| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.2 LAccepted-AOC | L1 | Accepted-AOC Accept | |
| 2 | L2₹10.5 L+₹33,197 (3.25%)Rejected-AOC VILLAGE DAK P O DAHAB TEHSIL FATEHPUR DISTT KANGRA H P 176051 | DAHAB | KANGRA | HIMACHAL PRADESH | 176051 | L2 | Rejected-AOC Reject | |
| 3 | L3₹11.1 L+₹93,602 (9.17%)Rejected-AOC | L3 | Rejected-AOC Reject | |
| 4 | L4₹11.5 L+₹1.3 L (12.4%)Rejected-AOC | L4 | Rejected-AOC Reject | |
| 5 | L5₹11.9 L+₹1.7 L (16.8%)Rejected-AOC | L5 | Rejected-AOC Reject |
Tender Value
₹11.4 L
EMD Value
₹22,800
Closing Date
26 Jun 2020, 5:00 pmClosed
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER HPPWD DIVISION FATEHPUR
Construction of formation cutting at R.D. 3/510 to 3/870 and providing and laying cement concrete pavement from R.D. 3/550 to 3/800
2020_PWD_37943_1
PWF/CB/II-C/TENDER/20-482-510 Dt 26-05-2020
Open Tender
Civil Works
Item Rate
60 days
FATEHPUR
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
EE FATEHPUR
₹22,800
13 Mar 2021
10 Jun 2020
27 Jun 2020
10 Jun 2020
26 Jun 2020
10 Jun 2020
Amount
Excavation in hilly area for road ways in all heights and depths and in all kind of soil by mannual/mechanical means including saturated soil comprising of ordinary soil, soft rock, hard rock, chieselling, wedging out of rock (where blasting is prohibited) and their intermediate classification of soil, setting out true to the required lines, grades, cutting and trimming of side slopes and level as shown in the drawing and as directed by Engineer-in-charge at site according to the MORD technical specification clause 302, 1603.1 and 1603.2 and sorting out useful materials and stacking the same in all leads and lifts in acquired width of road and transportation of un-useful material for filling in road ways, camber, embankments for grade improvements and disposal of all surplus material to required width of the road or on approved dumping sites through all modes of transportation including head load or animal transport or mechanical means along with its leveling fine dressing and carriage of machineries, materials, tools, equipment and safety measured and other incidentals necessary to complete the work by mechanical means and labour. Recovery of stones to the tune of 69.34 cubic meter quantity @ 300/- only ( at the rate of Rupees three hundred only) per cubic meter shall be effected from the contractors running bills on pro-rata basis as per actual quantity executed. Any loss to the public, private property during the course of execution shall be the absolute responsibility of the contractor, which shall have to be compensated by him in all cases including carriage of material with in all leads and lifts.
Excavation in hilly area in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of cut material with in any leads and lifts as per Clause 1603.2 as per the direction of the Engineer-in-Charge . Including carriage of material within all leads and lifts and other incidental . The rate is including of octroi, royality, Malkana, toll tax, sale tax GST or other taxes imposed by the Government.
Construction of embankment with approved materials deposited at site from road way cutting and excavation from drains and foundations of other structures or other sources graded and compacted in 200mm( two hundred millimetes) thickness in every layers and compacted with three Wheel Road Roller 80-100 ( eighty-hundred ) KN static weight roller to meet the requirement of tables 300.1 and 300.2 as per M.O.R.D. technical specification Clause 301.5 and as per direction of the Engineer- In –Charge including carriage of materials within all leads and lifts and other incidental . The rate is including octroi, royality, Malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Providing and laying granular sub-base/base/surface with well graded material, spreading in uniform layers with motor grader on prepared surfaces mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density, complete as per technical specification clause-401.4 for Grading-I material, as per the entire satisfaction and direction of Engineer-in-charge. The rate is including octori, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Providing and laying mechanically mixed and vibrated plain cement concrete in open foundation for all type of structure complete of nominal mix 1:4:8 ( One cement isto four sand isto eight graded crushed/ broken stone aggregate 40mm ( forty millimeter) nominal size in or under water including curing complete and pumping or bailing out water, dewatering, removal of slush as required at site which may arise at the time of laying under water complete for all heights/ depths including the cost of form work complete in all respect as per drawing and M.O.R.D. technical specification sections 800, 900 & 1700 and as per the entire satisfaction and direction of the Engineer –in-Charge and carriage of materials within all lead, and lifts and other incidental . The rate is including of octroi, royality, Malkana, toll tax, sale tax, GST or other taxes imposed by the Government
Providing and laying mechanically mixed and vibrated concrete for plain/ reinforced concrete in open foundation for all type of structure complete of plain cement concrete grade M-20 (M- twenty) nominal mix 1:2:4 (One cement isto two sand isto four graded crushed/broken stone aggregate 20mm (twenty millimeter) nominal size in or under water and curing complete including pumping or bailing out water , dewatering removal of slush as required at site which may arise at the time of laying under water complete for all heights/ depths including the cost of form work as per drawings and M.O.R.D. technical specification Clause 802,803,1202 and 1203 as per the direction of the Engineer-in-Charge . Including carriage of material within all leads and lifts and other incidental . The rate is including of octroi, royality, Malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
MUNISH KUMAR
KARAN BIR
DILRAJ SINGH
KARAN DEV
Bhiwani Singh
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .