Tender Value
₹4.1 Cr
EMD Value
₹4.1 L
Closing Date
30 Jan 2026, 6:00 pmClosed
The Chief Officer, Savli Nagar Seva Sadan, Savli
CONSTRUCTION WORK OF C.C. ROAD VERIOUS PLACE OF SAVLI AT SAVLI FOR SAVLI NAGAR PALIKA, SAVLI DISTRICT: VADODARA.
264184
JANUARY OF 2025-26
Open
Civil Works - Roads
Vadodara
1 document required · 1 mandatory
₹7,080
Chief Officer SAVLI Nagar Palika
₹4.1 L
12 Jan 2026
12 Jan 2026
12 Jan 2026
30 Jan 2026
12 Jan 2026
Technical bid & Price bid document
Submission Of EMD, Tender Fee & Up to Date:30/01/2026at the office of chief officer
supporting Document about eligibility in SAVLI Nagar Palika by speed post/RPAD only in sealed
hard copy. cover. Duly super scribed with name of work & tender
Date of Opening Of Price Bid On Date 31/01/2026and 11.00am(if possible)
Date of commencement of work Within 15 days from the issuance of work order
Security Deposit 5% of Estimated coast shall be paid immediately after
Defects liability period Three year from the date of completion of work.
GST 2% GST Deduct in each RA Bill
Labor cess 1% Labor cess Deduct in each RA Bill
Savli Nagar Palika Page
TPI/Consultancy Charge As per Govt. Rules Charge Deduct in each RA Bill
Other deductions Other standard deduction as per Govt. Rules
EPF/PF Account information Contractor shall be submitted EPF/PF Account
certificate and necessary document submitted EPF
query in every R.A. Bill
C Tenderer shall submit their offer i.e. technical bid as well as price bid in Electronic format on above
mentioned website.
D Submission of Tender Fees, Bid Security and other valid Documents:
Tender Fee inform of DD and Bid Security i.e. EMD in the form of DD in favor of " Chief Officer SAVLI
Nagar Palika " from any Nationalized / Scheduled Bankand shall be valid up to 120 Days. DD issued
after the last date of submission of tender will not be considered as valid or accepted in any case.
Hard Copy Submission Up to Date: 30/01/2026. at the office of chief officer SAVLI Nagar Palika by
speed post/RPAD only in sealed cover Duly super scribed with name of work & tender Notice No. Pre
Qualification of Contractor Will be Done on the Basis of Hard Copy Document and Same will be
verified On line.
E Submission of Hard Copy Document
a Valid Registration Certificate of Government Approved Contractor.
b Bank Solvency Certificate not less than 20% of estimated amount
c Register of Firms
d Partnership Deed (if applicable)
e Pan Card GST Registration certificate
F Tender Fee (DD )in in favor of " Chief Officer SAVLI Nagar Palika”
G EMD (DD) in favor of " Chief Officer SAVLI Nagar Palika”
H Turn Over certificate100% of Estimated Amount in Average of Last Three Year.
i Contractor should Have an Experience of One Work completion of similar work (Form 3A ) of
government or semi government in last Three year as under one work of estimated Amount
j Agency Must be Submit all Location of Site Visit Certificate Which is approved by Nagar Palkia
F Opening of Tender:
I After evaluation of Tech. Bid, price bid of only those bidders would be opened online who are
found to be eligible.
Ii Further details/clarification if any required will be available from Chief Officer, SAVLI Nagar
Palika SAVLI Phone No
G General instructions:
I The fees for on line tender document will not be refunded under any circumstances.
Ii EMD in the form specified in tender document shall only be accepted.
Iii Tenders without valid Tender document, fees, Earnest Money Deposit (EMD) and which do
not fulfill all or any of the condition or submitted incomplete in any respect will be rejected.
iv Conditional tender shall not be accepted.
Savli Nagar Palika Page
v This tender notice shall form a part of tender document.
vi The tenderers are advised to read carefully the "Instruction for Tenderer" and "Eligibility
Criteria" contained in the tender documents.
vii The Internet site address for E-Tender is http://Nagar Palika. nprocure.com and that of
corporate web site is www.nprocure.com
viii The Nagar Palika reserves the rights to reject any or all tenders without assigning any reason
ix Before the deadline for submission of bids, the Employer may modify the bidding documents
by Issuing corrigendum.
SAVLI Nagar Palika
Savli Nagar Palika Page
Savli Nagar Palika Page
03 - APPENDIX TO BID DETAILS
Name of Scheme :
District : Vadodara.
Name of Work : CONSTRUCTION WORK OF C.C. ROAD VERIOUS PLACE OF
SAVLI AT SAVLI FOR SAVLI NAGAR PALIKA, SAVLI
DISTRICT: VADODARA.
Tender Fee : Rs. 7080 (6000+ 1080)
Amount put to Tender : Rs.
Earnest Money : Rs.
Time limit for Completion : 09 (Nine) Months From the date of work order
Brief Description of Project:
Brief Description of works:
Savli Nagar Palika Page
The main scope of works/service to be provided to the contractor under this bid will be as under
Name & address of Executing Authority:
The Civil Engineer
SAVLI Nagarpalika
SAVLI,Dist : Vadodara
Name & address of Next higher Authority:
SAVLINagarpalika
SAVLI,Dist : Vadodara
President and vice-president
SAVLINagarpalika
Dist : Vadodara
Savli Nagar Palika Page
Savli Nagar Palika Page
4-NOTICE INVITING TENDERS
Name of work : CONSTRUCTION WORK OF C.C. ROAD VERIOUS PLACE OF SAVLI AT SAVLI FOR SAVLI
NAGAR PALIKA, SAVLI DISTRICT: VADODARA
1. Tender is invited on behalf of SAVLI Nagar Palika. The estimated cost of work is Rs.
40566687.00this estimate however, is given as a rough guide.
2. The work is required to be completed within 09 (Nine) Months as per the terms of the contract
3. The contractors whose names are on the approved list of contractors of Gujarat State R & B Deptt.
/ W.R.D. in Class ‘A’ and above and who are Resisted with R&B dept. in Building category -III
will be permitted to tender. Not more than one tender shall be submitted by a contractor or by
neither a firm of contractors nor two or more concerns in which an individual is interested as a
proprietor and / or a partner. If they do so, all such tenders shall be liable to be rejected.
4. Bid Document can be downloaded & submitted in Electronic Format on Online website:
www.tender.nprocure.comDate up to 30/01/2026.
5. Copies of other drawings and documents pertaining to tender and signed for the purpose of
identification by the Accepting Officer or his accredited representative will be open for inspection
for tenderer at the following offices during working hours.
(a) Chief Officer ,SAVLI Nagar Palika,.SAVLI.
6. Tenderers are advised to visit the site sufficiently in advance of the date fixed for submission of
the tender. A tenderer shall be deemed to have full knowledge of all the relevant documents
samples, site etc; whether he inspects them or not.
7. Submission of a tender by tenderer implies that he has read this notice and all other contract
documents and has made himself aware of the scope and specification of the work to be done and
of conditions and local conditions and other factors bearing on the execution of the works.
8. The bidder should quote his bid premium or rebate at the end of Schedule-B. If he do not wish to
quote premium or rebate, he should indicate “at par” in the blank space preceding “% above /
below” in Schedule-B. Thereafter he should work out and indicate the offered bid amount both in
words and figures in Schedule-B.
9. All rates shall be quoted on E-Tendering System.
Savli Nagar Palika Page
10. The tender for the works shall not be witnessed by a contractor or a contractor who himself /
themselves has/have tendered or who may and has/have tendered for the same works. Failure to
observe this condition shall render the tender of the contractor tendering, as well as of those
witnessing the tender, liable to rejection.
11. The offered bid will be opened at 11.00 hours on date 31/01/2026 in the presence of bidders who
may choose to remain present in the office of the Bid opening Authority Specified in Bid
12. A Tenderer shall submit the tender who satisfies each and every condition laid down in this notice
and tender documents, failing which the tender will be liable to be rejected.
13. SAVLI Nagar Palika does not bind itself to accept the lowest or any tender or to give any reasons
for the decision taken.
14. This notice of tender shall form part of the contract documents.
SAVLI Nagar Palika,
Savli Nagar Palika Page
PERCENTAGE RATE
Savli Nagar Palika Page
05 PERCENTAGE RATE TENDER AND CONTRACT FOR WORKS
1. Competency of Tenderer – No contract will be awarded except to responsible bidders capable of
performing the class of works contemplated. Before the award of the contract, any bidder may
be required to show that he has the necessary facilities, experience, ability and financial
resources to perform the work in satisfactory manner within the time stipulated. Contractor may
be required to furnish the department with the statement of their experience and their financial
2. Tenderer will be deemed to have inspected the site and have satisfied to the nature of all works,
all existing roads, water-way and other means of communication and access to and from the site
and work and the building that may be required for temporary purpose in connection with the
construction, completion and maintenance of the works and must make his own enquiries as to
work, yard sites and depot, and dumps and as to acquisition of such additional sites and areas as
may be necessary for temporary purpose for construction, completing and maintaining the
2.1 (i) The Bids shall be offered in Electronic format only on online website
www.nprocure.com till the date and time shown on Page 2 ..
(ii) Payment of Tender Fee, Earnest Money Deposit in form of Demand Draft and DD
respectively, shall be submitted in electronic format through online (by scanning) while uploading
the bid. This submission shall mean that EMD & tender fee are received for purpose of opening
the bid. Accordingly offer of bidder whose EMD & tender fees is received electronically. However
for the purpose of realization of D.D. bidder shall send the D.D. in original through RPAD/Speed
post only so as to reach to Chief Officer SAVLI Nagar Palika, SAVLI within mentioned dates from
the last date of uploading.
3 Payment:- The tenderer must understand clearly that the rates quoted are for completed works
and include all costs of labour, scaffolding plant, supervision, service works, power, royalties and
octroi etc. , and to include all extras to cover the cost of night work if and when required and no
claim for additional payment beyond the price/rates quoted will be entertained and the tenderer
will not be entitled subsequently
Contractors to please read this carefully: (A) The percentage in Schedule ‘A’ must be given in
figures. Amount thus worked out must also be entered in column and must be struck out
whichever is not applicable by the tenderer.
(B) If the tender is taken in favor of the company, a power of attorney in favor of the person who
may have signed the tender for the company must accompany the tender.
Savli Nagar Palika Page
(C)Solvency certificate of a Bank or a Revenue officer of an amount not less than 20% of the
tender cost plus the amount of works on hand still to be executed will have to be produced by
the contractor.
4. The Contractor shall have to furnish PAN No. and I.T.ward under which he is assessed..
5. Copies of certificate of previous experience, if any, must accompany the tender.
6. Declaration showing all works on hand with the Contractor and the value of works that remains
to be executed in each case must accompany the tender.
7. In addition to the above, the tender will also be liable to be rejected outright if.
(i) The bidder proposes any alteration in the work specified or in the time allowed for
carrying out the work or any condition or correction made in any code or mode of Schedule-B or
Specifications.Conditional tender will be out right rejected.
Signature of the Contractor Chief Officer
SAVLI Nagar Palika
Savli Nagar Palika Page
Savli Nagar Palika Page
6- DECLARATION FORM
(i) I/We hereby declare that I/We have visited the site and fully acquainted myself/ourselves with the local
situations regarding materials, labour and other factors pertaining to the work before submitting this
(ii) I /We hereby declare that I/We have carefully studied the conditions of contract, specifications
and other documents of this work and agree for execute the same accordingly.
Signature of the Contractor Chief Officer
SAVLI Nagar Palika
Savli Nagar Palika Page
Savli Nagar Palika Page
7- GENERAL RULES AND DIRECTIONS FOR THE GUIDANCE OF CONTRACTORS
1. All works proposed to be executed by the contractor shall be notified in a form of invitation to
tender pasted on a board hung up in the office of the Chief Officer SAVLI Nagar Palika and signed
by the Chief Officer SAVLI Nagar Palika.
This form will state work to be carried out as well as the date of submitting and opening tenders
and the time allowed for carrying out the work, also the amount of earnest money to be
deposited with the tender and the amount of the security deposit to be paid by the successful
tenderer and percentage, if any, to be deducted from bill. It will also state whether a refund of
quarry fees, royalties, octroi dues and ground rents will be granted. Copies of the specifications,
designs and drawing and estimated rates, and any other documents, required in connection with
work which shall be signed by the Chief Officer SAVLI Nagar Palika for the purpose of
identification shall also be open for inspection by Contractor at the office of the Chief Officer
SAVLI Nagar Palika during office hours.
Where the works are proposed to be executed according to the specifications recommended by a
contractor and approved by a competent authority on behalf of the SAVLI Nagar Palika, such
specifications with designs and drawing shall form part of the accepted tender.
2. The Bidder or the person authorized to sign digitally on behalf of the bidder shall sign the bid
document. The copy of legal status of bidder (Partnership Deed or Articles of Association of the
company) along with other documents to be submitted physically.
3. Under no circumstances shall any Contractor be entitled to claim enhanced rate for any items
in this contract.
4. Any contractor shall, unless exempted in writing by the Chief Officer SAVLI Nagar Palikaconcerned,
produce along with this tender a solvency certificate of his financial ability from the Collector of
the District within which he resides or a Banker’s certificate. If he fails to produce such a
certificate his tender will not be considered.
5. The measurements of work will be taken according to the usual method of the Public Works
Department and no alternative methods will be accepted. The Chief Officer SAVLI Nagar Palika’s
decision as to what is the usual method in use in the Nagarpalika Works Department will be final.
6. The Insurance Company’s bond will not be accepted against the security deposit.
6-A In event of any error or discrepancy in write up of tender documents the contractor will not take
any undue advantage of such error or discrepancy and The Chief Officer SAVLI Nagar Palika shall
have powers to interpret and decide correct meaning of contradictory erroneous writing .
Savli Nagar Palika Page
7. The contractor will have to construct a shed for storing controlled and valuable materials at work-
site having double locking arrangement. The materials will then be taken for use in the presence
of the Department person. No materials will be allowed to be removed from the site of work.
8. Controlled materials (Essentiality Certificate)
(ii)The contractor shall submit to the Chief Officer on close of every Calendar month the monthly
returns in the prescribed forms as to the receipts and actual use of the materials during the
(iii) The contractor shall permit The Chief Officer SAVLI Nagar Palika or his representative to
inspect the stock of the materials stored by him at any time whenever the Chief Officer or his
representative so desire (s).
9. The tender for the work shall remain open for a period of 120 days counted from the last date of
on line submission of bid.
10. Before starting the line out work contractor should carry out soil testing at his own cost and
submit the same to consultant.
Savli Nagar Palika Page
08 TERMS & CONDITIONS OF CONTRACT
CLAUSE 1: Security deposit:-
Savli Nagar Palika Page
The contractor shall have to pay Security deposit 2.50% of estimated amount within the period of ten
days from the date of receipt of acceptance letter. If the Security deposit is not paid within the specified
time, work order shall not be issued till the issue about delay is finally decided by the competent
CLAUSE 2: Liquidated damages for delay:-
(i ) If the Contractor fails to complete the work under contract by the stipulated date, he shall pay
liquidated damages of at the rate of 0.01* percentage of the contract value per day from the date of
delaying the said work up to the date of completion and handing over to the SAVLI Nagar Palika.
(ii ) However also if the contractor fails to complete any part of the work as designed in Schedule‘ c ‘ by
the time indicated against such part, he shall pay Liquidated damages per day from the date of delaying
the said part of the work up to the date of completion of the said designated part at the rates shown in
the said schedule of the contract value of such part for such failure till the designated part is completed.
*AS corrected vide B & C D GR No. TNC – 1091 – 1B – 10 / (11) – C, dated 29-6-92.
(iii) The aggregate maximum of liquidated damages payable under clause No.2 shall not exceed
Percentage of contract value per day and shall be subject to the maximum amount of 10 % of the
estimated amount put to tender.
(iv) Delays requiring payment of ten percentage liquidated damages of the amount put to tender for
performance shall be sufficient causes for termination of contract and for forfeiture of security deposit
including amount of performance bond in respect of works estimated to cost more than Rs.15 lacs, and
Performance and registration of the contractor shall also be kept in abeyance for three years from the
date as fixed in all cases. (See Schedule (C) on Page No
CLAUSE 3 : Default by Contractor :
If the Contractor shall neglect or fail to proceed with the work with due diligence or if he violates any of
the provision of the Contract, the The Chief Officer SAVLI Nagar Palika shall give the Contractor a notice,
identifying deficiencies in performance and demanding corrective action. Such notice shall clearly state
that it is given under the provision of this clause. After service of such notice, the contractor shall not
remove any plant, equipment and material from the site. The SAVLI Nagar Palika shall have a lien on all
such plant, equipment and material from the date of such notice till the said deficiencies have been
corrected as mentioned in the said notice.
If the contractor fails to take satisfactory corrective action within ten days after receipt of such notice,
the Engineer-in-charge on behalf of SAVLI Nagar Palika shall terminate the contract in whole. In case the
entire contract is terminated, the amount of security deposit and performance bond if any together with
the value of the work done but not paid for, shall stand forfeited to the SAVLI Nagar Palika. The plants,
equipment and materials, held under this clause shall then be at the disposal of the SAVLI Nagar Palika to
recover the amount equivalent to the liquidated damages and registration of the contractor shall be kept
in abeyance for three years from the date as fixed in all such cases.
The Chief Officer SAVLI Nagar Palika if necessary shall direct that a part or the whole of such plant,
equipment and material be removed from the site within a stipulated period. If the Contractor fails to do
so, the Engineer-in-Charge shall cause them or any part of them to be sold holding the net proceeds of
such sale to the credit of the Contractor. After settlement of accounts, the lien by the SAVLI Nagar Palika
of the contractor’s remaining plant equipment and balances of materials shall be released.
Savli Nagar Palika Page
Termination of the contract in whole shall be an adequate authority for the Engineer-in-charge to
demand discharge of the obligations from the guarantors of the security for the performance.
If the progress of any particular portion of the work under Contract is unsatisfactory, the The Chief
Officer SAVLI Nagar Palika shall, notwithstanding that the general progress of the work is satisfactory, in
accordance with Clause 2 be entitled to take necessary action under Clause 3 after giving the Contractor
ten day’s notice in writing and the contractor shall have no claim whatsoever for any compensation for
any loss caused to him due to such action.
(Clause 1,2,3 and 4 are substituted vide GR NO. TNC –1091/IB-10/(11)-C , dated 15-10-91 & modified
by GR dated 29-10-91 &G.R.No. TNC-1088/IB/18/(13)-C dated 31-8-94 and No. TNC/10/2002/14-C,
dated 28-4-03 and 10-9-03)
CLAUSE 5: Extension of time limit:
If the contractor shall desire an extension of the time for completion of the work on the ground of his
having been unavoidably hindered in its execution or any other ground he shall apply in writing to the
Engineer-in-charge before the expiration of the period stipulated in the tender or before the expiration
of 30 days from the date on which he was hindered whichever is earlier and the Engineer-in-charge may,
if in his opinion, believe that there are reasonable grounds for granting an extension, grant such
extension as he thinks necessary or proper. The decision of the The Chief Officer SAVLI Nagar Palika in
this matter shall be final
As soon as the work is completed the contractor shall give a notice of such completion to the Engineer-
in-charge and on receipt of such notice the Engineer-in-charge shall inspect the work and if he is satisfied
that the work is completed in all respect than:-
(i)For all works costing upto Rs.50 lacs (amount put to tender) the final measurements shall be recorded
within 45 days from the date of physical completion of the work and the final bill shall be prepared
within 45 days from the date of recording final measurement. The completion certificate shall be issued
within one month from the date of final measurement subject to the contractor fulfilling his obligation as
provided in the contract and subject to the work being complete in all respects.
(ii) In respect of works costing more than Rs.50 lacs (amount put on tender), the final measurements
shall be recorded within 75 days from the date of physical completion of the work and the final bill
shall be prepared within 75 days from the date of recording final measurements subject to the
contractor fulfilling his obligations as provided in the contract and subject to the work being complete
in all respects.
When separate period of completion have been specified for items or groups of items, the Engineer-in-
charge shall issue separate completion certificate for such items or groups of items.
No certificate of completion shall be issued nor shall the work be considered to be complete till the
contractor shall have removed from the premises, on which the work has been executed, all scaffolding,
Savli Nagar Palika Page
sheds and surplus materials, except such as are required for rectification of defects; rubbish and all huts
and sanitary arrangements required for his workmen on the site in connection with the execution of the
work, as shall have been erected by the contractor for the workmen and cleared all dirt from all parts of
building(s) in, upon or around which the work has been executed or of which he may have possession for
the purpose of the execution thereof and cleared floors, gutters and drains, cased doors and sashes,
oiled locks and fastenings labeled keys clearly and handed them over to the Engineer-in-charge or his
representative and made the whole premises fit for immediate occupation or use to the satisfaction of
the Engineer-in-charge . if the contractor shall fail to comply with any of the requirements of these
conditions as aforesaid, on or before the date of completion of the works, the Engineer-in-charge may
at the expenses of the contractor, fulfill such requirements and dispose of the scaffolding, or surplus
materials and rubbish etc. as he thinks fit and the contractor shall have no claim in respect of any such
scaffolding or surplus materials except for any sum actually released by the sale thereof less the Cost of
fulfilling the requirements and any other amount that may be due from the contractor. If the expenses
of fulfilling such requirements are more than the amount realized such disposal as aforesaid the
contractor shall forthwith, on demand, pay such excess. The Engineer-in-charge shall also have the rights
to adjust the amount of excess against any amounts that may be payable to the contractor.
No payment shall be made for any work, estimated to cost less than rupees one thousand till after the
whole of the said work shall have been completed and a certificate of completion given. But in the case
of works estimated to cost more than rupees one thousand, the contractor shall on submitting a monthly
bill therefore, be entitled to receive payment proportionate to the part of the work then approved and
passed by the Engineer-in-charge, whose certificate of such approval and passing of the sum so payable
shall be final and conclusive against the contractor., All such intermediate payments shall be regarded as
payments by way of advance against the final payments only and not as payments for work actually done
and completed and shall not preclude the Engineer-in-charge from requiring bad, unsound, imperfect or
unskilled work to be removed and taken away and reconstructed or re-erected, nor shall any such
payment be considered as an admission of the due performance of the contractor or any part therefore
in any respect or the accruing of any claims, nor shall it conclude, determine, or affect in any way the
power of the Engineer-in-charge as to the final settlement and adjustment of the accounts or otherwise
or in any other way vary or effect the contract. The final bill shall be submitted by the contractor within
one month of the completion of the work, otherwise the Engineer-in-charges certificate of the
measurements and of the total amount payable for the work shall be final and binding on all parties.
measurements and of the total amount payable for the work shall be final and binding on all parties.
The rates for items of works shall be valid only when the items concerned is accepted as having been
competed fully in accordance with the sanctioned specifications. In cases where the items of work are
accepted as not so completed, the Engineer-in-charge may make payment on account of such items at
such reduced rates as he may consider reasonable in preparation of final or on account bill.
CLAUSE 9 Bills to be submitted monthly:
A bill shall be submitted by the contractor each month on or before the date fixed by the Engineer-in-
charge for all works executed in the previous month and Engineer-in-charge shall take or cause to be
taken the requisite measurements for the purpose of having the same verified and the claim, so far as it
Savli Nagar Palika Page
is admissible, shall be adjusted, if possible, within ten days from the presentation of the bill. If the
contractor does not submit the bill within the time fixed as aforesaid, the Engineer-in-charge may depute
a subordinate to measure up the said work in the presence of the contractor or his duly authorized agent
whose countersignature to the measurement list shall be sufficient warrant and the Engineer-in-charge
may prepare a bill from such list which shall be binding on the contractor in all respects.
The contractor shall submit all the bills on the printed forms to be had on application at the office of the
Engineer-in-charge. The charges to be made in the bills shall always be entered at the rates specified in
the agreement or at the partly reduced rates subject to the approval by the Engineer-in-charge in the
case of items not completed/executed as per agreements or in the case of any extra work ordered in
pursuance of these conditions and not mentioned or provided for in the tender, at the rate here in after
provided for such work.
(1) The contractor shall execute the whole and every part of the work in the most substantial and
workman-like manner and both as regards materials and in other respects in strict accordance with
specifications.
The contractor shall also confirm exactly, fully and faithfully to the design, drawings and instructions in
writing for the work signed by the Engineer-in-charge. The design and the drawings shall be lodged in the
office of the site Engineer-in-charge to which the contractor shall be entitled to have access for the
purpose of inspection at such office during office hours. Where the instructions referred to above are
not contained in separate letters addressed to the contractor the same shall be recorded in the work-
order book, which shall be maintained and kept on the site of the work. The contractor shall be required
to sign such entire in the work-order book in token of having noted the instructions. However, if the
contractor fails to sign the work-order book for any reason whatsoever, the entry of the instructions in
the work-order book shall be deemed to be the due notice to him of the said instructions. The work-
order book shall be open for inspections to the contractor on the site of the work during office hours.
(2) The contractor will be entitled to receive one copy of the accepted tender along with the work order
free of cost and will also be entitled to receive three sets of contract and working drawings according to
the progress of work as and when needed, free of cost.
(3) The several documents forming the contract are essential parts of the contract and requirements
occurring in one are binding as through occurring in all. They are intended to be mutually explanatory
and complimentary and to describe and provide for a complete work.
In the event of any discrepancy in the several documents forming the contract or in any one document,
the following order of precedence should apply.
(a) Dimension and quantities : (i) Drawings (ii) Schedule-B of the Tender form (iii) specification.
On drawings, figures dimensions, unless obviously incorrect, will be followed in preference to scaled
(b) Description :(I) Schedule-B of the Tender form :- (ii) Drawings (iii) Specifications.
Savli Nagar Palika Page
In the case of effective description or ambiguity, the Engineer-in-charge is entitled to issue further
instructions directing in what manner the work is to be carried out. The contractor cannot take any
advantage of any apparent error or omission in drawings or specifications and the Engineer-in-charge
shall be entitled to make corrections and interpretations as necessary to fulfill the plans and
specifications.
The Engineer-in-charge shall have power to make any alterations in or addition to the original
specifications, drawings, designs and instructions that may appear to him to be necessary or advisable
during the progress of the work and the contractor shall be bound to carry out the work in accordance
with any instructions in this connection which may be given to him in writing signed by the Engineer-in-
charge and such alternation shall not invalidate the contract and additional work which the contractor
may be directed to do in the manner above specified as part of the work shall be carried out by the
contractor on the same conditions in all respects on which he agreed to do the main work and at the
same rate as out by the contractor on the same conditions in all respects on which he agreed to do the
main work and at the same rate as are specified in the tender for the main work.
13.1 Except that when the quantity of any item exceeds the quantity as in the tender by more than
30% the contractor will be paid for the quantity in excess of 30 % at the rate entered in the S.O.R. of the
year during which the excess in quantity is first executed and for the materials consumed in excess
quantity the rate for the materials to be charged would be the basic rate taken into account for fixing the
rate for the S.O.R. above instead of the rate stipulated in schedule – A.
13.2. If the additional or altered work includes any class of work for which no rate is specified in this
contract, then such class of work shall be carried out.
(i) At the rate derived from the item within the contract which is comparable to the one involving
additional or altered class of work, where there are more than one comparable items, the item of the
contract which is nearest in comparison with regard to class or classes of the work involved shall be
selected and the decision of the Superintending Engineer as to the nearest comparable item shall be final
and binding on the contractor.
(ii) If the rate cannot be derived in accordance with (i) above, such class of works shall be carried out at
the rate entered in the Schedule of Rates of the Division for the year in which the tender was received,
increased or decreased by the percentage by which the tender amount is more or less as compared to
the amount arrived at the rates in the “Schedule of Rates” of the Division in the year in which the tender
was received. If the Schedule of rates of the Division does not contain all the items the percentage
increase or decrease of the tender shall be calculated considering such items which were included in the
“Schedule of Rates “of the Division for the year and for materials consumed on such item the rate to be
charged would be the basic rate taken into account for fixing the rate in S.O.R. referred to above instead
of the rate. Stipulated in Schedule “A”
(iii) If it is not possible to arrive at the rate from (i) and (ii) above, such class of work shall be carried out
at the rate decided by the competent authorities on the basis of detailed rate analysis after hearing the
Savli Nagar Palika Page
contractor before a Committee of two Superintending Engineers stationed at the same place or the
13.3 If the additional or altered work, for which no rate is entered in the “Schedule of Rates” of the
Division is ordered to be carried out before the rate is agreed upon, then the contractor shall within
seven days of the date of receipt by him of the order to carry out the work, inform the Engineer-in-
charge of the rate, which it is his intention to charge for such class of work and if the Engineer in charge
does not agree to this rates, he shall by notice in writing be at liberty to cancel his order to carry out such
class of work and arrange to carry it out in such manner as he may consider it advisable, provided always
that if the contractor shall commence work or incur any expenditure in regard thereof before the rates
shall have been determined as lastly herein before mentioned, then in such cases he shall only be
entitled to be paid in respect of the work carried out or expenditure incurred by him prior to the date of
the determination of the rate as aforesaid according to such rate or rates as shall be fixed by the
Engineer-in-charge. In the event of the dispute, the decision of the Superintending Engineer of the Circle
shall be final.
Where, however, the work is to be executed according to be the designs, drawings and specification
recommended by the contractor and accepted by the competent authority, the alternation above
referred to shall be within the scope of such designs, drawing and specifications appended to the tender.
The time limit for the completion of the work shall be extended in the proportion that the increase in the
cost occasioned by shall be final and conclusive.
13.4 For excess in item of well sinking the rates for sinking in depth beyond the designed depth shall
be as per the rate quoted by the contractor in the statement of variation, if no rates of variation in
sinking are quoted the rate payable shall be the tender rate for sinking at designed level increased by the
difference of schedule of rate for sinking at designed depth and sinking at final depth.
No claim for any payment of compensation for change or restriction of work:
If at any time after the execution of the contract documents the Engineer-in-charge shall for any reason
whatsoever, require the whole or part of the work, as specified in the tender, be stopped for any period
or shall not require the whole or part of the work to be carried out at all or to be carried out by the
contractor, he shall give notice in writing, stating the fact to the Contractor who shall thereupon suspend
or stop the work totally or partially, as the case may be. In any such case , except as provided hereunder,
the Contractor shall have no claim to any payment or compensation whatsoever except as provided
hereunder on account of any profit or advantage which he might have derived from the execution of the
work in full but which he did not so derive in consequence of the full amount of the work not having
been carried out, or on account of any loss that he may be put to on account of materials purchased or
agreed to be purchased or for unemployment of labour required by him. He shall not have also any claim
for compensation by reason of any alteration having been made in the original specifications, drawings,
designs and instructions which may involve any curtailment of the work as originally contemplated.
(1) However, the contractor will be entitled for compensation for loss, if any on the date of notice, for
the purchased materials or for the contract executed for the material to be purchased for such work.
Such compensation will be paid only for actual loss for materials, if such materials so purchased or
Savli Nagar Palika Page
agreed to purchase is of required quantity/quality and was purchased/ contracted to be purchased only
for the same work. But no compensation shall be granted to contractor on material for which advance
has been given to contractor by SAVLI Nagar Palika. The amount of loss for such claim will be decided by
in charge Engineer-in-charge.
(2) The contractor also will be entitled for compensation of unemployed labourers for 7 days from the
date of notice provided that in that opinion of Engineer-in-charge such labourers working for 7 days prior
to the notice and would not be in a position to get employment elsewhere within 7 days from the date of
such notice . The contractor should try to employ such unemployed labourers at other places from the
date of such notice.
In case the Contractor does not agree with the decision of Chief Officerregarding the amount of
compensation or loss; it will be open for the contractor to appeal to Superintending Engineer-in –charge
within one month from the date of knowledge of such decision. In such case the decision of
Superintending Engineer will be final and binding to the Contractor.
The Contractor shall not be entitled for loss of any expected profit of such work.
(Vide G.R. NO. SSR/1090/IB/247(2) /C, dated 28-6-1993 as amended by GR of even number dated 11-2-
CLAUSE 15 : Action & compensation in case of bad work :
If at any time before the expirey of Defects Liability period as detailed in Clause 17-A. It shall appear to
the Engineer-in-charge or his sub-ordinate in charge of the work that/any work has been executed
unsound, imperfect or unskilled workmanship or with materials of inferior quality or that any materials
or articles provided by him for the execution of the work are unsound , or of a quality inferior to that
contracted for or are otherwise not in accordance with the contract, it shall be lawful for the Engineer-in-
charge to intimate this fact in writing to the contractor and then notwithstanding the fact that the work,
materials or articles complained for may have been passed, certified and paid for the contractor shall be
bound forthwith to rectify, or remove and reconstruct the work so specified in whole or in part as the
case may require, or if so required, shall remove the materials or articles so specified in whole or in part
and provide other proper and suitable materials or articles at his own charge and cost, and in the event
of his failing to do so within a period to be specified by the Engineer-in-charge in the written intimation
aforesaid, the contractor shall be liable to pay compensation at the rate of one percent on the amount of
the estimate of the rectification for every day not exceeding ten days during which the failure so
continues and in the event of any such failure as aforesaid continuing beyond ten days, the Engineer-in-
Charge may rectify or remove, and re-execute the work or remove and replace the materials complained
of as the case may be at the risk and expense in all respects of the contractor. Should the Engineer-in-
charge consider that any such inferior work or materials as described above may be accepted or made
use of, it shall be within his discretion to accept the same at such reduced rates as he may fix therefore .
However, the contractor shall be responsible for normal maintenance of the work till the final bill for the
work is prepared by the departmental Officer.
Clause 15 A : Defect liability period :
The contractor shall be responsible to make good and remedy at his own expenses any defect which may
develop or may be noticed before the period mentioned hereunder from the certified date of
Savli Nagar Palika Page
completion. The Engineer-in-charge shall give the contractor a notice in writing about the defects and
the contractor shall make good the same within 15 days of receipt of the notice. In the case of failure on
the part of the contractor, the Engineer-in –charge may rectify or remove or re-execute the work at the
risk & cost of the contractor. The Engineer-in-charge shall be entitled to appropriate the whole or any
part of the amount of security deposit towards the expenses, if any, incurred by him in rectification,
removal or re-execution
CLAUSE 16: Work to be open to inspections – Contractor or responsible agent to be present: -
All Works under or in course of execution or executed in pursuance of the contract shall, at all times be
open to the inspection and supervision of the Engineer-in-charge and his subordinates and the
Contractor shall, at all times during the usual working hours, and all other times for which reasonable
notice of the intimation of the Engineer-in-charge or his subordinate to visit the works shall have been
given to the contractor, either himself be present to receive orders and instructions or have a
responsible agent duly accredited in writing present for that purpose. Orders given to the contractor’s
duly authorized agent shall be considered to have the same force and effect as if they had been given to
the Contractor himself.
(i) G.R.B. & CD NO. RGN-6090-UO 24 (42)-C, dated 26-11-90.
Employment of a qualified site Engineer by the Contractor. The Contractor shall. Employ full-time
technically qualified staff during the execution of this work as under:-
1. Two graduate Civil Engineers and three diploma Civil Engineers when cost of the work to be executed
is more than Rs.50 lakhs.
2. One graduate & two Diploma, Civil Engineers when the cost of the work to be executed is more than
Rs.15 lakhs but less than Rs.50 lakhs.
3. Minimum two Diploma Civil Engineer when the cost of work is less than Rs.15 lakhs but more than
4. Minimum one Diploma Civil Engineers for the work when the cost of work to be executed is less than
Rs. 5 lakhs. The Engineer so employed for the SAVLI Nagar Palika work must have sufficient experience to
handle the work independently. Such an Engineer shall have to stay at the site of work and he shall not
be entrusted with other duty except this work.
In case the contractor or partner of the contractor firm is a Civil Graduate Engineer, Employment of
separate Engineer will not be necessary provided that the Engineer partner himself attends the
execution of the work on the site.
CLAUSE 18 : Notice to be given before work is covered up :
The contractor shall give not less than five day’s notice in writing to the Engineer-in-charge or his
subordinate in charge of the work before covering up or otherwise placing beyond the reach of
measurement any work in order that the same may be measured and correct dimensions there of taken
before the same is so covered up or placed beyond the reach of measurement and if any work shall be
Savli Nagar Palika Page
covered up or placed beyond the reach of measurement without such notice having and if any work shall
be covered up or placed beyond the reach of measurement without such notice having been given or
consent obtained , the same shall be uncovered at the contractor’s expenses and in default thereof no
payment or allowance shall be made for such work or for the materials with which the same was
If the contractor or his workmen, or servants shall break , deface, injure or destroy any part of the
building or the work in a question in/on which they may be working or any building , road, fence,
enclosure or grassland or cultivated ground contiguous to the premises on which the works or any part
thereof is being executed or if any damage shall be done to the work from any causes whatever before
damage occurred/caused due to normal flood or rain or if any imperfections become apparent in it
within three months from the grant of a certificate of completion, final or otherwise by the Engineer-in-
charge , the contractor shall make good the same at own expenses or in default, the Engineer-in-charge
may cause the same to be made good by other contractor, and deduct the expenses (of which the
certificate of the Engineer-in-charge shall be final ) from any sums that may thereafter become due to
the contractor or from his security deposit or the proceeds of sale thereof or a sufficient portion thereof.
Neither party shall be liable to the other for any loss or damage occasioned by or arising out of God, such
as Unprecedented flood, Volcanic eruption, earthquake or other convulsion of nature and other acts
such as but not restricted to general strike, invasion, the acts of foreign countries, hostilities, or war like
operations before or after declaration of war, rebellion, military or Usurped power which prevent
performance of the contract and which could not have been foreseen or avoided by a prudent person.
Note:“Unprecedented flood” means the flood crossing the High Flood Level of the past ……... Year(s) this
is on the available record.
(Modified Vide R& B D.G.R. No/ TNC – 1096 – IB –143 – (16) – C dated 11-1-99)
CLAUSE 20: Contractor to supply plant, ladders, scaffolding etc. and is liable for damage arising from
non-provision of lights, fencing etc. :
The contractor shall supply at his own cost all materials (except such special materials if any, as may, in
accordance with the contract to be supplied from the Public Works Department Stores), plant, tools,
appliances, implements, ladders, cordage, tackle, scaffolding, and any temporary works which may be
required for the proper execution of the work whether in the original, altered or substituted form and
whether included in the specifications, or other documents forming part of the contract or referred to in
these conditions or not and which may be necessary for the purpose of satisfying or complying with
requirements of the Engineer-in-charge as to any matter or to which under these conditions he is
entitled to be satisfied or which he is entitled to require together with carriage therefore to and from the
work. The contractor shall also supply without charge the requisite number of persons with the means
and materials necessary for the purpose of settings out works and counting , weighing and assisting in
the measurement or examination at any time and from time to time, of the work or the materials, failing
this, the same may be provided by the Engineer-in-charge at the expenses of the Contractor and the
expenses may be deducted from any money due to the Contractor under the contract or from his
Savli Nagar Palika Page
security deposit, or proceeds of sale thereof or of a sufficient portion thereof. The contractor shall
provide all necessary fencing and lights required to protect the public from accident and shall also be
bound to bear expenses of defense of every suit, action or other legal proceeding, at law that may be
brought by any person for injury sustained. Owing to neglect of the above precautions and to pay any
damages and costs which may be awarded in any such suit, action or proceedings to any such person , or
which may, with the consent of the Contractor, be paid in compromising any claim by any such person.
The Contractor shall provide suitable scaffolds and working platforms, gangways and stairways, and shall
comply with the following regulation in connection therewith.
(a) Suitable scaffolds shall be provided for workmen for all works that cannot be safely done from a
ladder or by other means.
(b) A scaffold shall not be constructed, taken down or substantially altered except
(i) Under the supervision of a competent and responsible person.
(ii) Appointed by contractor and by competent workers possessing adequate experience in this kind of
(c) All scaffolds and appliances connected therewith and all ladders shall
(g) Be of sound material
(ii) Be of adequate strength having regard to the loads and strains to which they will be subjected and
(iii) Be maintained in proper condition
(d)Scaffolds shall be so constructed that no part thereof can be displaced in consequence of normal use.
(e) Scaffolds shall not be overloaded and so far as practicable the load shall be evenly distributed.
(f) Before installing the lifting gear on scaffolds, special precaution shall be taken to ensure the strength
and stability of the scaffolds.
(g) Scaffolds shall be periodically inspected by a competent person.
(h) Before allowing a scaffold to be used by his workmen, the Contractor shall, whether the scaffold has
been erected by his workmen or not, take steps to ensure that it complies fully with the regulation
herein specified.
( i ) Working platforms, gangways shall –
(i) Be so constructed that no part thereof can dag unduly or unequally.
(ii) be so constructed and maintained having regard to the prevailing conditions as to reduce as far as
practicable risks of persons tripling or slipping and
(iii) be kept free from any unnecessary obstruction.
Savli Nagar Palika Page
( j ) In the case of working platforms, gangways working places and stairways at a height exceeding
………………………………….(to be specified)
(i ) every working platform and every gangway shall be closely boarded unless other adequate measures
are taken to ensure safety.
(ii) every working platform and every gangway shall have adequate width, and
(iii) every working platform, gangway, working place and stairway shall be suitably fenced.
(k) Every opening in the floor of a building or in a working platform shall, except for the time and to the
extent required to allow the access of person or the transport or shifting of materials be provided with
suitable means to prevent the fall of persons or material.
( l )When persons are employed on a roof where there danger of falling from a height exceeding (4.25
mt) 14 ‘ (to be specified ) meters suitable precaution . Shall be taken to prevent the fall of persons or
(m) Suitable precautions shall be taken to prevent persons being struck by articles which might fall from
scaffold or other working place .
(n) Safe means of access shall be provided to all working platforms and other working places.
CLAUSE 20 B : The contractor shall comply with the following regulations as regards the hoisting
appliances to be used by him
(a) Hoisting machines and tackle including their attachments, anchorages and supports shall –
(i) be of good mechanical construction, sound material and adequate strength and free from patent
(ii) be kept in good repair and in working order
(b) Every rope used in hoisting or lowering materials or as a means of suspension shall be of suitable
quality and adequate strength and free from patent defect.
(c) Hoisting machines and tackles shall be examined and adequately tested after erection on the site and
before use and be re-examined in position at intervals to be prescribed by Engineer-in-charge.
(d) Every chain, ring, hook, shackle, swivel and pulley block used in hoisting or lowering materials or as a
means of suspension shall be periodically examined.
(e) Every crane driver or hoisting – appliance operator shall be properly qualified.
(f) No person who is below age of 15 years shall be in control of any hoisting machine, including any
scaffolds, nor shall give signals to the operator.
(g) In the case of every hoisting machine and of every chain, ring hook, shackle, swivel and pulley block
used in hoisting or lowering or as a means of suspension the safe working load shall be ascertained by
adequate means.
Savli Nagar Palika Page
(h) Every hoisting machine and all gears referred to in preceding regulation shall be plainly marked with
the safe working load.
( i ) In the case of hosting machine having a variable safe working load, each safe working load and
conditions under which it is applicable shall be clearly indicated.
( j ) No part of any hoisting machine or gear referred to in regulation ‘g’ above shall be loaded beyond
the safe working load except for the purpose of testing.
(k) Motors, gears, transmissions, electric wiring and other dangerous parts of hoisting appliances shall be
provided with sufficient safeguards.
( l ) Hoisting appliances shall be provided with such means as will reduce to a minimum the risk of the
accidental descent of the load.
(m) Adequate precautions shall be taken to reduce to minimum the risk of any part of a suspended load
becoming accidentally displaced.
CLAUSE 21 : Measures for Prevention of Fire :
The contractor shall not set fire to any standing jungle, tree bush wood or grass without a written permit
from the Engineer-in-charge. When such permit is given, and also in all cases when destroying cut or dug
up tree, bush wood, grass etc. by fire, the contractor shall take necessary measures to prevent such fire
spreading to or other-wise damaging surrounding property.When such permit is given and also in all
cases when destroying cut or dug up tress, bush wood, grass etc. by fire, the contractor shall take
necessary measures to prevent such fire spreading to or other-wise damaging surrounding property.
CLAUSE 22 : Liability of contractors for any damages done in or outside work area :
Compensation for all damage done intentionally or unintentionally by Contractor’s labourers whether in
or beyond limits of SAVLI Nagar Palika property including any damage caused by the spreading of fire
mentioned in the clause 22, shall be estimated by the Engineer-in-charge, or such other Officer as he
may appoint and the estimates of the Engineer-in-charge , subject to the decision of the Superintending
Engineer, on appeal , shall be final and the contractor shall be bound to pay the amount of the assessed
compensation on demand, failing which the same will be recovered from the Contractor as damages in
the manner prescribed in clause 1 or deducted by the Engineer-in-charge from any sums that may be
due or become due from SAVLI Nagar Palika to the contractor under this contract or otherwise.
The Contractor shall bear the expenses of defending any action or other legal proceeding that may be
brought by any person for injury sustained by him owing to neglect of precautions to prevent the
spread of the fire and he shall also pay the damages and cost that may be awarded by the court in
Work not to be sublet. Contract may be rescinded and security deposit forfeited for subletting it
without approval or for bribing a public officer or if contractor becomes insolvent:
The contract shall not be assigned or sublet without the written approval of the Engineer-in-charge. And
if the contractor shall assign or sublet his contract or attempt to do so or become insolvent or commence
Savli Nagar Palika Page
any proceeding to get himself be adjudicated an insolvent or make any compromisation with his
creditors, or attempt to do so, the Engineer-in-charge may, by notice in writing rescind the contract, Also
if any bribe, gratuity , gift loan, perquisite, reward or advantage, pecuniary or otherwise, shall either
directly or indirectly be given, promised or offered by the contractor, or any of his servants or agents to
any public officer or person in the employ of SAVLI Nagar Palika in any way relating to his office or
employment, or if any such officer or person shall become in any way directly or indirectly interested in
contract, the Engineer-in-charge may thereupon by notice in writing rescind the contract. In the event of
contract being rescinded, the security deposit of the contractor shall thereupon stand forfeited and be
absolutely at the disposal of SAVLI Nagar Palika and the same consequence shall ensure as if the contract
had been rescinded under clause 3 thereof and in addition the contractor shall not be entitled to recover
or be paid for any work therefore actually performed under contract .
Sums payable by way of compensation to be considered as reasonable compensation without
reference to actual loss :
All sums payable by a contractor by way of compensation under any of these conditions shall be
considered as a reasonable compensation to be applied to the use of SAVLI Nagar Palika without
reference to the actual loss or damage sustained and whether any damage has or had not been
CLAUSE 25 : Change in the constitution of firm to be notified :
In the case of a tender by partners, any change in the constitution of a firm shall be forthwith notified by
the Contractor to Engineer-in-charge for his information.
CLAUSE 26 : (1) Disputes to be referred to Tribunal :
The disputes relating to this contract, so far as they relate to any of the following matters, whether such
disputes arise during the progress of the work or after the completion or abandonment thereof, shall be
referred to the Arbitration Tribunal, Gujarat State.
(i)The rates of payment under clause 5 for any tools, materials and stores, in or upon the works of the
site thereof or belonging to the contractor or procured by him an intended to be used for execution of
the work or any part thereof possession of which may have been taken by the Engineer-in-charge under
the said clause-5
(ii) The Reduction in rates made by the Engineer-in-Charge under clause 9 from the items of works not
accepted as completed fully in accordance with the sanctioned specifications.
(iii) The rate of payment for any class of work which is included in the additional or altered work carried
out by the contractor in accordance with the instructions of the Engineer-in-Charge under clause 14 and
the rates for which is to be determined under the said clause
(iv)The rates of payment for materials already purchased or agreed to be purchased by the contractor
before receipt of notice given by the Engineer-in-Charge under clause 15, and/or the amount of
compensation payable to the contractor under the said clause for loss in respect of such materials.
Savli Nagar Palika Page
(v) The amount of compensation which the contractor shall be liable to pay under clause 17 in the event
of his failure to rectify, remove or reconstruct the work within the period specified in the written
intimation or the amount of expenses incurred by the Engineer-in-Charge under the said clause 17 in
rectifying, removing or re-executing the work or in removing and replacing the materials or articles
(vi) The reduction of rates as may be fixed by the Engineer-in-Charge under clause 17 for the inferior
work or materials as accepted or made use of.
(vii) The amount of compensation payable by the contractor for damages as estimated and assessed
(viii)The amount payable to the contractor for the work carried out under clause 33 in accordance with
the instructions and the requirements of the Engineer-in-Charge in a case where there are no
specifications.
(2) The provision of Section-21 of the GPWD dispute Arbi. Tribunal Act –92 & order issued by the Govt. in
connection with this Act will now apply for Arbitration (As per SAVLI Nagar Palika in N. & W.R.D. letter
(3) The provision of Arbitration Act .,shall in so far as they are inconsistent with the provision of this act
cease of to apply to any dispute arising from a works contract and all arbitration proceedings in relation
to such dispute before an arbitrator, court of authority shall stand transferred to the Tribunal.
(4) The awards declared by the arbitrator should be speaking award, giving reasons and calculations for
every item of claims. The decision will have to be implemented by all the departments of the State SAVLI
Nagar Palika and Public Sector Enterprises of Gujarat. (Resolution F.D.No.
PB/1088/735/KT/Sachivalaya/Gandhinagar 5 October 1988.)
(5) In case of dispute leading to the contractor or SAVLI Nagar Palika of Gujarat approaching to Court of
Law, it shall be within the jurisdiction where the site of work is situated.
(6) The reference to arbitration proceeding under this clause shall not
(i) Affect the right of the Engineer-in-charge under clause 5 to take possession of all or any tools plants
materials and stores in or upon the works of site thereof belonging to the contractor or procured by him
and intended to be used for the execution of the work or any part thereof.
(ii) Preclude the Engineer-in-charge from utilizing the materials purchased by the contractor in any work
or from removing such materials to other places, during the period the work is stopped or suspended in
pursuance of notice given to the contractor under clause
(iii) Entitle the contractor to stop the progress of the work or the carrying out the additional or altered
work in accordance with the provisions of clause 14 or as the case may be or clause
CLAUSE 27 : Lump sum in estimates :
When the estimate on which a tender is made includes lump sum in respect of part of the work, the
contractor shall be entitled to payment in respect of the items of work involved or the part of the work
Savli Nagar Palika Page
in question at the same rates as are payable under this contract for such items, or if the part of the work
in question is not in the opinion of the Engineer-in-charge capable of measurement the Engineer-in-
charge may , as his discretion, pay the lump sum amount entered in the estimate and the certificate in
writing of the Engineer-in-charge shall be final and conclusive against the contractor with regard to any
sum or sums payable to him, under the provisions of this clause.
CLAUSE 28 : Action where no specifications :
In the case of work for which there is no such specification, such work shall be carried out tin accordance
with the Divisional Specification and in the event of there being no Divisional Specifications, then, in such
case the work shall be carried out in all respects in accordance with the instructions and requirements of
the Engineer-in-charge.
CLAUSE 29 :Definition of work :
The expression “work” or “works” where used in these conditions shall, unless, there be something in
the subject or context repugnant to such construction to mean the work, or the works, contracted to be
executed under or in virtue of the contract, whether temporary or permanent and whether original,
altered, substituted or additional.
Contractor’s percentage whether applied to net or gross amount if the bill : Percentage referred to in the
tender shall be deducted from / added to the gross amount of the bill before deducting the value of any
stock issued. (This clause shall be applicable only for B-1 tender)
CLAUSE 31 : Non refund of quarry fees & Royalties :
The contractor shall pay the royalty to the competent authority / local body as per rules. The contractor
shall furnish quarterly the statement showing quantity of quarried materials, from whom purchased (
with full address of the seller ) and copies of bills for purchase to the District Officer of the Mining and
Geology Department of authority competent to levy royalty in the area of work. Contractor shall also
furnish such additional information as regards royalty payment to the Royalty authority. The royalty
charges paid shall be borne by the Contractor and shall not be reimbursed by the Chief Officer (
Authority: - R & B D Circular No. TNC – 2286 – UO – 39 (19) – C dated 23-10-1989.)
Clause 32: Compensation under the workmen’s compensation Act :
The contractor shall be responsible for and shall pay compensation to his workman payable under the
Workman’s Compensation Act. 1923 (VIII of 1923) hereinafter called the said Act) for injuries caused to
the workman. If such compensation is paid by SAVLI Nagar Palika as principal under sub-section 12(1) of
the said Act on behalf of the Contractor it shall be recoverable by SAVLI Nagar Palika from the contractor
under sub section 12(2) of the said section. Such compensation shall be recovered in the manner laid
down in clause 1 above.
The Contractor shall be responsible for and shall pay the expenses of providing medical aid to any
workmen who may suffer a bodily injury as a result of an accident. If such expenses are incurred by
SAVLI Nagar Palika, the same shall be recoverable from the contractor forthwith and be deducted,
Savli Nagar Palika Page
without prejudice to any other remedy of SAVLI Nagar Palika from amount due or that may become
due to the Contractor.
The contractor shall provide all necessary personal safety equipment and first aid apparatus available for
the use of the person employed on the site and shall maintain the same in suitable condition for
immediate use at any time and shall comply with the following regulations in connection therewith.
(a) The workers shall be required to use the equipment so provide by the Contractor and Contractor shall
take adequate steps to ensure proper use of the equipment by those concerned.
(b) When work is carried on in proximity to any place where there is a risk of drowning all necessary
equipment shall be provided and kept for use and all necessary steps shall be taken for the prompt
rescue of any person, in danger.
(c) Adequate provision shall be made for prompt first aid treatment of all injuries to be sustained during
the course of the work.
Clause 33 :The quantities shown in the tender are approximate and no claim shall be entertained for
quantities of work executed being less than those entered in the tender. In the case of increase in the
quantities by more than 30% the new rate will be paid to the contractor for the quantities in excess of
30%The rates for the increased quantities as aforesaid will be fixed in the manner specified in clause –
Clause 34: Employment of famine or other labour : The contractor shall employ any famine, convict or
other labour of particular kind or class, if ordered in writing to do so by the Engineer-in-charge.
Clause 35 : No compensation shall be allowed for any delay caused in the starting of the work on account
of delay in making available the full site of land at a time.
Clause 36 :No claim for compensation shall be allowed for any delay in execution of the work on account
of water standing in borrow pits or compartment. The rates are inclusive of hard or cracked soil,
excavation in mud, sub soil water or water standing in borrow-pits and no claim for an extra rate shall be
entertained unless otherwise expressly specified.
Clause 37 : Entering upon or commencing any portion or work :
The Contractor shall not enter upon or commence any portion or work except with the written authority
and instruction of the Engineer-in-charge or of his subordinate in charge of the work. Failing such
authority, the Contractor shall have no claim to ask measurement of or payment for work.
Clause 38 : Minimum age of person employed :
(I) No Contractor shall employ any person who is under the age of 15 years.
Clause 39 (I) (A) :
The employment of donkeys and / or other animals and the payment of fair wages :For Asphalt work(s)
as far as possible, only the adult persons should be employed by the contractor. If the adult person are
Savli Nagar Palika Page
not available, then the children below the age of 15(Fifteen years ) should not be employed under any
(II) No contractor shall employ donkeys or other animals with branching of string or thin rope. The
branching must be at least three inches wide and should be of tape (Nawar).
(III) No animal suffering from sores, lameness or emaciation or which is immature shall be employed on
(IV) The Engineer-in-charge or his agent is authorized to remove from the work any person or animal
found working which does not satisfy these conditions and no responsibility shall be accepted by
SAVLI Nagar Palika for any delay caused in the completion work by such removal.
(V) The Contractor shall pay fair and reasonable wages to the workman employed by him in the contract
undertaken by him. In the event of any dispute arising between the Contractor and his workmen on
the grounds that the wages paid are not fair and reasonable, the dispute shall be referred without
delay to the Engineer-in-charge who shall decide the same. The decision of the Engineer-in-charge
shall be conclusive and binding on the Contractor, but such decision shall not in any way affect the
conditions in the contract regarding the payment to be made by SAVLI Nagar Palika at sanctioned
tendered rates.
(VI) The contractor shall provide drinking water facilities to the workers/ labourers employed on SAVLI
Nagar Palika works Amenities relating to sanitation shall also be provided to the workers/labourers
employed on works (in urban areas) . If the contractor fails to comply with these provisions, the
Engineer-in-charge shall give notice in writing and if the contractor does not provide this facility to
the workers/ labourers within a period of ten days from the date of the notice in writing, the
Engineer-in-charge shall thereupon make the arrangement for drinking water at the cost of the
(VII) The Contractor shall provide the amenity of proper shed and shelter to the workers/ labourers and
their children on SAVLI Nagar Palika works as soon as the work starts. If the contractor fails to
provide shed and shelter, the Engineer-in-charge shall provide the same at the cost of contractor.
Clause 40 : Method of payment :
Payment to contractor shall be made by cheque drawn on any treasury within the division convenient to
them, provided the amount exceeds Rs. 10 Amount not exceeding Rs. 10 will be paid in cash.
Clause 40 A : Any sum of money due and payable to the Contractor (including the security deposit
returnable to the contractor) executing any SAVLI Nagar Palika work or work of any District Panchayat
wholly financed as grant-in-aid under this contract shall be appropriated by any District Panchayat /
SAVLI Nagar Palika and shall be set off against any claim of the SAVLI Nagar Palika/District Panchayat of
Gujarat state by the District Panchayat of Gujarat State/SAVLI Nagar Palika for the payment of a sum of
money arising out or under any other contract made by the contractor with the SAVLI Nagar
Palika/District Panchayat of Gujarat State for the work wholly the contractor against any claim of the
SAVLI Nagar Palika / District Panchayat of Gujarat state is available, such a recovery shall be made from
the contractor as arrears of land revenue.
Clause 41 : Employment of scarcity labour :
Savli Nagar Palika Page
If SAVLI Nagar Palika declares a state of scarcity or famine to exist in any village situated within
kilometers of the work, the Contractor shall employ upon such parts of the work, as are suitable for
unskilled labour, any person certified to him by the Engineer-in-charge or by any persons to whom, the
Engineer-in-charge may have delegated this duty in writing to be in need of relief and shall be bound to
pay to such persons, wages not below the minimum which SAVLI Nagar Palika may have fixed in this
behalf. Any disputes which may arise in connection with the implementation this clause shall be decided
by the Engineer-in-charge whose decision shall be final and binding on the contractor.
Clause 42 : The rates to be quoted by the Contractor must be inclusive of sales tax . No extra payment
on this account will be made to the contractor.
Clause 43 : The Contractor should, as far as possible , obtain his requirement of labourers skilled and
unskilled , from the nearest Employment Exchange so as to utilize the local employment potential. If
there are no local Employment Exchange or such Exchanges are not able to provide the required labour
locally, suitable labourers should be utilized to the maximum extent possible.
Clause 44 : Fair Wages :
If a Contractor fails to pay within ‘7’ (Seven) days to the labourer(s) /worker(s) the minimum wages
prescribed by the SAVLI Nagar Palika under the Minimum Wages Act. 1948 as in force from time to time,
the Engineer-in-charge shall be at liberty to deduct the amount payable to the labourer/ workers from
his (Contractors) bills or deposit(s) payable by the Contractor after making due inquiries and establishing
the claim(s) of the labourer(s) /Workers(s).
The contractor shall not be entitled to any payment of compensation on account of any loss that the
Contractor may have to incur on account of the action as aforesaid. Before the action as aforesaid, is
enforced, a notice in writing to the Contractor shall be issued by the Engineer-in-charge to pay the wags
as per Minimum Wages Act in force at the relevant time. If Contractor does not act as aforesaid within
seven days, then the action contemplated as above shall be taken against him.
Clause 45 : List of Machinery :
The contractors shall also give a list of machineries in his possession and which they propose to use on
Clause 46 : (i) In case , the roller deployed by Department for the use on contract work is kept idle by
the contractor for want of adequate labour and materials, the contractor will have to pay rental charges
as per prevailing rules even though the items of rolling and watering are to be carried out by the
(ii) If the contractor does not plan his programme so as to suit the requirement of the Department, the
proportionate rental charge on roller shall be recovered from the contractor.
Clause 47 : Local labour on normal rates :
The contractor shall have to engage local labour and person seeking employment where available on
Savli Nagar Palika Page
Clause 48 : Rent will be recovered from the contractor for the land given to them for stacking materials
as well as for construction of temporary hutments etc.
Land measuring Charges
1. One hectare or less Rs.5 Per month
2. More than 1 hectare & up to 2 hectares Rs.10 per month
3. More than 2 hectare & up to 3 hectares Rs.15 per month
4. More than 3 hectare & up to 4 hectares Rs.20 per month
Clause 49 : The contractor shall employ only such labour who shall produce a valid certificate of having
been vaccinated against small-pox within a period of last three years.
1 Huts :The contractor shall build sufficient number of huts on a suitable plot of land for the use of the
laborers according to the following specifications.
(1) Huts of bamboos and grass may be constructed.
(2) A good site shall be selected. High ground removed from jungle but well provided with tress shall be
chosen wherever it is available. The neighborhood of rank jungle, grass or weeds should particularly
be avoided. Camps should not be established close to large cuttings of earth work.
(3) The lines of huts shall have open spaces of at least 10 m. between rows. When a good natural site
cannot be procured, particular attention should be given to the drainage.
(4) There should be no over-crowding. Floor spaces at the rate of 2.8 Sq.m. per head shall be provided.
Care should be taken to see that the huts are kept clean and in good order.
(5) The contractor must find out his own land. If he wants SAVLI Nagar Palika land, he should apply for it
and pay assessment for it.
2. Drinking Water: The contractor shall as far as possible, provide an adequate supply of chlorinated
pure potable drinking water for the use of labourers. This provision shall be at the rate of not less
than 4.5 liters per head. No provision need-be made where there is a suitable nala , river or well
within 0.4 km of the camp. However arrangement should as far as possible, be made to chlorinate
water by chlorinated tables before it is allowed for drinking purpose.
3. The contractor shall construct semi permanent latrines for the use of Labourers on the following
scale, namely (a) Where female are employed, there shall be at least one latrine for every
females. (b) Where males are employed there shall be at least one latrine for every 25 males
provided that where the number of males or female exceed 100 , it shall be sufficient if there is one
latrine for every 25 males or females , as the case may be up to the first 100 and one for every
Savli Nagar Palika Page
4. Privacy in latrines: Every latrine shall be under cover and so partitioned off as to secure privacy, and
shall have a proper door and fastenings.
5. Notice to be displayed outside latrines and urinals :(1) Where workers of both sexes are employed
there shall be displayed outside each block of latrine and urinal a notice in the language understood
by the majority f the workers For Men Only or For Women Only : as the case may be.
(2) The notice shall also bear the figures of a man or of a women, as the case may be .
6. Urinals : There shall be at least one urinal for male/female workers up to 50 employed at a time .
Provided that where the number of male or female workmen, as the case may be, exceeds 500, it
shall be sufficient if there is one urinal for every 50 males or females up to the first 500 and one for
every 100 males or females or part thereof.
7. Latrines and Urinals to be accessible:(1) The latrines and urinals shall be conveniently situated and
accessible to workers at all times at the establishment. (2) (i ) The latrines and urinals shall be
adequately lighted and shall be maintained in a clean and sanitary condition at all times (ii) Latrines
and urinals other than those connected with a flush sewage system shall comply with the
requirements of the Public Health Authorities.
8. Water for latrines and urinals:Water shall be provided by means of pipes or tanks or otherwise, so
also be conveniently accessible in or near the latrines and urinals.
9. Bathing and washing places:(1) The contractor shall construct sufficient number of bathing places.
Every unit of 20 persons being provided with a separate bathing place. (2) Washing places should
also be provided for the purposes of washing clothes. Every unit of 30 persons shall have at least one
washing place. (3) Such bathing and washing places should be suitably screened and separate places
provided for male and female workers. (4) Such facilities shall be conveniently accessible and shall be
kept in clean and hygienic condition.
10. Drainage : The contractor shall make sufficient arrangement for draining away the sewerage water as
well as water from the bathing and washing places and shall dispose off this waste water in such as
way as not to cause nuisance. The contractor should obtain a permission from the Gujarat Water
Pollution Control Board, Gandhinagar if Water is so be drained in river or near the well . The
contractor would put malaria oil once in a week in stagnant water round about the residence.
11. Medical facilities:The contractor shall engage a medical officer with a traveling dispensary for a camp
having 500 or more persons if there is no SAVLI Nagar Palika or other private dispensary situated
within 6 km. from the camp.
12. Conservancy and cleanliness: The contractor shall provide the necessary staff for effecting the
satisfactory conservancy and cleanliness of the camp to the satisfaction of the Engineer-in-charge .At
Savli Nagar Palika Page
least one sweeper per 200 persons should be engaged. Conservancy staff should dump refuge in
compost pit, away from the labour camp.
13. Health Provisions: The District Health Officer of the District or the Deputy Director of Health Service
shall be consulted before opening a labour camp and his instructions on matters, such as the water
supply, sanitary convenience, the camp-site, accommodation and food supply shall be followed by
the contractor.
14. Precautions against epidemic : (a) The authorities in charge of the colonies should get the
labourersinoculated against cholera and plague and vaccinated against smallpox at the time or
recruitment , if they are not inoculated or vaccinated within 6 months or 3 years respectively prior to
the date of recruitment. (b) When, in any labour camp there is an epidemic disease or is threatened
with such an outbreak, the authorities in charge of the labour camps should ensure that all the
inmates of the labour colonies are inoculated or vaccinated as the case may be , depending on the
diseases, within 72 hours after the outbreak. (c) The authorities in charge of the labour colony should
arrange to communicate by wire regarding the outbreak of the epidemic diseases on the very day of
the outbreak, to the Mamlatdar of the Taluka, the District Health officer or to the Deputy Director of
Public Health in charge of that area and the Director of Public Health. Thereafter they should
continue to send daily reports to the above officers in the prescribed form regarding the progress of
the epidemic disease. (d) When the authorities in charge of the labour colony suspect or have reason
to believe that any immediate of the labour colonies is suffering from the infectious or contagious
disease , they shall forthwith arrange for the segregation of such persons to isolated huts to be
specifically provided for the purpose and also for their treatment (e) As regional malaria epidemic
outbreaks are likely to occur in such project areas, the authorities in charge of the labour colonies
should report promptly the occurrence of unusual incidence of cases of malaria and also inform the
District Health Officer of the District, Deputy Director of Public Healthy (Malaria) and the Director of
Public Health and also arrange to institute all necessary anti malarial measures as may be advised by
the officials of the Public Health Department. (f) The authorities in charge of the colonies should also
arrange to carry out any other measures that may be recommended by the officials of the Public
Health Department necessary to prevent or control the spread of disease.
15. Rest rooms: (1) In every place where in contract labour is required to halt at night in connection with
the contract works and in which employment of contract labour is likely to continue for three month
or more, the contractors shall provide and maintain rest rooms or other suitable alternative
accommodation within fifteen days of the employment of contract labour.
(2) If the amenity referred to in sub rule is not provided by the contractor within the period prescribed,
the employer shall provide the same within a period of fifteen days of the expiry of the period laid
down in the sub-rule (1).
(3) Separate rooms shall be provided for women employees.
(4) Effective and suitable provision shall be made in every rooms for securing and maintaining adequate
ventilation for the circulation of fresh air and there shall also be provided and maintained sufficient
and suitable natural or artificial lighting.
Savli Nagar Palika Page
(5) The rest room or other suitable alternative accommodation shall be of such dimensions as to provide
at least a floor area of 1. Sq. mt. For each person making use of rest rooms.
(6) The rest room or other suitable alternative accommodation shall be so constructed as to afford
adequate protection against heat, wind, rain, and shall have smooth, hard and impervious surface.
(7) The rest rooms or other suitable alternative accommodation shall be at a convenient distance from
the establishment and shall have adequate supply of whole some drinking water.
16. CanteenFacilities:(1) In every establishment of contract work and wherein work regarding the
employment of contract labour is likely to continue for six months and wherein contact labour
numbering one hundred or more are ordinarily employed, the adequate canteen facilities shall be
provided by the contractor for the use of such contract labour within sixty days of the commencement of
the employment of contract labour.
(2) If the contractor fails to provide the canteen facilities within the time limit laid down the same shall
be provided by the principal employer within sixty days of the time allowed to the contractor.
(3) The canteen shall be maintained by the contractor or principal employees as the case may be in an
efficient manner.
17. Accommodation in canteen:(1) The canteen shall consist of at least dining hall, kitchen, store room,
pantry, and washing places separately for worker and for utensils.
2 (I) The canteen shall be sufficiently lighted at all times where any person has access to it.
(ii) The floor shall be made of smooth and impervious materials and inside walls shall be lime-washed or
colour-washed at least once in each year, provided that the inside walls of the kitchen shall be lime-
washed every four months.
3 (i) The premises of the canteen shall be maintained in clean and sanitary condition.
(ii) Waste water shall be carried away in suitable covered drains and shall not be allowed to accumulate
so as cause nuisance.
(iii) Suitable arrangements shall be made for the collection and disposal of garbage.
18. Accommodation in dining hall : (1) The dining hall shall accommodate at a time, at least 30% of the
contract labour working at a time.
(2) The floor area of the dining hall excluding the area occupied per dinner to be accommodated shall as
prescribed in subrule (i)
(3) (I) A portion of the dining hall and service counter shall be partitioned and reserved for women
workers, in proportion to their numbers. (ii) Washing places for women shall be separate and
screened to secure privacy.
(4) Sufficient table, stools, chairs or benches shall be available for the number of diners to be
accommodated as prescribed in sub rule
19. Equipment in canteen:
Savli Nagar Palika Page
(i) There shall be provided and maintained sufficient utensils, crockery, cutlery, furniture and any other
equipment necessary for the efficient running of the canteen.
(ii) The furniture utensils and other equipment shall be maintained in a clean and hygienic condition.
(2) (i) Suitable clean clothes for the employees serving in the canteen shall also be provided and
(ii) A service counter, if provided, shall have a top of smooth and impervious materials.
(iii) Suitable facilities including an adequate supply of hot water shall be provided for the cleaning of
utensils and equipment.
20. Food stuff to be served: The food stuff and other items to be served in the canteen shall be in
conformity with the normal food habits of the contract labour.
21. Prices to be displayed: The charges for food stuffs, beverages and any other item served in the
canteen shall be based on “no profit, no loss” and shall be conspicuously displayed in the canteen.
22. Canteen to be run on “No profit no loss” basis:In deriving the prices of food stuffs and other articles
served in the canteen, the following items shall not be taken into consideration as expenditure, namely.
(a) the rent for the land and building.
(b) The depreciation and maintenance charges for the building and equipment provided for in the
(c) The cost of purchase, repairs and replacement of equipment including furniture, crockery, cutlery
(d) The water charges and other charges incurred for lighting and ventilation.
(e) The interest on the amount spent on the provisions and maintenance of furniture and equipment
provided for in the canteen.
The local officers should check up whether, facilities as offered and which are admissible under the
existing rules and orders are made available to the workers and enforce upon the contractors the
necessity of adhering to the instructions for promotion of welfare of the workers according to the terms
of the contract .
CLAUSE 51 : Contractor shall have to arrange for the supply of gumboots. Hand gloves, mask etc.
invariably to the labourers/workers engaged by the contractor on asphalt work.
CLAUSE 52 : The Contractor shall not show any distinction between Harijan and other class of labourers /
workers employed to carry out the SAVLI Nagar Palika work.
CLAUSE 53 : FENCING AND LIGHTING
(a) The contractor shall, unless otherwise specified, be responsible for the proper fencing, lighting
guarding and taking of the necessary safety measures for all works comprised in the contract and for the
proper provision of temporary road, way, foot-way , guards, fences, caution notices, etc. as far as the
same may be rendered necessary by reasons of the work for the accommodation of workmen, foot
passengers or other traffic and of owners and occupiers of adjacent property and the public and shall
Savli Nagar Palika Page
remain responsible for any accident that may occur on account of his failure to take proper & timely
(b) All the arrangements made for fencing and lighting shall be maintained by the contractor through
the currency of the contract till the physical taking over of the work by department.
CLAUSE 54 : LIABILITY OF ACCIDENTS TO PERSONS :
Responsibilities and liabilities lf the contractor under Workmen’s Compensation Act are given in clause
No.37. In addition following shall also apply:
(a) On the occurrence of an accident, which result in death of workmen employed by the contractor or
which is so serious as likely to result in death of any such workmen the contractor, shall within
hours of happening of such accident(s) intimate, in writing to Engineer-in-Charge the fact of such
accidents. The contractor shall indemnitySAVLI Nagar Palika against all loss or damage sustained by
the SAVLI Nagar Palika resulting directly or indirectly from his failure to give intimation in the
manner aforesaid including the penalties or fines, if any, payable by the SAVLI Nagar Palika as a to
the provisions of the said act in regard to such accident(s).
(b) In the case of an accident, in respect of which compensation may become payable under
Workmen’s Compensation Act. whether by the contractor or by the SAVLI Nagar Palika as principal
Employer, it shall be lawful for the Engineer-in-charge to retain out of money due and payable to the
Contractor, such sum or sum of money as may, in the opinion of the Engineer-in-charge, be
sufficient to meet such a liability, The opinion of the Engineer-in-charge shall be final regard to all
matters arising under this clause.
CLAUSE 55 : ACCESS TO SITE AND WORK ON SITE :
The Engineer may , if he considers fit from time to time, enter upon any land(s) which may be in
possession of the contractor under this contract for the purpose of executing any work not included in
this contract by agents or by other contractors, at this opinion and the contractor shall, in accordance
with the requirements of the Engineer-in –charge , afford all reasonable facilities for execution of the
work including occupation of lands by structure or otherwise for any other contractor employed by the
SAVLI Nagar Palika and his workmen for the workmen of the SAVLI Nagar Palika who may be employed in
the execution on or near the site of the work not included in the contract or of any contract in
connection with or ancillary to the work and in default, the contractor shall be liable to the SAVLI Nagar
Palika for any delay or expenses incurred by reason of such default. Provided always that if damage
arising. Make a statement of the same to the Engineer-in-charge who shall from time to time, assess the
value in his judgment of such damage and the SAVLI Nagar Palika shall from time to time pay to the
contractor the amounts (if any) accepted as justified by the Engineer-in-charge :
CLAUSE 56 : REPORTS REGARDING LABOUR :
The Contractor shall submit the following reports to the Engineer-in-charge:
(a) (I) A daily report in the suitable form of the strength of labour, both skilled and unskilled employed
by him on the work(s). The contractor shall increase or decrease the strength both skilled or
unskilled. if directed by the Engineer-in-charge. The submission of such reports shall not, however
relieve the contractor of his responsibilities and duties regarding progress or any other obligation
under the contract
Savli Nagar Palika Page
(ii) A classified weekly return in the suitable form of the number of person employed on the works
during the preceding week.
(iii) A weekly medical report in the suitable form showing the health of the contractor’s camp. The
number of persons ill or incapable and the nature of their illness.
(iv) A report of any accident, which may have occurred, to be sent within 24 hours of the occurrence.
(v) Such other report as may be prescribed.
CLAUSE 57 : Treasure Trove
In the event of discovery by the contractor or his employees, during the progress of work of any gold,
silver, oil or other minerals of any description and precious stones , treasures, coins, antiquities, relic,
fossils or other articles or value of interest whether geological, archaeological or any other such treasure
& other things shall be deemed to be the absolute property of the SAVLI Nagar Palika and the contractor
shall duly preserve the same to the satisfaction of the Engineer-in-charge , from time to time, and relieve
the same to such persons as the Engineer-in-charge may appoint.
The contract shall take all reasonable precautions to prevent his workmen other person from removing
or damaging any such articles or things, immediately after the discovery thereof and before removal
acquaint the Engineer-in-charge with discovery and carry out his orders for the disposal of the same.
CLAUSE 58 : Indemnity :
The contractor shall indemnify the SAVLI Nagar Palika against all actions, suits, claims & demands
through or made against the Department in respect of work of this contractor against any loss damage
to Department in consequence of any action or suit being brought against the contractor for anything
done or omitted to be done in execution of the work of this contract.
CLAUSE 59 :Insurance of Laborus :
The contractor shall be responsible to arrange for insurance of all laboures, skilled and unskilled workers,
supervisors etc. employed by him as per labour regulation of the State.
CLAUSE 60: Setting Out :
The contractor shall be responsible for the true and proper setting out of the works and the correctness
of positions, levels, dimensions and alignments of all parts of the work and for the provisions of all
necessary instruments, appliance and labour in connection therewith. if , at any time during the progress
of the work, any errors, appear or arise in the position , levels, dimensions or alignments of any part of
the work, the contractor, on being required to rectify such errors by the Engineer-in-charge shall at his
own expense do so to the satisfaction of the Engineer-in-charge . if however, such error is based on
incorrect data supplied in writing by the Engineer-in-charge , the expenses of rectifying the same shall be
borne by the Department. The checking of and setting out of any line or level by the Engineer-in-charge
or his representative shall not in any way, relieve the contractor of his responsibilities for the correctness
of the error. The contractor shall carefully protect and observe all bench-mark, site-nails, page and other
things used in setting out of the work(s)/
Savli Nagar Palika Page
CLAUSE 61 : Cement Register :
A register in the prescribed form showing day-to-day receipt, consumption and balance of cement on
site of work will be maintained by the Department, which shall invariably be signed daily by the
contractor or his authorized representative in token of its correctness.
CLAUSE 62 : Materials and Works Test Register :
A register in the prescribed from showing day-to-day receipt, consumption and balance of cement on
site of work by the Department and every entry thereof shall invariably be signed by the Contractor or
his authorized representative in taken of its correctness.
CLAUSE 63 : Progress Schedule :
(a) The contractor shall furnish within one month (unless extended by the Engineer-in-charge) of the
order to start the work, the progress schedule in quadruplicate indicating the date or staring. The
monthly progress expected to be achieved and the anticipated completion date of each major item of
work to be done by him, also indicating dates of, procurement and setting up the materials, plants and
machinery. The schedule should include a statement of proposed general and detailed arrangements for
carrying out works, and of item , order and manner in such it is proposed general and detailed
arrangements for caring out works, and of item, order and manner in which it is proposed that these
shall be executed. The practice to the achievement towards completion of the work in the time limit and
of the particular items on the dates specified in the contract and shall have the approval of the Engineer-
in-charge. Further the dates for the progress, as in this schedule shall be adhered to.
(a) in case it is sound necessary, at any stage to alter the schedule. the contractor shall submit in good,
time a revised schedule incorporating necessary modification proposed and get the same approved
from the Engineer-in-charge . No revised schedule shall be operative without such acceptance in
writing. The Engineer-in-charge is further empowered to ask for more detailed schedule or schedule.
any by week, for any item or items and the contractor shall supply the same as and when asked for.
(b) The Engineer-in-charge shall have, at all times, the right, without in any way vitiating this contract
forming grounds for any claim, to after the order of the work of any part thereof and the contractor
shall after receiving such direction, proceed in the order directed. The contractor shall also revise the
progress. Schedules accordingly and submit four copies of the revised schedule to the Engineer-in-
charge within seven days of the said Engineer's direction to alter the order of works.
(c) The contractor shall furnish sufficient plant, equipment and labour and shall work such hours and
shifts as may be necessary to maintain the progress of the work as per approved progress-schedule,
The working and shift shall company with all the SAVLI Nagar Palika regulations in force and shall be
such, as may be approved by the Engineer-in-charge and the same not be varied without the prior
approval of Engineer-in-charge.
(d) The contractor shall from time to time, as may be required by the Engineer-in-charge, furnish to
Engineer-in-charge with a statement in writing of the arrangements he proposes to adopt for the
execution of this contract and the Engineer-in-charge may, if he considers necessary at any time
advice alternation in the same. Which the contractor shall adopt on notice thereof.
(e) The progress-schedule(s) shall be in the form of progress chart, forms, statements and/ or reports as
may be approved by the Engineer-in-charge.
The contractor shall submit four copies showing the progress of the work in the form of a chart etc.
at periodical intervals as may be specified by Engineer-in-charge.
Savli Nagar Palika Page
(f) The approval of the progress schedules by the Engineer-in-charge shall not relieve the contractor of
schedule required by the Engineer-in-charge and shall not entitle the contractor to any extra
Before starting the work, the contractor will have to obtain the license from the District Assistant Labour
Commissioner under the Contract Labour (Regulation and Abolition) Act. 1970 and contract Labour
(regulation and Abolition ) Gujarat Rules 1972 after paying necessary fees and deposit on the basis of the
number of labourers to be employed on the work and will have to supply two true copies of the said
license to the Deputy Chief Officerbefore the work is started.
Savli Nagar Palika Page
Annexure: The information in the following annexure specimens should be furnished on separate letter
pad if necessary.
(Referred to Condition No.-2 General Rules and Direction for the guidance of Contractors. )
The Chief Officer,
SAVLI Nagar Palika,
SAVLI, Dist. VADODARA.
PLACE :SAVLI DATE :
Savli Nagar Palika Page
Details regarding my / our partners our Company (in the case of limited Company Names, address(es)
telephone number(s) income tax etc. are as under :
Sr. Name(s) of Full address of Telephone Residential Telephone Full address of
Person/Partnerthe place of No.(s) address(es) income tax office
no. Director of the business (with No.(s) ward where
company pin code) (office) (Resi.) income tax return
I/We hereby agree to intimate you about change if any, in the above-mentioned address(es) and
telephone No. (s) Within Fifteen days of its occurrence till my/our deposit, for the said work paid by
me/us is not returned to me/us.
Dated Signature of Tenderer
LIST OF WORKS ALREADY COMPLETED BY THE TENDERER
Sr. Name of work Place Cost on Time taken in Remarks
completion months To
No. complete the work
Savli Nagar Palika Page
Note : Necessary certificate from office concerned shall be attached with the tender
DECLARATION REGARDIG WORKS ON HAND WITH TENDERER
Sr. Name Place Estimated Date of issue ofStipulated Amount of work Brief details of Remark
Cost work order period of done on date of delay if any
No. of completion filling tender
Savli Nagar Palika Page
Note 1 : Amount of work in column 6 should be given up to the month previous to the month in which
tenders are invited.
Note 2 : Necessary certificate from the officer concerned shall be attached with the tender.
Savli Nagar Palika Page
11 SCHEDULE - C
(See clause No. -2 )
Time Schedule, for completion of different designated parts of the work and rate of liquidated to be
Contractor, if he fails to complete the part of work within stipulated time limit is as detailed below:
Time Schedule of Completion
Percentage of time of the Percentage of work Rate of liquidated damages
Savli Nagar Palika Page
(As corrected vied B & CD GR. No. TNC - 1091 - IB - 10/(11) - C , dated 29-6-92)
Signature of the Contractor
Savli Nagar Palika Page
Savli Nagar Palika Page
SAVLI Nagar Palika
Name of work : CONSTRUCTION WORK OF C.C. ROAD VERIOUS PLACE OF SAVLI AT SAVLI FOR SAVLI NAGAR
PALIKA, SAVLI DISTRICT: VADODARA.
no Name of Work Amount
1 Construction Work of CC Road From Homeopathy Medicine College to Girls
Hoste at Savli Nagar Palika Area, Savli, District: Vadodara.
2 Construction Work of CC Road From Baliya dev Mandir to Swaminarayan
Mandir at Savli Nagar Palika Area, Savli, District: Vadodara.
3 Construction Work of CC Road From Rail Way Station to Lus Park Soc at Savli
Nagar Palika Area, Savli, District: Vadodara.
4 Construction Work of CC Road From Poich Chokadi To Bhatiya Sump at Savli
Nagar Palika Area, Savli, District: Vadodara.
5 Construction Work of CC Road From Bhatiya Gruond to Navi school at Savli
Nagar Palika Area, Savli, District: Vadodara.
6 Construction Work of CC Road From Verai Mata Main Road to WTP at Savli
Nagar Palika Area, Savli, District: Vadodara.
7 Construction Work of CC Road From Udalpur Main Road to Shakti Mandir at
Savli Nagar Palika Area, Savli, District: Vadodara.
8 Construction Work of CC Road From Javaripura Main Road to Kanakbhai patel
Farm at Savli Nagar Palika Area, Savli, District: Vadodara.
9 Construction Work of CC Road at Javaripura Chokadi pase Mukeshbhai
Manubhai Patel farm at Savli Nagar Palika Area, Savli, District: Vadodara.
Engineer Chie Officer President
Stamp With Signature Of
SAVLI Nagar Palika SAVLI Nagar Palika SAVLI Nagar Palika
SAVLI SAVLI SAVLI
Savli Nagar Palika Page
SAVLI Nagar Palika
Name of work : CONSTRUCTION WORK OF C.C. ROAD VERIOUS PLACE OF SAVLI AT SAVLI FOR SAVLI NAGAR
PALIKA, SAVLI DISTRICT: VADODARA.
Name Of Work :- Construction Work of CC Road From Homeopathy Medicine College to
Girls Hoste at Savli Nagar Palika Area, Savli, District: Vadodara.
Sr No. Description Qty. Rate per Amount
Filling in foundation and plinth with murrum or selected
1 soil in layers of 20cm. thickness including watering,
ramming and consolidating etc. complete
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
2 excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead
Providing and laying Compacted WBM (Grade II) with BT
crushed metal of size 40mm to 63mm) including using
20% stone Screening 10 mm to 6 mm grit 0.16 cum and
3 stone dust 0.08 cum as filler including for Spreading,
watering & consolidation by vibrator power road roller
tone to 12 tone etc complete as per morth clause
Providing and laying cement concrete 1:2:4 (1- Cement :
2- Coarse sand : 4- graded stone aggregates 20 mm
nominal size) and curing complete excluding cost of
formwork in (A) Foundation and Plinth
Providing and laying controlled cement concrete M.250
and curing complete excluding the cost of formwork and
5 reinforcement for reinforced concrete work in (A)
Foundations, footings, Base of columns and Mass
Savli Nagar Palika Page
Providing & Laaying M.S. Side rail of road thickness with
necessry nut bolt plates, fixing as per width,applaying
plates vibrator, electric or diesel on channel.comp.with
V.D. System ( Trimix) by using the necessary equipments
6 7 material & Machinery,such as running screed vibrator
on prelaid M.S. channel for leveling vaccum pumps,
floating & power trowling etc.compl.including 10 mm
gruv cutting center and every 4 mtr and filling gap with
bituminous also including 3 kg to 5 kg per smt
Name Of Work :-Estimate for Construction Work of CC Road From Baliya dev Mandir to
Swaminarayan Mandir at Savli Nagar Palika, District: Vadodara.
Sr No. Description Qty. Rate per Amount
Demolition including stacking of serviceable materilas
1 and disposal of unserviceable materials with all lead and 1.00 1046.12 Cumt
lift. (i) R.C.C. Work .
Excavation for pipe line trenches for water supply,
sewerage line, manhole etc. all with shoring and struting
if required as per required gradient and line including
safety provisions using site rails and stacking excavated
stuff including up to all required lead cleaning the site
etc. complete for all lifts and strata as specified. A In all
sorts of soil and soft murrum (A)Upto 1.50 mt depth .
Providing and supplying ISI Standard R.C.C. pipes(of
Sulphate Resisting Cement) in standard lengths of
following class and diameter suitable for either collar
joints or rubber ring joints including all taxes, insurance,
3 transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to
departmental stores, stacking etc. complete. (IS - 458/
1989) Class NP3 Test Pressure 0.7 Kg/sq.cm 450 mm Dia
PG-15, Sec-1A, I.NO.10.2.D /17
Lowering, laying and jointing R. C. C. pipes in C. M. 1:1
1/2 of following diameters in proper position, grade and
alignment at all level as directed by Engineer-in-charge
including conveyance from stores to site of work,
labour, giving hydraulic testing as per ISI code. 450 mm
dia Pg.39, Labour Sec-Part1&2, I.NO.11.B/21
Savli Nagar Palika Page
Refilling the pipeline trenches incl. ramming, watering,
consolidating desposal of surplus stuff as directed
5 within a radius of 3 km.
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
6 excavated stuff and disposing on the road side slopes as
directed up to 50 m. Lead.
Providing and laying Compacted WBM (Grade II) with BT
crushed metal of size 40mm to 63mm) including using
20% stone Screening 10 mm to 6 mm grit 0.16 cum and
7 stone dust 0.08 cum as filler including for Spreading,
watering & consolidation by vibrator power road roller
tone to 12 tone etc complete as per morth clause
P.C.C. M-10 levelling Course Providing and casting in situ
mass cement concrete in grade M-10 (approx. corresp.
to prop. 1:3:6) using granite quartzite trap metal of size
12 mm to 25 mm incl. consolidation curing etc.
Complete 2.2 Without Forms Work
C.C. M-25 Control concrete for water retaining
structures Providing and cast in situ C.C. in grade M-25
proportions of ingredients as per mix design by weigh
batching using granite, quartzite trap metal of size
mm to 20 mm and or 6 mm to 12 mm including
scaffolding centering formwork, needle vibrated
consolidation, curing and hydraulic testing etc. complete
(excluding cost of reinforcement) with centering and
shuttering/deshuttering etc. comp. up to 6 meter height
/depth Av. G.L.for all water retaining structures .
Providing and laying controlled cement concrete M.250
and curing complete excluding the cost of formwork
10 and reinforcement for reinforced concrete work in (A)
Foundations, footings, Base of columns and Mass
concrete. Minimum Cement level 380kg/cmt
Savli Nagar Palika Page
Providing & Laaying M.S. Side rail of road thickness with
necessry nut bolt plates, fixing as per width,applaying
plates vibrator, electric or diesel on channel.comp.with
V.D. System ( Trimix) by using the necessary equipments
11 7 material & Machinery,such as running screed vibrator
on prelaid M.S. channel for leveling vaccum pumps,
floating & power trowling etc.compl.including 10 mm
gruv cutting center and every 7 mtr and filling gap with
Name Of Work :- Construction Work of CC Road From Rail Way Station to Luis Park Soc
at Savli Nagar Palika Area, Savli, District: Vadodara.
Sr No. Description Qty. Rate per Amount
Filling in foundation and plinth with murrum or selected
1 soil in layers of 20cm. thickness including watering,
ramming and consolidating etc. complete
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
2 excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead
Providing and laying Compacted WBM (Grade II) with BT
crushed metal of size 40mm to 63mm) including using
20% stone Screening 10 mm to 6 mm grit 0.16 cum and
3 stone dust 0.08 cum as filler including for Spreading,
watering & consolidation by vibrator power road roller
tone to 12 tone etc complete as per morth clause
Providing and laying cement concrete 1:2:4 (1- Cement :
2- Coarse sand : 4- graded stone aggregates 20 mm
nominal size) and curing complete excluding cost of
formwork in (A) Foundation and Plinth
Providing and laying controlled cement concrete M.250
and curing complete excluding the cost of formwork and
5 reinforcement for reinforced concrete work in (A)
Foundations, footings, Base of columns and Mass
Savli Nagar Palika Page
Providing & Laaying M.S. Side rail of road thickness with
necessry nut bolt plates, fixing as per width,applaying
plates vibrator, electric or diesel on channel.comp.with
V.D. System ( Trimix) by using the necessary equipments
6 7 material & Machinery,such as running screed vibrator
on prelaid M.S. channel for leveling vaccum pumps,
floating & power trowling etc.compl.including 10 mm
gruv cutting center and every 4 mtr and filling gap with
bituminous also including 3 kg to 5 kg per smt
Name Of Work :Construction Work of CC Road From Poich Chokadi To Bhatiya Sump
at Savli Nagar Palika Area, Savli, District: Vadodara.
Sr No. Description Qty. Rate per Amount
Demolition including stacking of serviceable materilas
1 and disposal of unserviceable materials with all lead and 5.00 1046.12 Cumt
lift. (i) R.C.C. Work .
Excavation for pipe line trenches for water supply,
sewerage line, manhole etc. all with shoring and struting
if required as per required gradient and line including
safety provisions using site rails and stacking excavated
stuff including up to all required lead cleaning the site
etc. complete for all lifts and strata as specified. A In all
sorts of soil and soft murrum (A)Upto 1.50 mt depth .
Providing and supplying ISI Standard R.C.C. pipes(of
Sulphate Resisting Cement) in standard lengths of
following class and diameter suitable for either collar
joints or rubber ring joints including all taxes, insurance,
3 transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to
departmental stores, stacking etc. complete. (IS - 458/
1989) Class NP3 Test Pressure 0.7 Kg/sq.cm 450 mm Dia
Lowering, laying and jointing R. C. C. pipes in C. M. 1:1
1/2 of following diameters in proper position, grade and
4 alignment at all level as directed by Engineer-in-charge
including conveyance from stores to site of work,
labour, giving hydraulic testing as per ISI code. 450 mm
Savli Nagar Palika Page
Refilling the pipeline trenches incl. ramming, watering,
consolidating desposal of surplus stuff as directed
5 within a radius of 3 km.
Filling in foundation and plinth with murrum or selected
6 soil in layers of 20cm. thickness including watering,
ramming and consolidating etc. complete
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
7 excavated stuff and disposing on the road side slopes as
directed up to 50 m. Lead.
Providing and laying Compacted WBM (Grade II) with BT
crushed metal of size 40mm to 63mm) including using
20% stone Screening 10 mm to 6 mm grit 0.16 cum and
8 stone dust 0.08 cum as filler including for Spreading,
watering & consolidation by vibrator power road roller
tone to 12 tone etc complete as per morth clause
P.C.C. M-10 levelling Course Providing and casting in situ
mass cement concrete in grade M-10 (approx. corresp.
to prop. 1:3:6) using granite quartzite trap metal of size
12 mm to 25 mm incl. consolidation curing etc.
Complete 2.2 Without Forms Work
C.C. M-25 Control concrete for water retaining
structures Providing and cast in situ C.C. in grade M-25
proportions of ingredients as per mix design by weigh
batching using granite, quartzite trap metal of size
mm to 20 mm and or 6 mm to 12 mm including
scaffolding centering formwork, needle vibrated
consolidation, curing and hydraulic testing etc. complete
(excluding cost of reinforcement) with centering and
shuttering/deshuttering etc. comp. up to 6 meter height
/depth Av. G.L.for all water retaining structures .
Savli Nagar Palika Page
Providing and laying controlled cement concrete M.250
and curing complete excluding the cost of formwork
11 and reinforcement for reinforced concrete work in (A)
Foundations, footings, Base of columns and Mass
concrete. Minimum Cement level 380kg/cmt
Providing & Laaying M.S. Side rail of road thickness with
necessry nut bolt plates, fixing as per width,applaying
plates vibrator, electric or diesel on channel.comp.with
V.D. System ( Trimix) by using the necessary equipments
12 7 material & Machinery,such as running screed vibrator
on prelaid M.S. channel for leveling vaccum pumps,
floating & power trowling etc.compl.including 10 mm
gruv cutting center and every 7 mtr and filling gap with
Name Of Work : Construction Work of CC Road From Bhatiya Gruond to Navi school at
Savli Nagar Palika Area, Savli, District: Vadodara.
Sr No. Description Qty. Rate per Amount
Demolition including stacking of serviceable materilas
1 and disposal of unserviceable materials with all lead and 4.00 1046.12 Cumt
lift. (i) R.C.C. Work .
Excavation for pipe line trenches for water supply,
sewerage line, manhole etc. all with shoring and struting
if required as per required gradient and line including
safety provisions using site rails and stacking excavated
stuff including up to all required lead cleaning the site
etc. complete for all lifts and strata as specified. A In all
sorts of soil and soft murrum (A)Upto 1.50 mt depth .
Providing and supplying ISI Standard R.C.C. pipes(of
Sulphate Resisting Cement) in standard lengths of
following class and diameter suitable for either collar
joints or rubber ring joints including all taxes, insurance,
3 transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to
departmental stores, stacking etc. complete. (IS - 458/
1989) Class NP3 Test Pressure 0.7 Kg/sq.cm 450 mm Dia
Savli Nagar Palika Page
Lowering, laying and jointing R. C. C. pipes in C. M. 1:1
1/2 of following diameters in proper position, grade and
alignment at all level as directed by Engineer-in-charge
including conveyance from stores to site of work,
labour, giving hydraulic testing as per ISI code. 450 mm
Refilling the pipeline trenches incl. ramming, watering,
consolidating desposal of surplus stuff as directed
5 within a radius of 3 km.
Filling in foundation and plinth with murrum or selected
6 soil in layers of 20cm. thickness including watering,
ramming and consolidating etc. complete
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
7 excavated stuff and disposing on the road side slopes as
directed up to 50 m. Lead.
Providing and laying Compacted WBM (Grade II) with BT
crushed metal of size 40mm to 63mm) including using
20% stone Screening 10 mm to 6 mm grit 0.16 cum and
8 stone dust 0.08 cum as filler including for Spreading,
watering & consolidation by vibrator power road roller
tone to 12 tone etc complete as per morth clause
P.C.C. M-10 levelling Course Providing and casting in situ
mass cement concrete in grade M-10 (approx. corresp.
to prop. 1:3:6) using granite quartzite trap metal of size
12 mm to 25 mm incl. consolidation curing etc.
Complete 2.2 Without Forms Work
C.C. M-25 Control concrete for water retaining
structures Providing and cast in situ C.C. in grade M-25
proportions of ingredients as per mix design by weigh
batching using granite, quartzite trap metal of size
mm to 20 mm and or 6 mm to 12 mm including
scaffolding centering formwork, needle vibrated
consolidation, curing and hydraulic testing etc. complete
(excluding cost of reinforcement) with centering and
shuttering/deshuttering etc. comp. up to 6 meter height
/depth Av. G.L.for all water retaining structures .
Savli Nagar Palika Page
Providing and laying controlled cement concrete M.250
and curing complete excluding the cost of formwork
11 and reinforcement for reinforced concrete work in (A)
Foundations, footings, Base of columns and Mass
concrete. Minimum Cement level 380kg/cmt
Providing & Laaying M.S. Side rail of road thickness with
necessry nut bolt plates, fixing as per width,applaying
plates vibrator, electric or diesel on channel.comp.with
V.D. System ( Trimix) by using the necessary equipments
12 7 material & Machinery,such as running screed vibrator
on prelaid M.S. channel for leveling vaccum pumps,
floating & power trowling etc.compl.including 10 mm
gruv cutting center and every 7 mtr and filling gap with
Name Of Work : Construction Work of CC Road From Verai Mata Main Road to WTP at
Savli Nagar Palika Area, Savli, District: Vadodara.
Sr No. Description Qty. Rate per Amount
Demolition including stacking of serviceable materilas
1 and disposal of unserviceable materials with all lead and 3.00 1046.12 Cumt
lift. (i) R.C.C. Work .
Excavation for pipe line trenches for water supply,
sewerage line, manhole etc. all with shoring and struting
if required as per required gradient and line including
safety provisions using site rails and stacking excavated
stuff including up to all required lead cleaning the site
etc. complete for all lifts and strata as specified. A In all
sorts of soil and soft murrum (A)Upto 1.50 mt depth .
Providing and supplying ISI Standard R.C.C. pipes(of
Sulphate Resisting Cement) in standard lengths of
following class and diameter suitable for either collar
joints or rubber ring joints including all taxes, insurance,
3 transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to
departmental stores, stacking etc. complete. (IS - 458/
1989) Class NP3 Test Pressure 0.7 Kg/sq.cm 450 mm Dia
Savli Nagar Palika Page
Lowering, laying and jointing R. C. C. pipes in C. M. 1:1
1/2 of following diameters in proper position, grade and
alignment at all level as directed by Engineer-in-charge
including conveyance from stores to site of work,
labour, giving hydraulic testing as per ISI code. 450 mm
Refilling the pipeline trenches incl. ramming, watering,
consolidating desposal of surplus stuff as directed
5 within a radius of 3 km.
Filling in foundation and plinth with murrum or selected
6 soil in layers of 20cm. thickness including watering,
ramming and consolidating etc. complete
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
7 excavated stuff and disposing on the road side slopes as
directed up to 50 m. Lead.
Providing and laying Compacted WBM (Grade II) with BT
crushed metal of size 40mm to 63mm) including using
20% stone Screening 10 mm to 6 mm grit 0.16 cum and
8 stone dust 0.08 cum as filler including for Spreading,
watering & consolidation by vibrator power road roller
tone to 12 tone etc complete as per morth clause
P.C.C. M-10 levelling Course Providing and casting in situ
mass cement concrete in grade M-10 (approx. corresp.
to prop. 1:3:6) using granite quartzite trap metal of size
12 mm to 25 mm incl. consolidation curing etc.
Complete 2.2 Without Forms Work
C.C. M-25 Control concrete for water retaining
structures Providing and cast in situ C.C. in grade M-25
proportions of ingredients as per mix design by weigh
batching using granite, quartzite trap metal of size
mm to 20 mm and or 6 mm to 12 mm including
scaffolding centering formwork, needle vibrated
consolidation, curing and hydraulic testing etc. complete
(excluding cost of reinforcement) with centering and
shuttering/deshuttering etc. comp. up to 6 meter height
/depth Av. G.L.for all water retaining structures .
Savli Nagar Palika Page
Providing and laying controlled cement concrete M.250
and curing complete excluding the cost of formwork
11 and reinforcement for reinforced concrete work in (A)
Foundations, footings, Base of columns and Mass
concrete. Minimum Cement level 380kg/cmt
Providing & Laaying M.S. Side rail of road thickness with
necessry nut bolt plates, fixing as per width,applaying
plates vibrator, electric or diesel on channel.comp.with
V.D. System ( Trimix) by using the necessary equipments
12 7 material & Machinery,such as running screed vibrator
on prelaid M.S. channel for leveling vaccum pumps,
floating & power trowling etc.compl.including 10 mm
gruv cutting center and every 7 mtr and filling gap with
Name Of Work :- Construction Work of CC Road From Udalpur Main Road to Shakti
Mandir at Savli Nagar Palika Area, Savli, District: Vadodara.
Sr No. Description Qty. Rate per Amount
Filling in foundation and plinth with murrum or selected
1 soil in layers of 20cm. thickness including watering,
ramming and consolidating etc. complete
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
2 excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead
Providing and laying Compacted WBM (Grade II) with BT
crushed metal of size 40mm to 63mm) including using
20% stone Screening 10 mm to 6 mm grit 0.16 cum and
3 stone dust 0.08 cum as filler including for Spreading,
watering & consolidation by vibrator power road roller
tone to 12 tone etc complete as per morth clause
Providing and laying cement concrete 1:2:4 (1- Cement :
2- Coarse sand : 4- graded stone aggregates 20 mm
nominal size) and curing complete excluding cost of
formwork in (A) Foundation and Plinth
Savli Nagar Palika Page
Providing and laying controlled cement concrete M.250
and curing complete excluding the cost of formwork and
5 reinforcement for reinforced concrete work in (A)
Foundations, footings, Base of columns and Mass
Providing & Laaying M.S. Side rail of road thickness with
necessry nut bolt plates, fixing as per width,applaying
plates vibrator, electric or diesel on channel.comp.with
V.D. System ( Trimix) by using the necessary equipments
6 7 material & Machinery,such as running screed vibrator
on prelaid M.S. channel for leveling vaccum pumps,
floating & power trowling etc.compl.including 10 mm
gruv cutting center and every 4 mtr and filling gap with
bituminous also including 3 kg to 5 kg per smt
Name Of Work :-Construction Work of CC Road From Javaripura Main Road to
Kanakbhai patel Farm at Savli Nagar Palika Area, Savli, District: Vadodara.
Sr No. Description Qty. Rate per Amount
Filling in foundation and plinth with murrum or selected
1 soil in layers of 20cm. thickness including watering,
ramming and consolidating etc. complete
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
2 excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead
Providing and laying Compacted WBM (Grade II) with BT
crushed metal of size 40mm to 63mm) including using
20% stone Screening 10 mm to 6 mm grit 0.16 cum and
3 stone dust 0.08 cum as filler including for Spreading,
watering & consolidation by vibrator power road roller
tone to 12 tone etc complete as per morth clause
Providing and laying cement concrete 1:2:4 (1- Cement :
4 2- Coarse sand : 4- graded stone aggregates 20 mm
nominal size) and curing complete excluding cost of
Savli Nagar Palika Page
formwork in (A) Foundation and Plinth
Providing and laying controlled cement concrete M.250
and curing complete excluding the cost of formwork and
5 reinforcement for reinforced concrete work in (A)
Foundations, footings, Base of columns and Mass
Providing & Laaying M.S. Side rail of road thickness with
necessry nut bolt plates, fixing as per width,applaying
plates vibrator, electric or diesel on channel.comp.with
V.D. System ( Trimix) by using the necessary equipments
6 7 material & Machinery,such as running screed vibrator
on prelaid M.S. channel for leveling vaccum pumps,
floating & power trowling etc.compl.including 10 mm
gruv cutting center and every 4 mtr and filling gap with
bituminous also including 3 kg to 5 kg per smt
Name Of Work :- Construction Work of CC Road at Javaripura Chokadi pase
Mukeshbhai Manubhai Patel farm at Savli Nagar Palika Area, Savli, District: Vadodara.
Sr No. Description Qty. Rate per Amount
Filling in foundation and plinth with murrum or selected
1 soil in layers of 20cm. thickness including watering,
ramming and consolidating etc. complete
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
2 excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead
Providing and laying Compacted WBM (Grade II) with BT
crushed metal of size 40mm to 63mm) including using
20% stone Screening 10 mm to 6 mm grit 0.16 cum and
3 stone dust 0.08 cum as filler including for Spreading,
watering & consolidation by vibrator power road roller
tone to 12 tone etc complete as per morth clause
Savli Nagar Palika Page
Providing and laying cement concrete 1:2:4 (1- Cement :
2- Coarse sand : 4- graded stone aggregates 20 mm
nominal size) and curing complete excluding cost of
formwork in (A) Foundation and Plinth
Providing and laying controlled cement concrete M.250
and curing complete excluding the cost of formwork and
5 reinforcement for reinforced concrete work in (A)
Foundations, footings, Base of columns and Mass
Providing & Laaying M.S. Side rail of road thickness with
necessry nut bolt plates, fixing as per width,applaying
plates vibrator, electric or diesel on channel.comp.with
V.D. System ( Trimix) by using the necessary equipments
6 7 material & Machinery,such as running screed vibrator
on prelaid M.S. channel for leveling vaccum pumps,
floating & power trowling etc.compl.including 10 mm
gruv cutting center and every 4 mtr and filling gap with
bituminous also including 3 kg to 5 kg per smt
Engineer Chie Officer President
Stamp With Signature Of
SAVLI Nagar Palika SAVLI Nagar Palika SAVLI Nagar Palika
SAVLI SAVLI SAVLI
Savli Nagar Palika Page
SAVLI NagarPalika
Name of work : CONSTRUCTION WORK OF C.C. ROAD VERIOUS PLACE OF SAVLI AT SAVLI FOR SAVLI
NAGAR PALIKA, SAVLI DISTRICT: VADODARA.
I/We am/ are willing to carry out to work @ _____________ % Above /Below ____________
Percentage (Should be written in Figures and Words) of the Estimated rates mentioned above
amount of my/ our Tender work out as under.
Estimated Amount Estimated Amount
Tender Rs. 40566687.00 Tender Rs.
Add % Rs Deduct % Rs.
Total Rs. Total Rs.
(In Words (In Words
Engineer Chie Officer President
Stamp With Signature Of
SAVLI Nagar Palika SAVLI Nagar Palika SAVLI Nagar Palika
SAVLI SAVLI SAVLI
Savli Nagar Palika Page
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender_Document.pdf
BillOfQuantities.pdf
Download all tender documents and submit your bid