Tender Value
₹2.5 Cr
EMD Value
₹14.6 L
Closing Date
5 Dec 2025, 12:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer, Bahraich-Shrawasti Circle, P.W.D., Bahraich
Construction Work Of 9x4x4.00 Meter Span Bridge, Approach Road And Protective Work On The Budhi River Situated Between Ramsahaypurw And Canal Patri Road In Gramsabha Gopiya In District Bahraich (Vidhansabha-Balha)
2025_CEDPW_1093929_1
3578/8 Kam/e_Terndering/2025-26 Dated 12-11-2025
Open Tender
Civil Works - Bridges
360 days
Bahraich
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹14.6 L
Yes
Bahraich
20 Mar 2026
26 Nov 2025
5 Dec 2025
26 Nov 2025
5 Dec 2025
26 Nov 2025
30 Nov 2025
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. MoRTH 15.01; B(I)
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. MoRTH 12.04, 2100
Sand Filling in Foundation Trenches as per Drawing & Technical Specification MoRTH 15.03, 304
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M20 using batching plant transit mixer & manual placing MoRTH 15.04, 1300
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M30 using batching plant transit mixer & manual placing MoRTH 15.11, E Case II
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. MoRTH 15.13, 1600
Flexible Apron :Construction of flexible apron comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. MoRTH 16.11, 2507.2
Dewatering of ground water below spring level for excavation & foundation concreting and brick work including boring of pipe operational and running charge of Diesel pumps complete.:subsurface dewatering
Same as above Item No. 2 but surface dewatering .
Providing and laying Cement concrete wearing coat M-35 grade including reinforcement complete as per drawing and Technical Specifications MoRTH 15.18, 2702
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications MoRTH 15.14, 2706 /2200
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 Carted Earth
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 Local Earth
Excavation for roadwork in soil with hydralic excavator of 0.90 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirement fo lines, graded and cross sections and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000m as per technical specification clause 302.3
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per technical specification. Clause 401.
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405)
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405)
Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at rate of 0.70 Kg/Sqm using mechanical means as per Technical Specification Clause 502. (Including cost of bitumen emulsion)
Providing and applying tack coat with Bitumen VG-10 using Bitumen distributor at the rate of 0.35 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. (Including cost of bitumen VG-10)
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using Bitumen VG-10 to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable mixall, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type as per Technical Specification Clause 508) (Including cost of bitumen VG-10)
Providing and laying seal coat by mixall with VG-10 grade bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510. (Including cost of bitumen VG-10)
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads transporting to site spreading grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000m as per technical specification clause 303.1 (using carted earth)
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads transporting to site spreading grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000m as per technical specification clause 303.1 (using local earth)
Brick edging on both sides of roads of 1st class bricks 8cm (3") wide & 12 cm (4.50") deep laid with mud mortor including labour & suplly of bricks finished to required templete and in proper alignment and also including dressing & ramming the excavated earth including all labour T & P sudries required for completion of work with material.
Excavation in foundation in ordinary soil ( Loam clay, or sand ) including filling lift upto 1.5 metre (5fts.) and lead upto 30 m.(100 fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer - in - charge upto a distance of 30 M. (100 fts.) from the foundation trenches.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Brick masonry work in cement mortar 1:3 foundation complete excluding pointing and plastering as per drawing and technical specification
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row inluding fixing collar with cement mortar 1:2 but backfilling, concrete and masonry works in head parapets clause 1106
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
T2.pdf
Tender Documents • 1.54 MB
BOQ_2011076.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid