Loading…
Loading…
Tender Value
₹86.0 L
EMD Value
₹1.7 L
Closing Date
8 Jul 2026, 6:00 pm3d left
Executive Engineer
BC Road Jammu
As refer BOQ
2026_PHE_313970_4
e-NIT No. 10 of 2026-27
Open Tender
Civil Works
45 days
BC Road Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Executive Engineer
₹1.7 L
B.C. Road Jammu
29 Jun 2026
29 Jun 2026
9 Jul 2026
29 Jun 2026
8 Jul 2026
1 Jul 2026
30 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meters lead | 480.49 | Sqm | 38.9 | ₹18,691.06 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspitsand the like not exceeding 10 sqm on plan, including dressing of sides andrammingofbottoms liftupto 1.5m, including getting out excavated earth and disposal of surplus excavatedearthas directed | 1,248.73 | cum | 479.3 | ₹5,98,516.29 |
| 3 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm indepth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto1.5m, as directed by Engineer-in-Charge All kinds of soil: | 87.49 | cum | 592.9 | ₹51,872.82 |
| 4 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includingdisposal of excavated earth lead upto 50meters and lift upto 1.5 m,as directed by Engineer-in-Charge. | 966 | cum | 187.3 | ₹1,80,931.8 |
| 5 | Excavation in dumped stones or malba including stacking of serviceable and unserviceable material separately and disposal of unserviceable material lead upto 50 m and lift upto 1.5 m, disposed material to be neatly dressed | 97 | cum | 517.9 | ₹50,236.3 |
| 6 | Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive | 151.91 | cum | 189.2 | ₹28,741.37 |
| 7 | Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : All Kind of soils | 45.26 | cum | 89.75 | ₹4,062.09 |
| 8 | 2nd Lift - 3.00 to 4.50 Mtr | 52.43 | cum | 179.5 | ₹9,411.19 |
| 9 | 3rd Lift 4.50 to 6.00 Mtr | 34.33 | cum | 269.25 | ₹9,243.35 |
| 10 | 4th Lift 6.00 to 7.00 Mtr | 22.89 | cum | 359 | ₹8,217.51 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.86 MB
BOQ_1016376.xls
BOQ • 0.33 MB
10.pdf
PDF • 0.36 MB
Download all tender documents and submit your bid