Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹3.8 Cr
EMD Value
₹2.0 L
Closing Date
30 Nov 2026, 3:30 pm5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
superintending engineer
SIPCOT Head office Egmore Chennai
Formation of Internal Roads including construction of RCC covered side drain and providing street lights to the internal Roads in EMC Campus at SIPCOT Industrial Park , Pillaipakkam
2026_SIPCT_727437_1
NIT.No.41/CD/T.No.41/2026-27
Open Tender
Civil Works - Roads
Lump-sum
SIPCOT Industrial Park, Pillaipakkam
Please refer Tender documents.
13 documents required · 13 mandatory
₹0
₹2.0 L
SIPCOT Head office
18 Nov 2026
18 Nov 2026
1 Dec 2026
18 Nov 2026
30 Nov 2026
23 Nov 2026
20 Nov 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1(Part-A) Formation of Road work | |||||
| 1.01 | Earth work excavation for cutting work in all class of soils such as hard stiff clay, stiff black cotton soil, etc., as per SS20-B ( HGS SS.20B) and deposting the same to the road side etc as per standard specification and as directed by SIPCOT Officers. | 1,340 | cum | - | - |
| 1.02 | Forming Subgrade using carted earth with a lead of 20Km having CBR value not less than 8% which has to compacted properly and form a stable embankment including cost , loading and unloading and labour for proper setting out, stripping and storing the top soil, if necessary compacting the original ground by vibratory roller to have a relative compaction of required proctor density, spreading the materials uniformly over the entire width of embankment in layers of not exceeding 500 mm compacted thickness, breaking clods, watering with all leads for water, compacting to 97% proctor density for the soil 0.5 meter height of sub grade under optimum moisture content with moisture content adjusted in the range of one per cent (1 %) above and two percent (2%) below the optimum moisture content determined as per IS. 2720 (Part VII) with power roller rolling and other construction equipments approved by engineer-in-charge and finishing the embankment at 97% proctor density including compaction to specified requirement, working in narrow width of embankment including hire and fuel charges for all tools and plants and all other incidental charges etc as per standard specification and as directed by SIPCOT Officers. | 1,499 | cum | - | - |
| 1.03 | Construction of Granular Sub - Base (GSB) to the required compacted thickness (Drainage layer) by providing approved Coarse graded material conforming to Grading- V of Table 400 - 1 and satisfying the physical requirement for material for GSB as per Table 400 - 2 of MORTH Rev.-5 including screening, spreading in uniform layers with motor grader on prepared surface, watering and premixing by mix in place method with rotavator at OMC, and compacting with Vibratory roller 80 to 100 KN static weight to achieve the desired density and fine dressing to required grade and cross slope as directed by the SIPCOT officers etc., complete including obtaining and transporting all materials from approved quarry site to work site with all lift and lead by mechanical transport, head load or any other mode of transporation including cost and conveyance of all materials, labour charges,hire charges and fuel charges for loader, water tanker with sprinkler,motor grader, vibratory road rollers and all other equipments, tools and plants, safety measures, testing required including all other incidental charges, etc., complete as per the standard specification as per clause 401 of MORTH Rev.-5 and as directed by the SIPCOT officers. | 600 | cum | - | - |
| 1.04 | Providing and laying, spreading and compacting graded stone aggreates to Wet Mix Macadam Base Course of 250mm compacted thickness specification in two layers of 150mm thick each or else as specified on the prepared sub base by providing approved Coarse graded material conforming to Table 400 - 13 and satisfying the physical requirement for material for WMM as per Table 400 - 12 of MORTH Rev.-5, including pre-mixing the materials with water at OMC in mechanical mix plant carriage of mixed matrerial by tipper to site laying in uniform layers with favours in subbase/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rental for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev.-5 and as directed by SIPCOT Officers. | 719 | cum | - | - |
| 1.05 | Providing and laying Prime coat over wet mix macadam surface using 7.00 Kg bitumen for 10 sqm area including cost and conveyance of bitumen binder including labour charges for preparing the surface and applying the required quantity as tack coat by bitumen sprayer etc as per standard specification and as directed by SIPCOT Officers. | 2,876 | sqm | - | - |
| 1.06 | Providing and laying Tack coat over treated wet mix macadam surface using 2.50 Kg bitumen to cut back for 10 sqm area including cost and conveyance of bitumen binder including labour charges for preparing the surface and applying the required quantity as tack coat by bitumen sprayer etc as per standard specification and as directed by SIPCOT Officers. | 2,876 | sqm | - | - |
| 1.07 | Providing and laying to 95 mm thickness Dense Bituminous macadam using 0.40 cum of 37.50 -13.20 mm IRC size graded metal 0.35 cum of 13.20 - 2.36mm IRC graded metal and 0.36 cum of 2.36mm and below IRC size HBG metal with 71.30 kg of VG40 bitumen for premixing for 10 Sq.meter includin cost and conveyance of all materials to CMP site including cost and conveyance of bitumen and other materilas to CMP site heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hoti mix plant 20-30 tonnes capacity, conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 95 mm with mechanical paver to the specified grades and cross sections and compaction by vibratory Pneumatic Roller to the required density etc., including labour charges for loading the bitumen in bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire,fuel charges for 20-30 tonnes capacity CMP unit bitumen boiler, tipper ttrucks, paver finisher/9 m paver finisher, vibratary/Pneumatic Roller, and al other tools & plants required including fuel and all other incidental charges etc as per standard specification and as directed by SIPCOT Officers. (Grade I) | 245 | cum | - | - |
| 1.08 | Providing and laying 40mm compacted thickness bituminous concrete using 0.13 cum of 19.0 - 9.5 mm graded IRC size HBG metal 0.17 cum of 9.5-2.36mm IRC graded metal and 0.26 Cum. of 2.36 mm and below size graded metal with 50.30 of bitumen grade VG 30 confirming to IS 73 for pre mixing for 10 Sq. meter and using materials as per table 500 - 17 and staifying the physical requirement for material for course aggregates for BC as per table 500 - 16 of MORTH REV-V including cost and conveyance of all materials to CMP site , heating the bitumen andaggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tonnes capacity, conveyin the mix by tipper trucks to paver site spreading the mix in required temperature for uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidation 80-100 kn vibratory/Pneumatic road roller to the required density etc., includinglabour charges for loading the bitumen in bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire, fuel charges for 20-30 tonnes capacity CMP unit bitumen boiler, tipper trucks, paver finaisher/9 m paver finisher /Vibratory/Pneumatice road roller , and all other tools and plants requried, including fuel and all other incidental charges etc as per standard specification and as directed by SIPCOT Officers. (Grade II) | 87 | cum | - | - |
| 1.09 | Filling with approved material deposited at site from roadway cutting and excavation for drain and foundation of other structures, spread, graded and compacted as per clause 407 for below Drain chute etc as per standard specification and as directed by SIPCOT Officers. | 19 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
ANNEXURE2.pdf
Tender Documents • 1.30 MB
ANNEXURE.pdf
Tender Documents • 0.66 MB
BOQ_873199.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .