Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 LAccepted-AOC 6 GOODS SHED ROAD TITAGARH KOLKATA 700119 | TITAGARH | NORTH 24 PARGANAS | WEST BENGAL | 700119 | L1 | Accepted-AOC Accepted. | |
| 2 | L2₹9.4 L+₹223 (0.02%)Rejected-Finance | L2 | Rejected-Finance Higher Bid Value. | |
| 3 | L3₹9.4 L+₹1,033 (0.11%)Rejected-Finance CHANDURIA SIMURALI DIST NADIA PIN 741248 | NADIA | WEST BENGAL | 741248 | L3 | Rejected-Finance Higher Bid Value. | |
| 4 | Rejected-Technical 86 TOLLYGUNGE CIRCULAR ROAD KOLKATA WEST BENGAL 700053 | KOLKATA | KOLKATA | WEST BENGAL | 700053 | - | Rejected-Technical Not-submitted all papers. | |
| 5 | Rejected-Technical SRINIKETAN ROAD BOLPUR BIRBHUM 731204 | BOLPUR | BIRBHUM | WEST BENGAL | 731204 | - | Rejected-Technical Not-submitted all papers. |
Tender Value
Refer Docs
EMD Value
₹18,787
Closing Date
27 Dec 2019, 3:00 pmClosed
Executive Engineer, PWD.
Office of the Executive Engineer, PWD, Jalpaiguri Electrical Division, Purta Bhavan, Hakimpara, PO and District-Jalpaiguri, PIN 753101.
Electrical Installation work of newly Constructed Store Beside Kalara river, Jalpaiguri District Hospital, Jalpaiguri-SITC of AC.
2019_WBPWD_259461_1
WBPWD/EE/JED/NIQ-29e/Q of 2019-20 .
Open Tender
A/C ORG
Item Wise
25 days
District Hospital
Please refer Tender documents.
2 documents required · 2 mandatory
₹18,787
26 Feb 2020
13 Dec 2019
30 Dec 2019
13 Dec 2019
27 Dec 2019
13 Dec 2019
Amount
Supply and Delivery of Split AC Machine (Make: Misthubhisi HEAVY DUTY , Daikin, O-General etc). Both Condensing and cooling coils should be made of copper tubes. (Mitshubishi HEAVY DUTY 1.9 TR MODEL- SRK24CS-S6/A, 2TR, 2 STAR / O-General 1.8 TR, Model ASGA22FTTC).
Supply & Fixing of 5/8" and 1/4" copper refrigerant pipes with nitrail rubber thermal insulation, 2 run 2.5 Sqmm 3 core unarmored copper cable and best quality PVC drain pipe incl fixing arrangement complete with high quality saddle in all respect upto 25TR split type AC machine
Installation, testing and commissioning of split type air conditioning machine upto 2.5TR with supply & fixing of necessary iron bracket, nut and bolts as per direction of EIC
Supply and Laying of extra drain water pipe as per requirement .
SNOW FLAKE
ROY REFRIGERATION
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .