Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.3 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹2.4 L+₹3,515.04 (1.50%)Rejected-Finance | 2 | Rejected-Finance L2 | |
| 3 | 3₹2.4 L+₹5,858.41 (2.50%)Rejected-Finance | 3 | Rejected-Finance L3 |
Tender Value
₹2.3 L
EMD Value
₹4,800
Closing Date
7 Mar 2026, 3:00 pmClosed
EE(WS)/TW.DEPTT.
5, S. N. BANERJEE ROAD KOLKATA-700013
REPAIRING OF 170 NOS. SMALL DIA TUBEWELLS IN WARD NO. 123 TO 126 AND 142 TO 144 UNDER BOROUGH. XVI.
2026_KMC_1013774_1
KMC/TW/MAINT/JOKA/01/2025-26
Open Tender
CIVIL WORKS
Percentage
90 days
IN WARD NO. 123 TO 126, 142 TO 144
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹4,800
30 Sept 2026
25 Feb 2026
9 Mar 2026
25 Feb 2026
7 Mar 2026
25 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (C) III: Labour Rate for Sanitary and Plumbing 1.Plumbing Mistry NOTE:The above rates are exclusive of 10 % profit and 1% Labour welfare cess, which would be admissible to the Contractor, but contractual percentage will not be applicable on the above rates. | 170 | EACH | 326 | ₹55,420 |
| 2 | (C) III: Labour Rate for Sanitary and Plumbing 5.Plumbing Helper
NOTE:The above rates are exclusive of 10 % profit and 1% Labour welfare cess, which would be admissible to the Contractor, but contractual percentage will not be applicable on the above rates. Page 113 of 124 | 510 | EACH | 270 | ₹1,37,700 |
| 3 | SECTION(A) PLUMBING WORKS (A)-(VI) TUBE WELL (b) Repair
workes 2 Repairing chocked up tube well by cleaning and washing with chemical including pumping with powerful pump. (i) 40 mm to 50 mm dia. tube well upto 100 metre deep | 5 | EACH SET | 2,347 | ₹11,735 |
| 4 | CARRYING ETC STORE MATERIALS VIZ PIPE, STRAINER, PUMP ETC FROM STORE TO WORK SITE.
(II) FOR DEPTH UPTO 250 M
(AS PER APPROVAL OF M.I.C. ITEM NO. M-46.4 DATED 23.6.2017.) | 5 | EACH | 1,097.25 | ₹5,486.25 |
| 5 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING &
SIGNALING AND SITE CLEANING ETC. 1.10 Hire and labour
charges for coir rope fencing 25 mm dia rope single on 120 mm dia bamboo posts 1.40 m above G.L and 600 mm below G.L, 1.50 m apart including digging holes complete. | 1,275 | METER | 17 | ₹21,675 |
| 6 | Sub Total | - | - | - | - |
| 7 | GST 0% | 1 | Nos. | - | - |
| 8 | CESS 1% | 1 | Nos. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
Tendernotice_2.pdf
PDF • 1.15 MB
BOQ_2490389.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .