| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.2 LAccepted-AOC BHATGAON BHATGAON 131022 | BHATGAON | SONIPAT | HARYANA | 131022 | 1 | Accepted-AOC L1 | |
| 2 | 2₹9.9 L+₹70,036 (7.61%)Rejected-Finance | 2 | Rejected-Finance L2 |
Tender Value
₹8.4 L
EMD Value
₹16,740
Closing Date
8 Aug 2022, 1:00 pmClosed
Executive Engineer
Gohana W/S Division Gohana
Inlet of village pond Aambwala village salimpur Trali by outlet RD 7495 R of Mohana Minor
2022_HRY_232366_5
6634-55/15A dt 26.07.22
Open Tender
Civil Works
Works
60 days
Gohana
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹16,740
Yes
25 Aug 2022
29 Jul 2022
8 Aug 2022
29 Jul 2022
8 Aug 2022
29 Jul 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. All kinds of soil (New HSRitem No. 4.12)
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns(New HSR item No. 6.29.1)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1:3:6 (1 Cement : 3 coarse sand (zone-Ill) : 6 graded stone aggregate 20 mm nominal size) (New HSR item No. 6.1.4)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1:2:4 (1 cement : 2 coarse sand (zone-Ill) : 4 graded cum stone aggregate 20 mm nominal size) (New HSR item No. 6.1.2)
Providing, lowering, laying, aligning, fixing in position and jointing at all level/ depths ISi marked HDPE pipe of PE-80 grade and PN-4 for sewer. application as per IS 14333-1996 (amended up to date) in trenches in complete induding cost of HDPE Specials, labour, sectional hydro testing (including the cost and conveyance of water to site for testing) and commissioning as per Technical Specifications and as per direction of Engineer. Note: E/w to be measured and paid separately. Rate includes cost of all specials like bends, tees required during laying of pipe line along required alignment. 200 mm outside dia. ( New HSR item No. 21.96.1)
HDPE Bend
Brick Masonry Work in Cement Mortar 1 :3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications MORT&H clause 1300. Cement Mortar 1 :3 (1 cement : 3 sand) (New HSR item No. 15.6.1)
12 mm cement plaster of mix : 1 :3 (1 cement: 3 fine sand) (New HSR item No. 11.5.2)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5m. (New HSR item No. 4.32)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .