Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹35.0 CrAdmitted-Finance 1 13 16 G KHAPARADEEH KOTHI CAMPUS CIVIL LINES AYODHYA UTTAR PRADESH 224001 | AYODHYA | AYODHYA | UTTAR PRADESH | 224001 | L1 | Admitted-Finance | ||
| 2 | L2₹35.7 Cr+₹73.7 L (2.11%)Admitted-Finance 274 CIRCULAR ROAD MEERUT CANTT MEERUT | MEERUT | MEERUT | UTTAR PRADESH | L2 | Admitted-Finance |
Tender Value
₹32.8 Cr
EMD Value
₹65.5 L
Closing Date
12 Sept 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE KDA KANPUR
KDA KANPUR
INTERNAL DEVELOPMENT WORK OF SECTOR 2 JAWAHARPURAM
2022_UPKDA_725661_1
57/EE2/KDA/21-22
Open Tender
Civil Works
Percentage
550 days
KANPUR NAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
FC
₹65.5 L
7 Oct 2022
3 Sept 2022
13 Sept 2022
3 Sept 2022
12 Sept 2022
3 Sept 2022
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART -A (Site Prepration) | - | - | - | - |
| 2 | Cleaning of jungle including cutting of rank vegetation and disposal of waste upto 60 meter all complete as per drawing attached | 2,25,591 | SQM | 5 | ₹11,27,955 |
| 3 | E/W in cutting or in embankment in ordinary soil excavation to be done in form of regular pits not exceeding 1/2m in depth and work embankment to be in 20cm layers including ramming and dressing the surface to required level and slopes and also including 1.5m lift and 30m lead. the earth from cutting to be used in embankment or to beposited as spoil banks with 30m distance as directed by the E/I including 20 km cartage as per calculation sheet attached. | 1,16,075 | CUM | 432.8 | ₹5,02,37,260 |
| 4 | Earth work in embankment mechanically compacted to 95% proctor density in ordinary soil exceeding to be done from regular pits not exceeding 1/2M. In depth and work embankment to be 20cm layers including ramming and dressing pulverization the surface to required levels and slopes and also including 1.5Mlift and 30 M lead . The earth from cutting to be used in making embankment or to be deposited as spoil banks with in 30 M distance as directed by the Engineer IN charge including supply of roller and water required for proper completion of the work as per M.O.T. specification NO. 301,2.1.(SI No. 253) | 28,950 | CUM | 35 | ₹10,13,250 |
| 5 | Part-B (Road Work) | - | - | - | - |
| 6 | E/W in Cutting or in embankment in ordinary soil excavation to be done in form of regular pits not exceeding 1/2 m in depth and work embankment to be in 20cm layers including ramming and dressing the surface to required level and slopes and also including 1.5 m lift and 30m lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with 30m distance as directed by the E/I (SI o. 253A) (In filling) | 10,685 | Cum | 432.8 | ₹46,24,468 |
| 7 | Earthwork: Excavation in foundation etc. in ordinary soil (Loam, Clay or Sand) including lift upto 1.5 m lead upto 50m including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation as directed by Engineer- in- charge with lead of 50 m . (PWD SI No-251) | 302 | Cum | 130 | ₹39,260 |
| 8 | Prepration and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 meters.(DSR-16.1/2019) | 25,205 | SQM | 80 | ₹20,16,400 |
| 9 | stablization of blanket course 225mm thick composed of coarse / medium sand with pl < 6 % up to CBR value 10 % in road portion including supply of all material & Labour T&P compete In all respect. (Ch-1 sn-7(b)) | 5,788 | Cum | 875 | ₹50,64,500 |
| 10 | Construction of granular sub-base by providing close graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavater at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause Morth 401. | 9,548 | Cum | 3,225 | ₹3,07,92,300 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
docJ.pdf
Tender Documents • 0.62 MB
BOQ_1171245.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .