Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Finance | -19.00% | ₹1.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.5 Cr+₹3.6 L (2.48%)Admitted-Finance 26 P BLOCK KUNJ VIHAR YASHODA NAGAR KANPUR NAGAR UTTAR PRADESH 208011 | KANPUR NAGAR | UTTAR PRADESH | 208011 | -16.99% | ₹1.5 Cr+₹3.6 L (2.48%) | L2 | Admitted-Finance |
| 3 | L3₹1.5 Cr+₹7.1 L (4.94%)Admitted-Finance G1 ARIHANT APARTMENT MODERN SOCIETY PRATAP NAGAR NAGPUR MAHARASHTRA 440022 | NAGPUR | MAHARASHTRA | 440022 | -15.00% | ₹1.5 Cr+₹7.1 L (4.94%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Technical bid Disqualify |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical Technical bid Disqualify |
Tender Value
₹1.8 Cr
EMD Value
₹3.6 L
Closing Date
10 Jun 2026, 5:00 pmClosed
CE KDA
kda motijheel kanpur
Beautification and repair/strengthening work of Sanjay van located in Kidwai Nagar
2026_UPKDA_1150779_1
E949354
Open Tender
Civil Works
Percentage
270 days
kanpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹7,080
FC
₹3.6 L
13 Jul 2026
20 May 2026
11 Jun 2026
20 May 2026
10 Jun 2026
20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Boundary Wall Work | |||||
| 1.01 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge. | - | Sqm | - | - |
| 1.02 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 12.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand) | - | Cum | 1 | - |
| 1.03 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)SOR (5.2.2) | - | Cum | 1 | - |
| 1.04 | Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used. 16.18.1 With G.I. barbed wire | - | rmt | - | - |
| 1.05 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | - | kg | 1 | - |
| 1.06 | Finishing walls with Putty approved brand and manufacture and of required shade on undacorated wall surface to give even shade over including curing and cost of all material, labour, T&P etc. required for proper completion of work. | - | Sqm | 1 | - |
| 1.07 | Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) | - | Sqm | - | - |
| 1.08 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work | - | sqm | - | - |
| 1.09 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)SOR (5.1.2) | - | Cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
tenderdocsanjayvan.pdf
Tender Documents • 1.59 MB
BOQ_2155119.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .