| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹9.4 L
EMD Value
₹18,805
Closing Date
14 Feb 2022, 1:00 pmClosed
DGM(T)Contract Delhi transco ltd rajghat
DGM(T)Contract Delhi Transco ltd Rajghat
Exterior Interior finishing/painting work in officers flat at C-52 New Friends colony and C-5 Sufderjung Development Area DTL.
2021_DTL_211917_4
T21P131366
Limited
Civil Works
Works
60 days
DGM(T)Contract Delhi transco ltd
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹18,805
Yes
14 Feb 2022
4 Feb 2022
14 Feb 2022
4 Feb 2022
14 Feb 2022
4 Feb 2022
From item no 1 to 15:- Exterior & Interior finishing/painting work in officers flat at C-52 New Friends colony and C-5 Sufderjung Development Area DTL.
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length ( hold fast lugs or dash fastener shall be paid for separately). Kiln seasoned and chemically treated hollock wood
Providing and fixing to existing door frames. 30 mm thick Fiberglass Reinforced Plastic (F.R.P.) flush door shutter in different plain and wood finish made with fire retardant grade unsaturated polyester resin, moulded to 3 mm thick FRP laminate all around, with suitable wooden blocks inside at required places for fixing of fittings and polyurethane foam (PUF)/Polystyrene foam to be used as filler material throughout the hollow panel, casted monolithically with testing parameters of F.R.P. laminate conforming to table - 3 of IS: 14856, complete as per direction of Engineer-in-charge.
Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade: Two or more coats on new work.
Providing and applying white cement based putty of average thickness1 mm, of approved brand and manufacturer, over the plastered wallsurface to prepare the surface even and smooth complete.
Removing dry or oil bound distemper water proofing cement paint like scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade: One or more coats on old work
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade. - One or more coats on old work
French spirit polishing :One or more coats on old work
Finishing walls with Acrylic Smooth exterior paint of required shade : Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface
Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge. With cement mortar 1:4 (1cement: 4 coarse sand)
Renewing glass panes, with putty and nails wherever necessary including racking out the old putty: Float glass panes of nominal thickness 4 mm (weight not less than 10kg/sqm)
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer in-charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding.
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
Provision for unforseen DSR-Items (In this item quantity represents cost of items based on DSR - 2018 excluding cost index and rate represents multiplying factor by which quantity i.e. cost of DSR items be increased or decreased. Example : a) for 5% above on DSR items rate shall be 1.05, a) for 5% below on DSR items rate shall be 0.95 etc)
MS L.D.SULANIA AND CO.
D D Infratech
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .