| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹1.7 L+₹6,573.45 (4.05%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹2.2 L+₹55,997.85 (34.5%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹2.3 L+₹69,681.75 (42.9%)Rejected-Finance HIMACHAL PRADESH HP | L4 | Rejected-Finance L4 | |
| 5 | L5₹2.4 L+₹77,476.85 (47.8%)Rejected-Finance | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | ANTRIKSH GULERIA L5 | Sanjeevna L1 | dilbag singh L3 | VIKAS KUMAR L4 | SURAJ KUMAR RATTAN L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundations,trenches etc in earth work in all kind of soil, such as pick work, jumper work, blasting hard or soft rock by chiselling where the blasting work is prohibited slushy daldal and saturated soil including pumping or bailing out water with in all heights, stacking the excavated soil within all leads clear from the edge of excavation and then returning the stacked soil in 15cm (fifteen centimetres) layers, when required into plinths, of foundations etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth, as per the direction of Engineer-in-Charge with in all leads and lifts. | 16.08 | cum | 450 ₹7,236 | 200 ₹3,216 Lowest | 250 ₹4,020 | 440 ₹7,075.2 | 350 ₹5,628 |
| 2.00 | Providing and laying Cement concrete 1:6:12 (1 Cement:6 Sand:12 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth complete in all respect as per the dircetion and to the entire satisfection of Engineer-in-Charge within all leads and lifts. | 2.41 | cum | 5,800 ₹13,978 | 3,500 ₹8,435 Lowest | 5,000 ₹12,050 | 5,600 ₹13,496 | 3,500 ₹8,435 Lowest |
| 3.00 | Providing form work with steel plates 3.15 mm thick welded with angles iron in frame 30 x 30 x 5 mm so as to give a fair finish including centering shuttering struting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor two ceiling not exceeding 4 meters and removal of the same for in-situ- reinforced concrete and plain concrete in: Vertical surface such as wall (any thickness) partition and the like i/c attached pillasters, butresses plinth and string course scomplete with in including all leads and lift as per the directions and to the entire satisfaction of Engineer-in-charge. | 61.83 | sqm | 320 ₹19,785.6 | 225 ₹13,911.75 Lowest | 320 ₹19,785.6 | 310 ₹19,167.3 | 240 ₹14,839.2 |
| 4.00 | Providing and Laying of cement concrete 1:5:10 (1:cement :5 sand:10 graded stone aggregate 40mm nominal size) with 15% plum and curing complete excluding cost of form work in R/wall / B/wall the size of plum shall usely be 150mm to 300mm as per PWD specification complete in all respect inclueing all leads & lifts as per the directions and to the entire satisfaction of Engineer-in-charge. | 32.67 | cum | 6,000 ₹1,96,020 | 4,000 ₹1,30,680 Lowest | 5,500 ₹1,79,685 | 5,800 ₹1,89,486 | 4,200 ₹1,37,214 |
| 5.00 | Providing and Fixing of PVC pipe 80 mm dia Finolex/Diplast make complete in all respect as per direction and to the entire satisfaction of Engineer- in- charge up to all leads and lifts. | 30 | rmt | 90 ₹2,700 Lowest | 200 ₹6,000 | 90 ₹2,700 Lowest | 90 ₹2,700 Lowest | 90 ₹2,700 Lowest |
Tender Value
₹2.5 L
EMD Value
₹5,000
Closing Date
11 Aug 2025, 11:00 amClosed
EXECUTIVE ENGINBEER
JAL SHAKTI DIVISION DHARMSAHALA
Construction of Retaining Wall to protect the 40000 liters capacity tank at Tillu
2025_HPIPH_111471_1
NO. EE-JSD-EA-2025-6387-6486
Open Tender
Civil Works
Item Rate
90 days
DSALA
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
₹5,000
12 Aug 2025
1 Aug 2025
11 Aug 2025
1 Aug 2025
11 Aug 2025
4 Aug 2025
1 Aug 2025 - 4 Aug 2025
Amount
Excavation in foundations,trenches etc in earth work in all kind of soil, such as pick work, jumper work, blasting hard or soft rock by chiselling where the blasting work is prohibited slushy daldal and saturated soil including pumping or bailing out water with in all heights, stacking the excavated soil within all leads clear from the edge of excavation and then returning the stacked soil in 15cm (fifteen centimetres) layers, when required into plinths, of foundations etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth, as per the direction of Engineer-in-Charge with in all leads and lifts.
Providing and laying Cement concrete 1:6:12 (1 Cement:6 Sand:12 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth complete in all respect as per the dircetion and to the entire satisfection of Engineer-in-Charge within all leads and lifts.
Providing form work with steel plates 3.15 mm thick welded with angles iron in frame 30 x 30 x 5 mm so as to give a fair finish including centering shuttering struting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor two ceiling not exceeding 4 meters and removal of the same for in-situ- reinforced concrete and plain concrete in: Vertical surface such as wall (any thickness) partition and the like i/c attached pillasters, butresses plinth and string course scomplete with in including all leads and lift as per the directions and to the entire satisfaction of Engineer-in-charge.
Providing and Laying of cement concrete 1:5:10 (1:cement :5 sand:10 graded stone aggregate 40mm nominal size) with 15% plum and curing complete excluding cost of form work in R/wall / B/wall the size of plum shall usely be 150mm to 300mm as per PWD specification complete in all respect inclueing all leads & lifts as per the directions and to the entire satisfaction of Engineer-in-charge.
Providing and Fixing of PVC pipe 80 mm dia Finolex/Diplast make complete in all respect as per direction and to the entire satisfaction of Engineer- in- charge up to all leads and lifts.
SURAJ KUMAR RATTAN (BID ID -542997)
dilbag singh (BID ID -542080)
VIKAS KUMAR (BID ID -542755)
ANTRIKSH GULERIA (BID ID -542773)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .