Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.7 CrAdmitted-Finance | -3.31% | ₹9.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹10.2 Cr+₹55.2 L (5.71%)Admitted-Finance | +2.21% | ₹10.2 Cr+₹55.2 L (5.71%) | L2 | Admitted-Finance |
Tender Value
₹10.0 Cr
EMD Value
₹20.0 L
Closing Date
10 Jun 2026, 6:00 pmClosed
Executive Engineer
KDA Kota
Civil Work
2026_UITKo_560253_1
NIT 02/2026-27 (39)
Open Tender
Civil Works
Percentage
365 days
Kota
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,500
7500 Secrectry KDA, 2500 MD RISL
₹20.0 L
Yes
22 Jun 2026
18 May 2026
11 Jun 2026
18 May 2026
10 Jun 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge. 1: 3: 6 or richer mix. | 723.45 | Cum | 637 | ₹4,60,837.65 |
| 2 | Dismantling Stone Masonry as per MoRTH Specification Clause 202.Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per MoRTH Specification Clause 202. | 150 | Cum | 195 | ₹29,250 |
| 3 | Dismantling of FencingDismantling of barbed wire fencing / wire mesh fencing including posts, foundation concrete, backfilling of pit by manual means including disposal of dismantled material with all lifts and upto a lead of 1000 m, stacking serviceable material and unserviceable material separately as per MoRTH Specification Clause 202. | 100 | Mtr | 31 | ₹3,100 |
| 4Dismantling Brick/Tile WorkDismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per MoRTH Specification Clause 202.Cement mortar | |||||
| 4.1 | In cement mortar | 500 | Cum | 195 | ₹97,500 |
| 5Dismantling doors, windows and clearstory windows steel or wood shutter including chowkhats and holdfasts etc. complete and stacking within 50 meters lead: | |||||
| 5.1 | Of area exceeding 3 square meter. | 50 | Each | 144 | ₹7,200 |
| 6Taking out doors, windows and clearstory windows shutters (steel or wood) including stacking within 50 meters lead:Of area exceeding 3 square meter. | |||||
| 6.1 | G.S. Sheet | 90 | Each | 55 | ₹4,950 |
| 7 | Dismantling stone slab roofing over wooden karries and battens (dismantling karries and battens to be paid for separately) including stacking of serviceable material and disposal of unserviceable material within 50 meter lead: | 100 | Sqm | 700 | ₹70,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
Bid_Potential_Redevelopment_Kaithonipole.pdf
Tender Documents • 31.67 MB
BOQ_997273.xls
BOQ • 0.59 MB
CorrigendumNIT02.pdf
PDF • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .