Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance NULL | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance KANNUR | KERALA | 670001 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹32.2 L
EMD Value
₹50,000
Closing Date
16 Apr 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer,Roads Division Kannur
O/o,Executive Engineer,Roads Division Kannur
GENERAL-Budget 2021-22- ChakkarakkalBypass and Other Allied Town Improvement Works-Developmental Works-Investigation Work
2022_PWD_485973_1
PWD/RB/TR/107713/2021_3_1_1/1
Open Tender
Civil Works - Roads
Item Rate
270 days
Kannur
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹50,000
Yes
19 Apr 2022
8 Apr 2022
19 Apr 2022
8 Apr 2022
16 Apr 2022
8 Apr 2022
60 days
Amount
DAR - Investigation
56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring
56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring.
56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.b.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.c.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.d.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata above 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.4:Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under water and banks of river.
56.5.a:Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit - In land
56.6:Recovering undisturbed soil samples using thin tube sampler of 75mm.to 100mm length internal dia 500mm length conforming to relevant IS Code at any required depth including clearing the bore hole etc complete.
56.7:Conducting standard penetration test in bore hole at any depth.
56.8:Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.
56.11.a:Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring for 5 bore holes.
56.12.b:Total station surveying and preparation of site plan - Plain built up area with hindrance to line of sight due to buildings/structures.
56.13:Providing access to the site clearing site and making good for surveying in order to provide clear line of site devoid of any hindrance due to vegetation etc. and clearing areas for station points (This item is applicable only for sites without access such as in case of new road formation, bridge and building sites at in accessible locations).
56.16:Preparation of Detailed Project Report of the bridge works containing alignment plan, key plan, contour plan , index map, longitudinal and cross section of road and River/Thodu cross section of bridge hydraulic and velocity calculations including neat filing and supplying five set DPR etc. as per the directions of the departmental officers.
56.17.1:Providing access to the site,clearing site and making good to erecting and conducting soil testing transfers within the site and for any other temporary arrangements to be erected within the area in connection with conducting soil testing.
56.18.1:Structural design of building up to 1000 m2
56.18.2:Structural design of building for additional area.
56.19.2:Preparation of detailed estimate based on standard data (0.75% of the estimate cost or by negotiation). Note: i) Quantity should be amount in hundreds, ie. For Rs. 100000.00, quantity shall be 1000. ii) percentage deduction in case of negotiation shall be included in decimal format within the coefficient cell.
56.19.3:Preparation of architectural drawing (1 % of the estimate cost of the building based on Plinth Area rate). Note: i) Quantity should be amount in hundreds, ie. For Rs. 100000.00, quantity shall be 1000. ii) percentage deduction in case of negotiation shall be included in decimal format within the coefficient cell.
Preparation of DPR, Traffic Surveys, Pavement Evaluation, CBR, Valuation etc
OD92084/2021-2022:Preparing alignment for the proposed road and drawing out a suitable alignment meeting all requirements of Indian Road Congress(IRC) and giving the plinth area of each building with the type of the building like residential or commercial . Also satisfying the Engineering aesthetic and economic requirement designing of horizontal curves (wherever feasible) including spiral transitions and vertical curves after finalizing the alignment and also preparing the LS and CS at an interval of 10m C/C.proposed formation level ,detailed drawings of all the proposed structures like retaining wall ,culverts etc.and all provisions of traffic safety measures, quantity calculations, detailed estimate, designs and preparing DPR (8 copies)with all details annexures etc. all complete as per the direction of dptl. officer at site. The DPR shall include project background, social analysis of the project, functional design, Engineering design, details of surveys and investigations carried out, analysis and interpretation of survey and investigation data, environmental aspects, economic, financial and commercial analyses and conclusions. The report shall include Executive Summary giving brief accounts of the findings of the study and recommendations. The strip plan, plan & profile drawings, cross sections of right of way and details of structures including drainage facilities and pitching on side slope with stabilisation methods as well as any cost workings. Cost-Benefit Analysis, value engineering options to be discussed. WBS and Timeline chart, Risk assessment and Mitigation Measures shall be part of the report. The Environmental Impact Assessment (EIA) Report for contract package shall be submitted as a part of the main report. Utility Shifting and felling of trees quantities, land acquisition strip plan shall be part of the investigation. The basic data obtained from the field studies and investigations and input data used for the preliminary design shall be submitted in a separate volume as an Appendix to Main Report.
OD94654/2021-2022:Conducting a Social Impact Survey to record the feasibility studies with a preliminary design and furnishing a Approximate Cost Estimation to include Reconnaissance and traffic estimation as per the Morth specification.
OD92079/2021-2022:Conducting soil test, at suitable intervals, including taking samples, testing CBR Value, submittin the reports etc all complete - For CBR Value 5 tests per day The DPR shall include Sub-soil Exploration, Material Investigation, soil sample analysis with all parameters including test results for subgrade soils, Geotechnical Report with soil stabilisation using geotextiles etc., Quantity calculations,
OD92081/2021-2022:Conducting traffic survey at different station suggested by the department including traffic count,(7days ,24hour continously) consolidating the survey,consolidating the result, computing design parameters like PCU,MSA etc.for including hirecharges of shed ,furniture,labour charges,cost of stationeries etc. complete and compiling the data and submitting the same in hard and soft copy etc. complete. The DP shall include all the traffic studies and demand forecasts designs, axle load surveys, Turning movement survey, any other as per the requirements of the alignment. all complete.
OD94646/2021-2022:Conducting benkleman beam deflection test at 50m intervals as per specifications including digging hole 15mm dia. and 40mm depth for taking temperature and collecting soil samples at testing points as per the specifications and furnishing of the test resullt reports as directed by the engineer
OD92080/2021-2022:Engaging labour for assisting preparation of area details based on revenue records of land to be acquired including all cost labour charges etc. complete as per the direction of deptl. officer at site
OD92087/2021-2022:Engaging labour for valuation of structures falling in the land to be acquired including all cost labour charges etc. complete as per the direction of deptl. officer
OD92086/2021-2022:Engaging labour for valuation of structures falling in the land to be acquired ,including all cost etc. complete as per the direction of deptl. officer.
8.8:Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
OD92083/2021-2022:1. Printing charges of entire Detailed Report and DPR and binding DPR. 2. Preparation of 3D drawing of proposed Bridge and approach road in a suitable software using contour and levels matching the site conditions and providing copies of colour photos in A3 size.
Morth-Investigation
8.16:Reinforced cement concrete M-15 grade boundary pillars of standard design as per IRC:25-19767, fixed in position including finishing and lettering but excluding painting .
THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY
Bidder Name
THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY
G S Infrastructure
stage.html
html • 0.02 MB
finance_698238.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .