Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAccepted-AOC 953 16TH CROSS 1ST PHASE 1ST STAGE CHANDRA LAYOUT BANGALORE KARNATAKA 560072 | BENGALURU URBAN | KARNATAKA | 560072 | L1 | Accepted-AOC Lowest | |
| 2 | L2₹5.1 L+₹51,000 (11.1%)Rejected-Finance | L2 | Rejected-Finance Not Lowest | |
| 3 | L3₹5.2 L+₹64,600 (14.1%)Rejected-Finance | L3 | Rejected-Finance Not Lowest | |
| 4 | L4₹7.1 L+₹2.5 L (54.1%)Rejected-Finance HOUSE NO 6 ROAD NO 7 KILBURN COLONY HINOO RANCHI 834002 | RANCHI | JHARKHAND | 834002 | L4 | Rejected-Finance Not Lowest | |
| 5 | L5₹7.6 L+₹3.0 L (64.6%)Rejected-Finance | L5 | Rejected-Finance Not Lowest |
Tender Value
₹8.7 L
Closing Date
22 Oct 2021, 6:00 pmClosed
AGM(E-E)
JPNI Airport Patna
Replacement of SMF Battery (i/c buy back) for 2 x 60 KVA UPS at JPNI Airport, Patna
2021_AAI_89224_1
AAI/ER/PAT/AGM(E-E) /SMF Battery/e-NIT- 06/21-22
Open Tender
Supply, Erection and Commissioning
Item Rate
60 days
JPNI Airport Patna
Please refer Tender documents.
13 documents required · 13 mandatory
₹1,120
Exempted
7 Jan 2022
12 Oct 2021
25 Oct 2021
12 Oct 2021
22 Oct 2021
12 Oct 2021
12 Oct 2021 - 18 Oct 2021
Amount
Replacement of 12 volt 150 AH SMF-VRLA battery suitable for 60 KVA UPS Operation to back up power supply to Airfield lighting including buy back of existing batteries connected with the same UPS etc complete as required.
Prostarm Info Systems Ltd(Prostar Micronova Power Systems Pvt Ltd)
Raunak Enterprises
M/S CHAUDHARY CONSTRUCTION
ASAD ALI
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .