| 1 | L1₹19.5 LAccepted-AOC | L1 | Accepted-AOC 1st lowest | |
| 2 | L2₹20.6 L+₹1.1 L (5.45%)Rejected-AOC | L2 | Rejected-AOC 2nd lowest |
Tender Value
₹19.6 L
EMD Value
₹49,000
Closing Date
3 Sept 2020, 10:00 amClosed
Executive Engineer PVIP Division No.2 Aluva
Executive Engineer PVIP Division No.2 Aluva Thottakattukara
Construction of bridge
2020_Irrig_378126_1
ET-03/EE2/PVIP/2020-2021
Open Tender
Civil Works - Others
Item Rate
Near Avisenna school, Vazhakulam Grama Panchayath
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,800
Yes
online
₹49,000
Yes
14 Oct 2020
20 Aug 2020
8 Sept 2020
20 Aug 2020
3 Sept 2020
20 Aug 2020
20 Aug 2020 - 3 Sept 2020
Amount
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix) etc complete as per directipon of departmental officers at site
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete as per directipon of departmental officers at site
od10324/2020_2021/P2 : Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 1.50 m including labour dismantling the bund after completion of the work etc complete as per directipon of departmental officers at site
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil ,etc complete as per directipon of departmental officers at site
60.7.2 : DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) etc complete as per directipon of departmental officers at site
4.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) etc complete as per directipon of departmental officers at site
5.1.3 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) etc complete as per directipon of departmental officers at site
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size etc complete as per directipon of departmental officers at site
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more etc complete as per directipon of departmental officers at site
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete. etc complete as per directipon of departmental officers at site
4.3.3 : Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, piers, abutments, pillars, posts and struts etc complete as per directipon of departmental officers at site
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers etc complete as per directipon of departmental officers at site
5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform etc complete as per directipon of departmental officers at site
5.9.2 : Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc complete as per directipon of departmental officers at site
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) etc complete as per directipon of departmental officers at site
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per directipon of departmental officers at site
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) etc complete as per directipon of departmental officers at site
2.25 : Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. etc complete as per directipon of departmental officers at site
od10325/2020_2021/P2 : Engaging man coolies for clearing the canal etc complete as per directipon of departmental officers at site
8.12 : Providing and laying flamed finish Granite stone flooring in required design and patterns, in linear as well as curvillinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-charge.a. Flamed finish granite stone slab Jet Black, Cherry Red, Elite Brown, Cat Eye or equivalent. etc complete as per directipon of departmental officers at site
16.21 : Engraving letters in hard stone etc complete as per directipon of departmental officers at site
13.71 : Lettering with black Japan pint of approved brand and manufacture etc complete as per directipon of departmental officers at site
K S ABDUL KAREEM
Bidder Name
ABDULLAKUTTY
K S ABDUL KAREEM
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_536019.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .