Loading…
Loading…
Tender Value
₹30 L
EMD Value
₹30,000
Closing Date
28 Sept 2026, 6:00 pmDue tomorrow
Assistant Manager (North West Zone)
Manufacturing ,Supplying , Fixing and Repairing Diff. Size Kinfe Edge Gate Valve for Diff. SWD and Other Civil Works at Mahila Garden , Ambali lake or Diff. location in Bodakdev ward in NWZ.ARC
346517
Tender no 348 tender notice no- 06/2026-27
Open
Civil Works
Works
Ahmedabad
5 documents required · 5 mandatory
₹1,500
Municipal commissioner, Ahmedabad
₹30,000
19 Sept 2026
19 Sept 2026
19 Sept 2026
28 Sept 2026
19 Sept 2026
Name of work: Manufacturing ,Supplying , Fixing and Repairing Diff. Size Kinfe Edge
Gate Valve for Diff. SWD and Other Civil Works at Mahila Garden , Ambali lake or Diff.
location in Bodakdev ward in NWZ.
Qty. Items Rate Rs.Ps. per
1 Job Work of providing, fabricating, and fixing
SS Flange tail pieces set of for following dia
RCC pipe for fixing of knief Edge Gate Valve
with using Grouting matrials . Rate to
include arranging, transporting, fabricating
in SS Sheet flats and Flange with grouting in
RCC pipe anchoring them in RCC pipe by
anchor bolts and filling the pipe by rich
cement mortar mixed with chemicals, etc.
(i) 0.00 for 300 mm dia 43996.00 Nos.
(ii) 0.00 for 450 mm dia 61088.00 Nos.
(iii) 0.00 for 600 mm dia 87718.00 Nos.
(iv) 2.00 for 900 mm dia 134105.00 Nos.
(v) 1.00 for 1200 mm dia 154662.00 Nos.
(vi) 0.00 for 1400 mm dia 163570.00 Nos.
(vii) 0.00 for 1600 mm dia 179688.00 Nos.
(viii) 0.00 for 1800 mm dia 228613.00 Nos.
(ix) 0.00 for 2000 mm dia 248248.00 Nos.
2 Job Work of providing, fabricating, and fixing
SS Flange Body type knief Edge Gate Valve
of following dia (Inside) . Rate to include
arranging, transporting, fabricating, laser
cutting, plasma cutting, Molding, machining,
Drilling in SS Sheet, flats ,SS Ring ,Flange
with rubber lining and Nut bolts etc.
(i) 0.00 for 300 mm dia 101138.00 Nos.
(ii) 0.00 for 450 mm dia 132737.00 Nos.
(iii) 0.00 for 600 mm dia 173438.00 Nos.
(iv) 2.00 for 900 mm dia 258548.00 Nos.
(v) 1.00 for 1200 mm dia 302328.00 Nos.
(vi) 0.00 for 1400 mm dia 338952.00 Nos.
(vii) 0.00 for 1600 mm dia 376310.00 Nos.
(viii) 0.00 for 1800 mm dia 517063.00 Nos.
(ix) 0.00 for 2000 mm dia 576943.00 Nos.
3 Job Work of providing, fabricating, and fixing
SS supports, floor and railings on top of
the gate frame to enable the fixing of
gearbox, SS frame top ends to be bound with
the floor structure of the gear box. Rate to
include providing the SS sheets, flats to
fabricate the top head stock supporting
structure, spindle cover pipe and fixing the
top plates by bolts in such a manner that it
can be opened easily for future maintenance
at site, etc. complete.
(i) 0.00 for 300 mm dia 20597.00 Nos.
(ii) 0.00 for 450 mm dia 24013.00 Nos.
(iii) 0.00 for 600 mm dia 29144.00 Nos.
(iv) 3.00 for 900 mm dia 32686.00 Nos.
(v) 3.00 for 1200 mm dia 43018.00 Nos.
(vi) 0.00 for 1400 mm dia 48357.00 Nos.
(vii) 0.00 for 1600 mm dia 53872.00 Nos.
(viii) 0.00 for 1800 mm dia 73208.00 Nos.
(ix) 0.00 for 2000 mm dia 82972.00 Nos.
4 Job Work of providing, turning, fabricating
and fixing SS spindle connecting the gear
box and barrier and head stock of gearbox on
top of the gate. Rate to include providing the
SS spindle rod, turning it for the
recommended pitch length of teeth, casting
the gears from SG grade steel, turning the
warm gears ,cutting teeth in to round gear,
turning the hole on round gear exactly to
match the outer teeth of the spindle, fixing all
assembly to form the gear box with housings
and bearings, thrust bearing on top and
bottom of round gear fixed between SS
plates, covering the gear box sides also
in by SS plates .fabrication of head stock by
plates and pipe to form the standing structure
of rotation height required, fixing all on
platform, etc. complete.
(i) 0.00 for 300 mm dia 40009.00 Nos.
(ii) 0.00 for 450 mm dia 47670.00 Nos.
(iii) 0.00 for 600 mm dia 53535.00 Nos.
(iv) 3.00 for 900 mm dia 67677.00 Nos.
(v) 4.00 for 1200 mm dia 70642.00 Nos.
(vi) 0.00 for 1400 mm dia 78536.00 Nos.
(vii) 0.00 for 1600 mm dia 87087.00 Nos.
(viii) 0.00 for 1800 mm dia 97531.00 Nos.
(ix) 0.00 for 2000 mm dia 111041.00 Nos.
5 Constructing Valve Chamber onfollowing dia
SWD linw (inside clear)including excavation,
refilling, plain cement concrete (1:4:8) for
foundation, Pre cast /situ to cast RCC M-30
20 mm thick inside cement plaster, PVC foot
steps, brick masonary in C.M. (1:5), including
cost of manhole cover and RCC slab in RCC
M-20 etc complete.depth up to 5.00 mt.
(i) 0.00 for 2000 mm dia,1800 mm dia,1600 mm dia 139392.00 Nos.
(ii) 3.00 for 1400 mm dia ,1200 mm dia, 900 mm dia 105653.00 Nos.
(iii) 0.00 for 600 mm dia ,450 mm dia,300 mm dia 76032.00 Nos.
6 providing and fixing pakka dummy in
following dia RCC pipe line with using MS
plate ,MS garder ,sand bags, Diversion pipe,
plug ,Brick work, as per required and
removing same after completion work etc
comp.Do As Directed.
(i) 2.00 for 2000 mm dia,1800 mm dia,1600 mm dia 79200.00 Nos.
(ii) 1.00 for 1400 mm dia ,1200 mm dia, 900 mm dia 52800.00 Nos.
(iii) 0.00 for 600 mm dia ,450 mm dia,300 mm dia 30800.00 Nos.
7 Providing and casting in situ Controlled
Cement Concrete (with ordinary portland
cement) M-25 for Well curbs including
necessary shuttering, laying, vibrating and
curing complete.
(i) 10.00 Flat Top/Bottam Slab with shuttering 8077.00 m3
(ii) 8.00 vertical wall above 25 cm 7936.00 m3
8 Providing Labour for Mice. Work for
Breakdown work releted job including
required tools etc.comp.
(i) 90.00 Unskilled Labour for 8 Hrs Shift 640.00 Shift
(ii) 16.00 Skilled Labour for 8 Hrs Shift 656.00 Shift
9 210.00 Conveyance charge of earth, lime, murrum, 124.00 m3
building ,rubbish, manual garbage, sludge,
excavated rock, fly ash,aggregate of any kind
etc. complete. Upto 5.0 Km lead.
10 67.45 ReFilling available excavated earth 22.00 m3
(excluding rock) in trenches, plinth, sides of
foundations etc. in layers not exceeding
cm in depth consolidation each deposited
layer by ramming and watering.
11 48.00 Barricating the entire break down or 1056.00 Rmt
excavated area on rental basis using wooden
ballies/MS angles at max 2.00 mt center to
center ,G I sheet, reflective paint board out
side to avoid accident and for smooth traffic
diversion and The same shall be removed
after complention of work.
12 6.00 Hiring Charge for JCB machine bring for 6412.47 Shift
excavation of the break down pit and loading
the excavated soil for shifting another place
or misce.work etc.complete. as directed.rate
for 8 Hrs working in Day.
13 6.00 Hiring charges of heavy 12 Tonne capacity 3334.49 Day
Hydro machine for lifting the Any Matrials
when required any time. rate for 8 Hrs
working in Day.
14 26.00 Hiring and operating the Tractor for Earth 2104.09 Day
work and other requirements with Arranging
fule Set Do As Directed. 8 Hrs working in
15 Hiring and operating following capacity Mud
Pumps incl. Cost of fuel and operator
including the cost of to and fro transportation,
laying of the delivery hoses as required,
lowering and lifting the pumps as and when
required etc. complete. Set Do As
Directed.for 8 Hrs Shift.
(ii) 2.00 10 HP 1496.00 Shift
(iii) 0.00 20 HP 2232.00 Shift
16 Hiring and operating the Following capacity
Phase Electric Generator for operating
machinery, and lighting and other
requirements with Arranging diesel to run the
D.G. Set Do As Directed. 8 Hrs Shift.
(i) 24.00 10 KVA 2464.00 Shift
(ii) 2.00 20 KVA 2816.00 Shift
(iii) 0.00 40 KVA 4018.00 Shift
17 20.00 Hiring and operating the electric Breaker 880.00 Shift
Machine for Dismantaling work for removing
damage manhole and other requirements
with Arranging cable Set Do As Directed.
18 18.00 Providing lighting arrangement for doing work 132.00 Nos
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
T.N.348.pdf
BOQ348.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .