Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹53,277.95Admitted-Fee/PreQual/Technical/Finance | -3.40% | ₹53,277.95 | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹64,529.19+₹11,251.24 (21.1%)Admitted-Fee/PreQual/Technical/Finance NEW HOUSE 22 12 P O SIJUA DHANBAD 828121 | DHANBAD | DHANBAD | JHARKHAND | 828121 | +17.00% | ₹64,529.19+₹11,251.24 (21.1%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹65,632.25+₹12,354.30 (23.2%)Admitted-Fee/PreQual/Technical/Finance | +19.00% | ₹65,632.25+₹12,354.30 (23.2%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹67,286.85+₹14,008.90 (26.3%)Admitted-Fee/PreQual/Technical/Finance AT MOHLIDIH BHULI PO BHULI DHANBAD 828104 | DHANBAD | JHARKHAND | 828104 | +22.00% | ₹67,286.85+₹14,008.90 (26.3%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹55,153
Closing Date
11 Sept 2026, 5:00 pmClosed
ACE, SIJUA
OFFICE OF ACE, SIJUA
Provision of Chabutra near tetulmudi naya more modidih under Sijua Area
2026_BCCL_364598_1
GM/SA/Civil/2026-27/eNIT-34
Open Tender
Civil Works - Others
Percentage
10 days
mudidih
AS PER NIT
3 documents required · 3 mandatory
Yes
12 Sept 2026
31 Aug 2026
12 Sept 2026
1 Sept 2026
11 Sept 2026
1 Sept 2026
1 Sept 2026 - 7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0Item Description/ Heading | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 3.69 | cum | 214.15 | ₹789.36 |
| 1.02 | Excavating, supplying and filling of local earth (including royalty) by mechanical transportupto a lead of 5km also including ramming and watering of the earth in layers notexceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 10.74 | cum | 299.7 | ₹3,219.08 |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost ofcentering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stoneaggregate 20 mm nominal size derived from natural sources). | 1.42 | cum | 6,086.45 | ₹8,654.93 |
| 1.04 | Brick work with common fly ash F.P.S. bricks of class desgn 7.5 in foundation and plinth in: CM 1:6 (1 cement : 6 coarse sand) | 4.31 | cum | 5,002.04 | ₹21,548.79 |
| 1.05 | 12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand) | 11.4 | sqm | 288.25 | ₹3,286.05 |
| 1.06 | 25 mm thick Cement concrete flooring 1:2:4 | 23.87 | sqm | 387.17 | ₹9,241.75 |
| 1.07 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.02 MB
finance_377517.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 3.11 MB
BOQ_377517.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .