |
| 4 | L4₹2.7 CrRejected-Finance | ₹2.7 Cr | L4 | Rejected-Finance Due to L4 Rate |
Tender Value
₹3.6 Cr
EMD Value
₹19.9 L
Closing Date
3 Feb 2026, 12:00 pmClosed
S.E.Sitapur/Kheri Circle PWD Sitapur
Office of the S.E.Sitapur/Kheri Circle PWD Sitapur
Widening and Strenghtening of Lilautinath Mandir Road Km 01 to Km 02 (330) in Dist Kheri
2026_CEUCZ_1108979_1
403/352C/E.TENDER/STP-LMP/25 Dt. 17-01-2026
Open Tender
Civil Works - Roads
365 days
Lakhimpur Kheri
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹19.9 L
Yes
Office of the S.E.Sitapur/Kheri Circle PWD Sitapur
20 Mar 2026
27 Jan 2026
3 Feb 2026
27 Jan 2026
3 Feb 2026
27 Jan 2026
2 Feb 2026
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.
Construction of subgrade and earthen Embankment with approved material obtained from borrow pits(carted earth) with all lift & lead up to 1 km, transporting to site, spreading,grading to required slope and compected to meet requirement of table 300-2.
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. Compaction Only
Scarifying the existing granular/ bituminous road surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres.
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing and applying primer coat with SS2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
Construction of subgrade and earthen shoulder with approved material obtained from borrowpits with all lifts and leads,spreading,grading to required slope and compected to meet requirement of table 300-2.(carted Earth)
Providing and applying tack coat with bitumen (VG-10) using Bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared surface cleaned with hydraulic broom .
Providing and laying bituminious concrete with 100 TPH batch type hot mix plant producing an average output of 75 tonne per hour using crushed aggregates of specified grading, premixed with bituminous binder as per job mix, transporting the hot mix to work site,laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H Specifications Clause 509 complete in all respects.
Bridge Portion Dismantling of existing structures,like culverts,bridges,retaining wall and other structure comprising of brick masonary,including unerviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.
Excavation for road work in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross ections, and transporting to the emb
Boring with 100 mm dia casing pipe for dewatering including cost of pipes , other materials, labour charges etc. complete.
Dewatering the ground water for trenches with hire,operational &fuel charges of pump with oprater complete
Sand filling in plingth including supply of necessary quantity of sand from a distance not exceeding 8 km. (5 miles) from the site of work and including watering, dressing etc. Rate to include cost of all materials. Labour and T&P etc required for proper completion of the work.
Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days.
Providing and laying reinforced cement concrete M 25 grade in superstructure as per drawing and technical specifications clauses 800, 1205.4 and 1205.5
Construction of un-reinforced, only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30 (Grade), coarse and fine aggregates conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete withshovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501.
Supplying fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and Technical Specifications clauses 1002, 1010 and 1202
Providing weep holes in Brick masonry/ Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical
Drainage Spouts complete as per drawing and Technical specification
Protection Work Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302
Cross Drainage Dismantling of existing structures,like culverts,bridges,retaining wall and other structure comprising of brick masonary,including unerviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling, concrete and masonary works in head walls and parapets.(350mm dia)
Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling, concrete and masonary works in head walls and parapets.(1000mm dia)
Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days.
Brick masonry work in 1:3 cement mortar in foundation complete excluding pointing and plastering as per drawing and technical speficiations clauses 600, 1202 & 1203.
Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification clauses 613.3 , 1204 and 1208.4
Plastering with cement mortar (1:3) 15 mm thick on brickwork in substructure/ superstracutre as per technical specification clauses 613.4 & 1204
Laying Inter Locking Tiles Providing and laying interlocking concrete block pavement having thickness 80 mm as per drawing and technical specification clause 1504 complete (excluding G.S.B).
Kilometer Hectometer Stone etc.
Diversion Construction of embankment with approved material obtained from borrow pits(carted earth) with a lift upto 1.5m & lead up to 1000 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 . as per Technical Specification clause 301.5
Supply and laying of RCC Hume pipe 600mm dia including cost of all material, carriage upto site, loading and unloading, all labour and taxes, work complete as per direction of E/I for cross drainage in route diversion.
Brick soiling with straight over burnt brick laid on edge and dry brick edging on both sides including preparation of sub grade to required camber, filling joints with local earth spreading blinding coats 1 cm. deep of local earth including all labour T&P etc required for proper completion of work.As Per SI No 762(b)
Routine maintinance Charge upto 5 years for any defect/damage found after construction of all works i/c restoration of paved surface, shoulders, culverts road furniture etc. complete as per direction of E/I First Year - 0 Second Year - @0.25 % of BOQ (Iteam No. 1 to 38)
Third Year @0.50 % of BOQ (Iteam No. 1 to 38
Fourth Year @0.75 % of BOQ (Iteam No. 1 to 38
Fifth Year @ 1.00 % of BOQ (Iteam No. 1 to 38
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
Tendernotice_2.pdf
PDF • 1.33 MB
BOQ_2047706.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid