Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.6 L+₹96.60 (0.06%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.6 L
EMD Value
₹3,220
Closing Date
5 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW BARAMULLA
EXECUTIVE ENGINEER REW BARAMULLA
Construction of Culvert near Masjid shareef lone Mohalla with pbund Manzoor ahmad najar to sadiq najar ward 1 Muqampiran under ADP(PRI) grants for year 2026-27 ,P/H Muqampiran Block -Bijhama
2026_RDPR_316659_4
131/Xen/Rew/Bla/2026-27 Dated 18/07/2026
Open Tender
Civil Works
Percentage
30 days
BARAMULLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹3,220
10 Aug 2026
18 Jul 2026
6 Aug 2026
18 Jul 2026
5 Aug 2026
18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manuall means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: all kinds of soil | - | cum | - | - |
| 2 | Providing/Laying Stone soling Nallah hand packed on level in foundation trenches incl all carraiges of material | - | Cum | - | - |
| 3 | Providing and laying in position plain cement concrete 1:3:6 mix ratio M 10.using 20 mm nominal size agg excluding cost of shuttering i/c curing( all works upto lintel level) | - | cum | 1 | - |
| 4 | P/L in position of reinforced cement concrete for slab/beam (1:1.5:3) by using 20mm N/S agg. | - | cum | 1 | - |
| 5 | Providing and Fixing in position of TMT steel bars for reinforcement steel in the Slab , beam | 1 | kg | - | - |
| 6 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 1 | kg | 1 | ₹1 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Retaining walls, return walls, walls (any thickness) including attached pilasters
buttresses, plinth and string course fillets, kerbs and steps etc. | 1 | sqm | 1 | ₹1 |
| 8 | Carriage of sang/aggregate for 70 km MT and h/l of 500 mts | - | cum | - | - |
| 9 | Add for singn board and photographs | - | Job | - | - |
stage.html
html • 0.02 MB
finance_1033917.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
BOQ_1033917.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .