Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹28 L
EMD Value
₹28,000
Closing Date
3 Oct 2024, 5:00 pmClosed
Superintending Engineer
33/11 KV S/S Hospital Chauraha, Bahraich
Release of connections work on Turn Key Basis under EDD-I, II, III Bahraich
2024_MVVNL_957320_1
41/EDC(B)/2024-25
Open Tender
Electrical Works
Turn-key
90 days
Bahraich
Please Refer Tender Form
3 documents required · 3 mandatory
₹3,540
Superintending Engineer, EDC
₹28,000
9 Nov 2024
20 Sept 2024
4 Oct 2024
20 Sept 2024
3 Oct 2024
20 Sept 2024
Amount
All Materials Provided by the Contractor as per Resspo Norms PART-A (Supply)
PCC Pole 8.5 Mtr long
AB Cable 1x25+1x16mm2
Stone Pad
11 KV 'V' Type Steel X-Arm
Tee off Channel
11 KV Pin Insulator with Pin
11 KV Disc Insulator with Fitting
ACSR Weasel Conductor
Stay Set
Earthing
GI Barbed Wire
Sub Station Base Angle
MS Channel Dropper
Top Channel
Clamp for Top. Tee Drp, Guard etc.
F-Bracket Clamp
Danger Board, No.-Plate Bolth with
LT Clamp with Eye Hook
Suspension Clamp
Pieresing Clamp
V-Type X-Arm Holding Clamp
Dead End Clamp
Concreting of Stay
Clamp for D.B.
Clamp for T/F
LT PVC Cable
Distribution Box
PART-B (Erection Work)
Fabrication & Erection of Single PCC Pole (8.5 Mtr Long) for 11 KV & HT line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site with complete fitting. All the materials for fabrication shall be arranged by the contractor as per RESPO Norms).
Fabrication & Erection of Double PCC Pole (8.5 Mtr Long) for 11 KV & HT line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site with complete fitting. All the materials for fabrication shall be arranged by the contractor as per RESPO Norms).
Supply, Grouting nozzling & binding of stay sets with stay clamp complete fittings. (All the materials for fabrication shall be arranged by the contractor as per RESPO Norms).
Grouting of Poles with 1:4:8 CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely. (All the materials for fabrication shall be arranged by the contractor as per RESPO Norms).
Earthing Complete at 11/0.4 KV T/F as per RESSPO Norms.
Earthing Complete at HT/LT Pole as per RESSPO Norms.
Laying & Commissioning of LT PVC Cable as per respo norms.
Errection & Commissioning of AB cable 1x25+1x16mm2 including fitting of Accessories (All Accessories shall be Provided by the Contractor).
Carriage & Mounting & Jumpring of 16 KVA T/F with complete fitting.
Carriage & Mounting & Jumpring of 25 KVA T/F with complete fitting.
Fitting of Three Phase Distribution Box
Laying, stringing, sagging, binding & jumpering of conductors of 3 phase, 4 wire guard wire the help of necessory clamp and binding wire proper connector & Clamp (Complete Fitting.)
M/s S S Associates
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .