Loading…
Loading…
6 results • Latest
Supply , delivery and lowering of 200mm dia OPVC line near M/s. Rajratan Global wire P.Ltd in Phase II at SIPCOT Industrial Park, Vallam vadagal
Supply , delivery and lowering of 200mm dia O’PVC line near M/s. Rajratan Global wire P.Ltd in Phase II at SIPCOT Industrial Park, Vallam vadagal
Operation and maintenance of the Truck terminal at SIPCOT Industrial Park Irungattukottai for a period of 36 months (three years)
Monthly rental charges for operation and Maintenance of truck parking in 9.75 cres. The rent including maintenance of 150 nos of vehicles parking area, 10 shops restuarent , kitchen office area security room, toilet block IWC Bathroom washbasin , septic tanks and PVC Tanks etc., complete and complying as directed by SIPCOT officers. cost of second year at 10 % increase in cost of 1st year and cost of third year at 10% increase in cost of 2nd year
Renovation work for the Administrative Office Building (G 1) at SIPCOT Industrial Park, Varapatti
PART A - BUILDING WORKS
Selection of Concessionaire for Development of Multi Modal Logistics Park (MMLP) under PPP mode on DBFOT basis with a concession period of 60 years in SIPCOT Industrial Park, Thoothukudi
Revenue Share
Appointment of Project Engineer (PMC) for Construction Management and Supervision, Including Third Party Inspection and O and M for 15 Years for the proposed Development of 60 MLD Sea water Desalination Plant at Village Mullakkadu in Thoothukud
During Construction period cost towards staff Remuneration
Formation of Approach Road (Ch 0 to 745 ) including Construction of Minor Bridges, Culverts, Storm Water Drain from Km 55/4 of NH 44 to SIPCOT Industrial Park, Shoolagiri - Phase - II
Road Work (Part-A)