Loading…
Loading…
80 results • Latest
Construction of Retaining wall parallel to Pandu River and Drain alongside 45.0 mtr. road between railway line and Lucknow Agra NH in Mahaveer Nagar Vistar Yojna.
Strengthening and widening of two link road from mainawati road to barrage road
ECO RISE 2.34 kilogram Ream of 500 Sheet 75 gsm A4 size Plain Copier Paper
Oddy 90 gsm Type 1 - Dry ( ammonia vapour development ) Tracing Paper of grade Heavy
Oddy 90 gsm Type 1 - Dry ( ammonia vapour development ) Tracing Paper of grade Heavy
Beautification and repair/strengthening work of Sanjay van located in Kidwai Nagar
Construction of 100 KLD Capacity Sewage Treatment Plant (Based on EBR MBR Ozone UV Treatment Running with Grid Connected Solar) including operation maintenance for 5 years at Mama Talab Village Maswanpur Kanpur Nagar (U.P.)
Construction of Two STP of 4.50 MLD each in New Transport Nagar Phase 1 and 3 including Operation and maintenance for 05 Years
supply of manpower for three years maintenance work in KDA Greens scheme located at mainawati marg and kda dreams scheme located at shatabdi nagar of the authority and supply of security guards at the main gate of both the schemes
MAINTENANCE WORK AT SIGNATURE GREENS, VIKAS NAGAR KANPUR FOR THREE YEAR
Construction of Pump House and Rising Main at Pradhan Mantri Awas Yojna located at Jaharpuram Sector-1.
GOOD QUALITY Mill Board File Cover for 21.5 cm x 34.5 cm (FS) size document
KAYPEE Mill Board File Cover for 21.5 cm x 34.5 cm (FS) size document
VILLETECH Cardboard / Duplex Board Lever Arch Box File/Index File for 21.5 cm × 35.5 cm (Legal) size document
Unbranded Cotton Flannelette duster of Size 30 x 30 inches
Widening and strengthening work of Sagarpuri Road along the high tension line from Hamirpur Road (Kanpur Sagar Highway).
Internal development work of remaining newly created plots on 80 feet road in Arra Bingawaan Scheme.
Plantation Work with 3 Years Maintenance work in partial part of city forest, at Maksudabad Zone-2, Kanpur. (10000 Plants)
Development work of Road, Drain, Park, Sewer Line Water Line at Sector-4 Jawaharpuram
Strengthening and Widening of connecting road and construction of toe wall from ganga barrage road to Mainawati road
Beautification work of the internal road of Highway city Pocket C and the road connecting Highway city Pocket C to the Goal chouraha
Plantation work by miyawaki Method with Three Years Maintenance at Ahirawan G.S. Land Arazi No. 1642. (32000 Plants)
Construction and Development of 20MLD IPS at Jawaharpuram Sector-13
Providing Streat Light Work from botanical garden entry gate to boat club entry gate.
Road Strengthening work from swarn jayanti vihar sector 5 to pradhan mantri awas yojna bhagirathi janhavi