Loading…
Loading…
50 results • Latest
Fast based 3d paint of under ramp portion on NH 27 at Jajmau Kanpur
Drythane waterproof coating work in the portico located in the kanpur development authority headquarters building complex and vice presidents residence secretarys residence
Construction of interlocking pathway 3 meters wide on the damaged section of the road leading from GT Road to Visayakpur village near Kanpur University in Kanpur Nagar
Construction of 45 meter 30 meter 24 meter wide zonal road at New Kanpur City in Kanpur
Beautification of 4-Lane Road from Ganga Barrage to Mandhana Tiraha.
Work of Annual Operation and Maintenance of tubewells in Bhagirathi Janhavi and Sakrapur(PMAY).
Work of Annual Operation and Maintenance of tubewells in various schemes (Jawaharpuram Sector-6, Catel Colony, Kashiram Shahari Gareeb Awas Yojana Sajari ) of Kanpur Development Authority.
Repairing work Finishing work and exterior painting work at community Center Vijay Nagar
ProDot Compatible Toner Cartridge Manufactured by DIC Techware
Beautification of Ramleela Park at Ratanpur Yojna.
Construction of boundary wall and beautification works towards Chakeri Airport CHAKERI KANPUR
ALLOTMENT OF HOSPITAL PLOT AT MACROBERTGANJ KANPUR
Unbranded Type 1 - Pocket shape envelope With Window 110 x, Unbranded Type 1 - Pocket shape envelope With Window 110 x 220 (DL) mm
Construction of precast boundrywall at Village panki gangaganj Arazi no.1101,1102,880,872 Mahaveer Nagar Vistar Yojna
SHREYANS 2.78 kilogram Ream of 500 Sheet 75 gsm FS size Plain, SHREYANS 2.78 kilogram Ream of 500 Sheet 75 gsm FS size Plain Copier Paper
Unbranded 80 gsm A4 (210 X 297) size White Printing White, Unbranded 80 gsm A4 (210 X 297) size White Printing White Paper
Strengthening and Development of the Model Road from Bhatia Hotel to Panki Dham Station and Hanuman Temple to the Panki Padav Railway Crossing at Panki
PATHWAY AND CHAIN LINK FENCING WORK IN ALLEN FOREST COMPLEX AZAD NAGAR KANPUR
construction of 30 meter master plan road at new kanpur city kanpur
Plantation Work by Miyawaki Method with Three Years Maintenance at Mavaiya G.S. Land Arazi No. 1532. (20000 Plants)
Comprehensive annual operation and maintenance of street lights and fountains at Gautam Budda Park, Indra Nagar, Kalyanpur, Kanpur Nagar
Development work of the 3.00 km Model Road from the Panki Power Plant to Cambridge Crossing
Construction of Retaining wall parallel to Pandu River and Drain alongside 45.0 mtr. road between railway line and Lucknow Agra NH in Mahaveer Nagar Vistar Yojna.
Strengthening and widening of two link road from mainawati road to barrage road
Beautification and repair/strengthening work of Sanjay van located in Kidwai Nagar
Construction of 100 KLD Capacity Sewage Treatment Plant (Based on EBR MBR Ozone UV Treatment Running with Grid Connected Solar) including operation maintenance for 5 years at Mama Talab Village Maswanpur Kanpur Nagar (U.P.)
Construction of Two STP of 4.50 MLD each in New Transport Nagar Phase 1 and 3 including Operation and maintenance for 05 Years
supply of manpower for three years maintenance work in KDA Greens scheme located at mainawati marg and kda dreams scheme located at shatabdi nagar of the authority and supply of security guards at the main gate of both the schemes
MAINTENANCE WORK AT SIGNATURE GREENS, VIKAS NAGAR KANPUR FOR THREE YEAR
Construction of Pump House and Rising Main at Pradhan Mantri Awas Yojna located at Jaharpuram Sector-1.
Widening and strengthening work of Sagarpuri Road along the high tension line from Hamirpur Road (Kanpur Sagar Highway).
Internal development work of remaining newly created plots on 80 feet road in Arra Bingawaan Scheme.
Plantation Work with 3 Years Maintenance work in partial part of city forest, at Maksudabad Zone-2, Kanpur. (10000 Plants)
Development work of Road, Drain, Park, Sewer Line Water Line at Sector-4 Jawaharpuram
Strengthening and Widening of connecting road and construction of toe wall from ganga barrage road to Mainawati road
Beautification work of the internal road of Highway city Pocket C and the road connecting Highway city Pocket C to the Goal chouraha
Plantation work by miyawaki Method with Three Years Maintenance at Ahirawan G.S. Land Arazi No. 1642. (32000 Plants)
Construction and Development of 20MLD IPS at Jawaharpuram Sector-13
Providing Streat Light Work from botanical garden entry gate to boat club entry gate.
Road Strengthening work from swarn jayanti vihar sector 5 to pradhan mantri awas yojna bhagirathi janhavi
BHEEM SINGH CHOURAHE SE PMAY TAK NALE KE DAYI PATRI TAK SADAK KA SUDHRIKARAN KA KARYA
Widening of 12m, 24m road and construction of Divider from Jawaharpuram Sector-13 to Shivali Raod
RFP for Hiring a consultant to assist Kanpur Development Authority in Land Assembly Activities for Greater Kanpur and other areas.
Construction of 4.50 MLD Capacity Sewage Treatment Plant (Based on Sequential Batch Reactor Technique) including operation maintenance for 5 years at Kalindi Nagar Mahaveer Nagar Vistar Scheme in Kanpur Nagar (U.P.)
Constrction of Sewer lines water lines roads and drains between plots no 76 87 652 and 720 of Pokharpur C and D
Plantation Work with 3 Years Maintenance at Jawaharpuram Scheme in the central verge from in front of Sector 13-14 to Rajput Chauraha and From Rajput Chauraha to Sector-6
External Electrification work for Newly Developed Plots at Highway City Pocket- F.