Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.9 CrAdmitted-Finance SC 326 SHASTRI NAGAR GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201001 | -14.99% | ₹15.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹17.6 Cr+₹1.7 Cr (10.9%)Admitted-Finance | -5.75% | ₹17.6 Cr+₹1.7 Cr (10.9%) | L2 | Admitted-Finance |
| 3 | L3₹18.2 Cr+₹2.4 Cr (14.9%)Admitted-Finance FRIENDS COLONY ETAWAH | ETAWAH | ETAWAH | UTTAR PRADESH | -2.30% | ₹18.2 Cr+₹2.4 Cr (14.9%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical 00 KHRAUTI RAMPUR BASTI BASTI UTTAR PRADESH 272124 | BASTI | UTTAR PRADESH | 272124 | - | - | - | Rejected-Technical Unqualified |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical Unqualified |
Tender Value
₹18.7 Cr
EMD Value
₹37.3 L
Closing Date
11 Mar 2026, 5:00 pmClosed
CE KDA
KDA KANPUR
Development work of Road, Drain, Park, Sewer Line Water Line at Sector-4 Jawaharpuram
2026_UPKDA_1119498_1
E-355283/EE2/KDA/2025-26
Open Tender
Civil Works
Percentage
365 days
kanpur nagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
FC
₹37.3 L
29 May 2026
23 Feb 2026
12 Mar 2026
23 Feb 2026
11 Mar 2026
23 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | PART -A (Site Prepration) | - | - | - | - |
| 1.02 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 73,203 | sqm | 7 | ₹5,12,421 |
| 1.03 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket ) capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 | 50,328 | cum | 37 | ₹18,62,136 |
| 1.04 | EXTRA Cartage of earth up to 10.0 km distance excluding loading and un loading all complete of work | 64,968 | cum | 257 | ₹1,66,96,776 |
| 1.05 | Part-B (Road Work) | - | - | - | - |
| 1.06 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket ) capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 (INCLUDING EXTRA Cartage of earth up to 10.0 km distance excluding loading and un loading all complete of work) AND ALSO including | 46,956 | cum | 294 | ₹1,38,05,064 |
| 1.07 | 2.8 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 2.8.1 All kinds of soil. | 276 | cum | 215 | ₹59,340 |
| 1.08 | Construction of subgrade and earthen shoulders with approved material 303.1 obtained from borrow pits with all lifts and leads, transporting to site, 3.14) spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | 28,770 | sqm | 114 | ₹32,79,780 |
| 1.09 | stablization of blanket course 225mm thick composed of coarse / medium sand with pl < 6 % up to CBR value 10 % in road portion including supply of all material & Labour T&P compete In all respect. (Ch-1 sn-7(b)) | 6,474 | cum | 875 | ₹56,64,750 |
| 1.1 | Construction of granular sub-base by providing close graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavater at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause Morth 401. | 6,666 | cum | 3,225 | ₹2,14,97,850 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.21 MB
Tenderdocument.pdf
Tender Documents • 0.56 MB
BOQ_2081723.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .