| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.1 LAccepted-AOC | L1 | Accepted-AOC lowest agreement executed | |
| 2 | L2₹11.6 L+₹53,135.27 (4.79%)Rejected-AOC | L2 | Rejected-AOC second lowest | |
| 3 | L3₹12.4 L+₹1.3 L (12.0%)Rejected-Finance NARIKULAM HOUSE KANJOOR KANJOOR ERNAKULAM DISTRICT | KANJOOR | ERNAKULAM | KERALA | L3 | Rejected-Finance third lowest | |
| 4 | L4₹14.3 L+₹3.2 L (29.0%)Rejected-Finance | L4 | Rejected-Finance fourth | |
| 5 | L5₹14.8 L+₹3.7 L (33.2%)Rejected-Finance | L5 | Rejected-Finance fifth lowest |
Tender Value
₹13.3 L
EMD Value
₹33,300
Closing Date
4 May 2020, 5:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer, Minor Irrigation Sub Division,Aluva
Rectification of canal
2020_Irrig_353771_1
AEE/MISDN/ALY/01/ET/2020-21/S
Open Tender
Civil Works - Lift Irrigation Schemes
Item Rate
270 days
Neeleeswaram
Please refer Tender documents.
7 documents required · 7 mandatory
₹3,290
Yes
online
₹33,300
Yes
14 Oct 2020
22 Apr 2020
5 May 2020
22 Apr 2020
4 May 2020
22 Apr 2020
22 Apr 2020 - 30 Apr 2020
Amount
15.2.1 : Demolishing cement concrete Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) manually / by mechanical means including disposal of material within 50 metres lead etc complete as per direction of Engineer - in-Charge.
2.6.1 : Earth work excavation in all classes of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, with all leads and lifts, disposed earth to be levelled and neatly dressed etc complete as per the direction of departmental officers at site
4.1.8 : Providing and laying in position cement concrete of specified grade 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centering and shuttering - All work up to plinth level etc complete as per the direction of departmental officers at site
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for side wall of canal etc complete as per the direction of departmental officers at site
5.2.2 : Reinforced cement concrete work in walls (any thickness), 1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) up to floor five level excluding cost of centering, shuttering, finishing and reinforcement etc complete as per the direction of departmental officers at site
5.22.6 : Steel reinforcement for R.C.C work using Thermo - Mechanically Treated bars of grade Fe-500D or more including straightening, cutting, bending, placing in position and binding all complete upto plinth level etc complete as per the direction of departmental officers at site
4.1.6 : Providing and laying in position cement concrete of specified grade 1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centering and shuttering - All work up to plinth level etc complete as per the direction of departmental officers at site
4.1.3 : Providing and laying in position cement concrete of specified grade 1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)excluding the cost of centering and shuttering - All work up to plinth level etc complete as per the direction of departmental officers at site
13.16.1 : Providing and laying 6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)etc complete as per the direction of departmental officers at site
60.7.3 : Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m etc complete as per the direction of departmental officers at site
60.7.2 Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
60.6 Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc complete as per the direction of departmental officers at site
LORANCE A J
DAISY JOSE
WILSON THOMAS
S P thomas
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_497335.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .