Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.1 LAccepted-AOC | L1 | Accepted-AOC accept | |
| 2 | L2₹29.1 L+₹2,276.63 (0.08%)Rejected-Finance B 3 KRISHNA PARK SOCIETY SAI CHOKDI MANJALPUR VADODARA 390011 | VADODARA | GUJARAT | 390011 | L2 | Rejected-Finance Quoted higher amount than L1. | |
| 3 | L3₹30.3 L+₹1.3 L (4.34%)Rejected-Finance | L3 | Rejected-Finance Quoted higher amount than L1. | |
| 4 | L4₹40.8 L+₹11.7 L (40.4%)Rejected-Finance 1103 ARUNAACHAL BUILDING 19 BARAKHAMBA ROAD NEW DELHI 110001 | NEW DELHI | DELHI | 110001 | L4 | Rejected-Finance Quoted higher amount than L1. | |
| 5 | L5₹67.5 L+₹38.5 L (132.3%)Rejected-Finance 218 2ND FLOOR U S COMPLEX 120 MATHURA ROAD NEW DELHI 110076 | SOUTH | DELHI | 110076 | L5 | Rejected-Finance Quoted higher amount than L1. |
Tender Value
₹49.3 L
EMD Value
₹1.2 L
Closing Date
29 Dec 2023, 4:45 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Archaeologist
Superintending Archaeologist Archaeological Survey of India, Vadodara Circle, Vadodara
Towards execution of demolition work like demolishing R.C.C. work, brick work, taking out doors, windows , clerestory window shutters, cement concrete flooring, stockpiling, disposal of dismantled materials, etc. as mentioned in BoQ.
2023_ASI_784527_1
97/DMLS/ASL/AHD/2023-24-C
Open Tender
Civil Works
Works
120 days
Lothal, ahmedabad
Please refer tender document
8 documents required · 8 mandatory
₹0
₹1.2 L
Yes
Conference hall, 5th floor, Puratattva Bhavan, Man
6 Feb 2024
8 Dec 2023
30 Dec 2023
8 Dec 2023
29 Dec 2023
8 Dec 2023
11 Dec 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1Execution of work under following items | ||||||
| 1.01 | Demolishing the R.C.C. work by mechanical
means and stockpiling at designated locations and
disposal of dismantaled materials up to a lead of 1
kilometer, stacking serviceable and unserviceable
material seperately including cutting of reinforcement
bars.as per direction of Engineer - in- charge. | 698.4 | Cu.mt. | 2,328.55 | ₹16,26,259.32 | 0.12% |
| 1.02 | Demolishing the brick work manually/ by
mechanical means including stacking of serviceable
material and disposal of unserviceable material within 50
metres lead as per direction of Engineer-in-charge. | 851.67 | Cu.mt. | 1,698.45 | ₹14,46,518.91 | 0.12% |
| 1.03 | Taking out doors, windows and clerestory
window shutters (steel, Aluminum or wood) including
stacking within 50 metres lead etc. complete as per direction of Engineer-in-charge. | 292.7 | Sq.mt. | 302.7 | ₹88,600.29 | 0.12% |
| 1.04 | Demolishing the cement concrete flooring along
with tile flooring etc. manually/ by mechanical means
including disposal of materials within 50 meters lead as
per direction of Engineer - in - charge. | 875.76 | Cu.mt. | 1,239.6 | ₹10,85,592.1 | 0.12% |
| 1.05 | Engaging the skilled electrician for removal
of all CCTV cameras, Lightning equipment, electrical
disconnection and removal of all electrical accessories
from Museum building, Staff quarters and old Toilet including EPF,ESIC,GST, etc.
complete as directed by Engineer in-charge. | 60 | Each(Units.) | 984.47 | ₹59,068.2 | 0.12% |
| 1.06 | Excavation for Foundation of the temporary
shed including all cost of labour and material charges
etc. complete as directed by Engineer in-charge. | 6.48 | Cu.mt. | 286.85 | ₹1,858.79 | 0.12% |
| 1.07 | Laying PCC in foundation of wall using 1:3:6 1:
cement, 3: sand and 6: course aggregate including
curing and cost of all labours and materials charges etc.
complete as directed by Engineer in-charge. | 5.5 | Cu.mt. | 6,833.4 | ₹37,583.7 | 0.12% |
| 1.08 | Construction of brick walls using modern
brick in foundation and plinth in c m 1:4 including all cost
of labour, material and curing etc. completed as directed
by Engineer in-charge. | 7.56 | Cu.mt. | 5,746.8 | ₹43,445.81 | 0.12% |
| 1.09 | Filling of yellow earth in plinth including cost
of all materials and labour charges, transportations
charges and compacting etc. complete as directed by
Engineer in-charge. | 14.36 | Cu.mt. | 368.65 | ₹5,293.81 | 0.12% |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
Tender Document • 3.76 MB
Lothal.pdf
Tender Document • 3.75 MB
BOQ_824682.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .